HomeMy WebLinkAboutNCG020274 DMR SWStormwater Discharge Outfall (SDO)
011Alitntivp Mnnitnrina Rpnnrt
1 4
Certificate of Coverage No.: NCG020274 Facility Name: Pine Mountain Mine & Processing Plant w<
THE QUART Z TM
County: Mitchell Phone No.: 828-765-8956 QUART
CORP
Operator: The Quartz Corp, USA Frequency: Semi -Annual
Receiving Stream: North Toe River
Watershed: Nolichucky; NC, TN
Representative Outfall Status?: No
Basin: French Broad River Basin TMDL 303(d) Listed?: Yes, turbidity 2008
Vehicle Maintenance Monitoring?: , vac (as of il11 2) AZo
Sub -basin: 04-03-06 Stream Class: C;Tr
Water Priority Chemical Storage: Yes
PAMs Used?: No NC Mine Permit ID: 61-06
Date of Inspection: Time of Inspection: 9• q 5 A^ i'^ 0 3 Inspector:
Total Event Precipitation (inches): Ls this a Representative Storm Event? E Yes F-1 No
/b7&'yc-S �''S� — o /
�
ed
O O
Structure
Outfall No.
Description�j
Industrial Activities
Color
Odor
v
p-
w p
Other Indicators
PM -001A
pipe
iroad,shi .pping, bulk loading
NO
/U4,ti
' /
PM -002A
pipe (skimmer)
bulk loading, wastewater
/a���1
Lyf/,t
�„
,tfv
NO
/u0
h; • f 154, k-'
PM -003
pipe
bulk loading
Np
ttio
tb
PM -005A
pipe
tailings dump area
PM -006A
pipe
mining, haul roads
PM -006E
pipe
mine waste dump, stockpile
Scale: 1 to 5 where 1 is clear/no solids and 5 is very cloudy/extremely/covered
Comments: 02- ��
Colors: red, brown, blue, etc. Tint: light, medium, dark
"strong,
G� k1 �/ �� % ��y, /+�r�•�r��
Odors: use words like weak, slightly, oil, chemical, etc.
By this signature, I certify that this report is accurate and complete
to the best of my knowledge.
�—
�O�er: fji�'^ �}fzD�2rD��%l�/� �� •�Z(ffYcly S�o�Ti/ht /�i���
��-�-- �-
611,�2,d1'T
Page _ of
Stormwater Semiannual Analytical 2015.xlsx
Chalk 2014
NPDES COC No.: NCG020257
(') Sampling upstream and downstream for all SDOs is done in Brushy Creek
TPH: no mobile fueling in the mine (1/1/14 to 06/30/14)
U)
o
a
c
Ecn
o
U
U)
�°
M
L
ai
C O
N
�`
Z
�
U)
U
L E W
moo
0�
U-
? ,
ow
Q 2 �
Weather Station:
N
N o
N
w a U)
Site Rain Gauge
<50.0
50
0.1
15.0
Event Precipitation
Flow Estimated at 20 min intervals
Total Event
Flow
Total
Date of
Time of Sample Point
Date of
Turbidity
TSS
SS
TPH
Rainfall Duration
Rate
Flow
Total Flow Flow
Sample
Sample (Outfall ID)
Analyst Analysis
(NTU)
(mg/1)
(ml/1)
(mg/1)
(inches) (Hrs)
(gpm)
(gph)
(gph * hrs) (MG)
6/29/15
10:00 CK 04C
C. Sparks 6/30/15
40
55
0.8
na
0.00 0
5
300
0 0.000
0
0 0.00
NPDES COC No.: NCG020257
(') Sampling upstream and downstream for all SDOs is done in Brushy Creek
TPH: no mobile fueling in the mine (1/1/14 to 06/30/14)
Stormwater Semiannual Analytical 2015.xlsx
Sullins 2014
NPDES Permit No.: NCG020256
(1) Upstream/Downstream sampling performed at the UT that discharges to Sullins Branch stream for SDO 001A and 003
(2) Upstream/Downstream sampling performed at Sullins Branch stream for SDO 002
TPH: for mobile fueling area & stationary fueling areas
V
N
_
O
H
Efn
E
U
CO
Cu
t
ami
-o a
� 0
Cu
v 0
0
� 0 2
Z
mCD o
r-
'-
0=..
L E
m0
U)
0 )
U
U-
LU
I_-
o�
Q °
Weather Station:
N
N o
N
w a.
Site Rain Gauge
<50.0
50
0.1
15.0
Event Pre ci itation
Flow Estimated at 20 min intervals
Total
Total
Event
Flow Flow Total
Date of Time of Sample Point
Date of
Turbidity
TSS
SS
TPH
Rainfall
Duration
Rate Flow (gph * Flow
Sample Sample (Outfall ID)
Analyst Analysis
(NTU)
(mg/1)
(ml/1)
(mg/1)
(inches)
(Hrs)
(gpm) (gph) hrs) (MG)
6/29/15 11:30 SW -01A
C. Sparks 6/30/15
24
13
0.1
na
0.00
0.00
15 900 0 0
0 0 0
6/29/15 11:45 SW -03
C. Sparks 6/30/15
240
145
0.1
na
0.00
0.00
15 900 0 0
SW -01A
0 0 0
SW -02
0 0 0
SW -03
0 0 j 0
NPDES Permit No.: NCG020256
(1) Upstream/Downstream sampling performed at the UT that discharges to Sullins Branch stream for SDO 001A and 003
(2) Upstream/Downstream sampling performed at Sullins Branch stream for SDO 002
TPH: for mobile fueling area & stationary fueling areas
Stormwater Semiannual Analytical 2015.xlsx
Pine 2014
NPDES Permit No.: NCG020274
(') Sampling upstream and downstream for SDOs 01, 02, 03 is done in the N. Toe River
(2� Sampling upstream and downstream for outfall 06E is done in Little Bear Creek
.Weather
Station:
' .Site
Rain Gauge
'Total
Total•w
Flow
Total
i.-•
-•
•-••
Date ofRainfall
Duration
Rate
(gph
Flow
• -
• -
• _
•
•6MLWA
cr"rs)•a
••
1 •
' 1
MITI11�
*Analysis
.
.11
• �
�m
1 � / 1
.1
.11
:11
1 11
• •
�•
/
._
•11
���
1' 1 1
�
111
1
111
•��
..
. :
1 1/
1
• .
•
•�a�ttiati"`tea
NK
�i
�__�
,
• _
• •
�F''p
,',nA.Y�rt
'"i
�X ,�, a •.ter' ate.. .y,s.rfl
uxiP':$'u�v''n4,`.�`a_zC.4'ry�+/i?".}i"+.�.';.
��"i^fi64`sc�r�a:«
�-
• 1
--__�_�®000
•
z
`w�� b� 1 d3.4 i
.�
Y ^a ..K ^�f ti.
�R�
t,y. � .t a..:£'Yw'4'�
ES Y Cir n+�ry.�".4
�„y
' �Y
ja.�i
�9"����r.
--
•
--'.�s%Re�}.:.�;w5a�%sa-.s�.,i
-� ��•a
1����
Y�i� i
���x�j:'�.Y.,«,T,
�4{, �i ` �r� „1''�� �
�i...«€� ,. �.:...°�'�1..c Si��A-.�+�K.siYd.,
� � �
1�
w.,4c �a;..,§.'4�«3a``uk..rw,.;,yi
yk ��b�F,�f�`���iY
NPDES Permit No.: NCG020274
(') Sampling upstream and downstream for SDOs 01, 02, 03 is done in the N. Toe River
(2� Sampling upstream and downstream for outfall 06E is done in Little Bear Creek