Loading...
HomeMy WebLinkAbout20140182 Ver 2_DCM e-mail response_20150528Herndon, Mason From: Lane, Stephen Sent: Thursday, May 28, 2015 11:33 AM To: Mathis, Stonewall D; Shaver, Brad E SAW (Brad.E.Shaver@usace.army.mil); Herndon, Mason Subject: RE: Onslow 26 handclearing needed at southern interior bent area � aCM will not require a permit modification for the additional 400 sq. ft. of handclearing on the Onslow 26 bridge replacement project as described in the attached email thread. Please let me know if I can be of any further assistance with this project. Thanks, Stephen From: Mathis, Stonewall D Sent: Tuesday, May 26, 2015 6:08 PM To: Shaver, Brad E SAW (Brad.E.Shaver@usace.army.mil); Herndon, Mason; Lane, Stephen Cc: Mathis, Stonewall D Subject: Onslow 26 handclearing needed at southern interior bent area Hey Mason, Brad, and Stephen, NCDOT needs approximately 400 square feet of handclearing at the east side of the southern interior bent at the Onslow 26 bridge replacement project. This is because vegetation is in direct conflict with the proposed bridge and is in very near proximity to the proposed bridge. We propose handclearing of this vegetation to extend to approximately 10 feet to the east of the eastern side of the bridge. The vegetation in this area is shrubby in nature as there are no what I would call mature trees in this area. Please see the attached package and picture (see vegetation around end of bent in far side of photo) in this regard. Please let me know whether you approve of this proposal. Please let me know whether you need additional information to make your decision. Thank you, Stoney �nr�i'. �;e t°r�,��ar,ci�r��;t� :a �r�ci 't°anr :4�,i;� ;��r�ci�r i;, ;,ubj��;: :a :4�,� �;.C`. ;�=ubii�; r�t�cat°c:7;� _�Ua �r�ci nr�, b� c:7�;��;�a;��G:7 :� :4�,it°c:7 ��r:i�s.