HomeMy WebLinkAboutNCG120051_2023 DMR_20240105 CERTIFICATION OF THE EVALUATION OF OUTFALLS FOR
NON-STORM WATER DISCHARGES
Republic Services, Inc. (dba Uwharrie)
500 landfill Road
Mt. Gilead,North Carolina 27306
I certify that I have evaluated the storm water discharge of the facility and determined there is no
presence of non-storm water discharges. The method used for evaluating the discharge was a visual
inspection of discharge patterns and inspection of drainage mans and schematics, and analytical testing.
The storm water discharge review was conducted on fZ-29-Z Y. The on-site drainage points observed
during the test included // 2/SS2 LV/ 71¢/7E IC
Sign re
OpS S1c,vJ ; So�
Title
Date
r
NCDENIR
Stormwater Discharge Outfall (SDO)
Qualitative Monitoring Report
For guidance mi/illiny out this pm,please visit: hntr//portal.nnienr.ori1wemr/ndes-storntw,iter/
Permit No.: N/C/g/i/./Q/Q/12/0/ or Certificate of Coverage No.: N/C/G/1/2/_/0 /5 /1 /
Facility Name: Uwharrie Environmental
County: Montgomery Phone No. (910)576-3697
Inspector: Oro.— ,rC414/3-
Date of Inspection: (2-2?-Z?
Time of Inspection: P rk
Total Event Precipitation(inches):
Was this a"Representative Storm event"or"Measureable Storm Event"as defined by the permit?
(See information below.) /V p O Kk ) , -p;�� Ve„0-5
❑ Yes ❑ No v p ld7G \
Please verify whether Qualitative Monitoring must be performed during a "representative storm
event"or"measureable storm event"(requirements vary,depending on the permit).
Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be
performed during a"representative storm event"or during a"measureahle storm event." However,
sonic permits do not have this requirement. Please refer to these definitions,if applicable.
A"representative storm event"is a storm event that measures greater than 0.1 inches of rainfall
and that is preceded by at least 72 hours (3 days)in which no storm event measuring greater than
0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no
precipitation.
A"measurable storm event"is a storm event that results in an actual discharge from the
permitted site outfall. The previous measurable storm event must have been at least 72 hours
prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter
interval is representative for local storm events during the sampling period,and the permittee
obtains approval from the local DWQ Regional Office.
By this signature,I certify that this report is accurate and complete to the best of my knowledge:
(Signature Permittee or Designee)
Page 1 ol2
SWU•242.I.ast modified 10/25/2012
1. Outfall Description:
Outfall No. / Structure(pipe,ditch,etc.) ��p
Receiving Stream: C<oc, e,f L -
Describe the industrial activities that occur within the outfall drainage area: LIP
2. Color: Describe the color of the discharge using basic colors (red,brown, blue,etc.) and tint
(light, medium,dark)as descriptors:
3. Odor: Describe any distinct odors that the discharge may have(i.e.,smells strongly of oil,
weak chlorine odor,etc.):
4. Clarity: Choose the number which best describes the clarity of the discharge,where 1 is
clear and 5 is very cloudy:
1 2 3 4 5
S. Floating Solids: Choose the number which best describes the amount of floating solids in
the stormwater discharge,where 1 is no solids and 5 is the surface covered with floating solids:
1 2 3 4 5
6. Suspended Solids: Choose the number which best describes the amount of suspended
solids in the stormwater discharge,where 1 is no solids and 5 is extremely muddy:
1 2 3 4 5
7. Is there any foam in the stormwater discharge? Yes No
8. Is there an oil sheen in the stormwater discharge? Yes No
9. Is there evidence of erosion or deposition at the outfall? Yes No
10. Other Obvious Indicators of Stormwater Pollution:
List and describe
Note: Low clarity,high solids,and/or the presence of foam,oil sheen,or erosion/ eposition
may be indicative of pollutant exposure. These conditions warrant further inves gation.
Page 2 of 2
SWU-242,Last modified 10/25/2012
NCDE II
Stormwater Discharge Outfall (SDO)
Qualitative Monitoring Report
For guidance an Piing out this form,pleuse visit: hllp:/Jportalncdenr.nri fweb/Ir/npmles-ctortnw;lt r/
Permit No.: N/C/G/i/.2/.Q/Q/0/0 / or Certificate of Coverage No.: N/C/G/1/2 /0/0 /5 /1 /
Facility Name: Uwharrie Environmental
County: Montgomery Phone No. (910)576-3697
Inspector: "c.+.- t n�'I✓
Date of Inspection: r Z-Z? 2.2
Time of Inspection: .7 . 'k
Total Event Precipitation(inches):
Was this a"Representative Storm went" or"Measureable Storm Event"as defined by the permit?
(See information below.) J u v -Pcn
❑ Yes ❑ No , VP bw-1- -Act, 1
Please veri%y whether Qualitative Monitoring must be performed during a "representative storm
event"or"measureuble storm event"(requirements vary,depending on the permit).
Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be
performed during a"representative storm event"or during a"measureahle storm event." However,
some permits do not have this requirement. Please refer to these definitions,if applicable.
A"representative storm event"is a storm event that measures greater than 0.1 inches of rainfall
and that is preceded by at least 72 hours(3 days)in which no storm event measuring greater than
0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no
precipitation.
A"measurable storm event"is a storm event that results in an actual discharge from the
permitted site outfall. The previous measurable storm event must have been at least 72 hours
prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter
interval is representative for local storm events during the sampling period,and the permittee
obtains approval from the local DWQ Regional Office.
By this signature,I certify that this report is accurate and complete to the best of my knowledge:
(Signature of Permittee or Designe
Page 1 of2
SWU•242.I.asumodiied 10/25/2012
1. Outfall Description:
Outfall No. Z Structure (pipe,ditch,etc.) e-
Receiving Stream: f a 012. C.i s e_ L
Describe the industrial activities that occur within the outfall drainage area: 1IF
2. Color: Describe the color of the discharge using basic colors (red,brown,blue,etc.) and tint
(light,medium,dark)as descriptors:
3. Odor: Describe any distinct odors that the discharge may have(i.e.,smells strongly of oil,
weak chlorine odor,etc.):
4. Clarity: Choose the number which best describes the clarity of the discharge,where 1 is
clear and 5 is very cloudy:
1 2 3 4 5
5. Floating Solids: Choose the number which best describes the amount of floating solids in
the stormwater discharge,where 1 is no solids and 5 is the surface covered with floating solids:
1 2 3 4 5
6. Suspended Solids: Choose the number which best describes the amount of suspended
solids in the stormwater discharge,where 1 is no solids and 5 is extremely muddy:
1 2 3 4 5
7. Is there any foam in the stormwater discharge? Yes No
8. Is there an oil sheen in the stormwater discharge? Yes No
9. Is there evidence of erosion or deposition at the outfall? Yes No
10. Other Obvious Indicators of Stormwater Pollution:
List and describe
Note: Low clarity,high solids,and/or the presence of foam, oil sheen, or erosion/deposition
may be indicative of pollutant exposure. These conditions warrant further investigation.
Page 2 of 2
SWU-242,Last modified 10/25/2012
NC ENR
Stormwater Discharge Outfall (SDO)
Qualitative Monitoring Report
l:urguklance on lilting out this farm,please visit: halt:/Jput'tal.ncdenr.ori lweb/Ir/npth"s-sturmwater/
Permit No.: N/L/G/J2/Q/1/1/5/ or Certificate of Coverage No.: N/JG/1/2/Q/0 /5 /1 /
Facility Name: Uwharrie Environmental
County: Montgomery Phone No. (910)576-3697
Inspector: IP a-- S 4A
Date of Inspection: ( Z-2-''23
Time of Inspection: 3 19 AN
Total Event Precipitation(inches):
Was this a "Representative Storm Event"or"Measureable Storm Event"as defined by the permit?
(See information below.) ✓0 p Q u I Eve v'*S
❑ Yes ❑ No A/D Uw+ -Pc, I I
Please verify whether Qualitative Monitoring must be performed during a "representative storm
event"or"measureable storm event"(requirements vary,depending on the permit).
Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be
performed during a"representative storm event"or during a"measureable storm event." However,
sonic permits do not have this requirement. Please refer to these definitions,if applicable.
A"representative storm event"is a storm event that measures greater than 0.1 inches of rainfall
and that is preceded by at least 72 hours(3 days)in which no storm event measuring greater than
0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no
precipitation.
A"measurable storm event"is a storm event that results in an actual discharge from the
permitted site outfall. The previous measurable storm event must have been at least 72 hours
prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter
interval is representative for local storm events during the sampling period,and the permittee
obtains approval from the local DWQ Regional Office.
By this signature, I certify that this report is accurate and complete to the best of my knowledge:
(Signature of Permittee or De gnee)
Page 1 of 2
SWU.242.I.ast muddied 10/25/2012
1. Outfall Description:
Outfall No. 5 ' ' Structure (pipe,ditch,etc.) fe-
Receiving Stream: kg)ei k C.-
Describe the industrial activities that occur within the outfall drainage area: `lf-
2. Color: Describe the color of the discharge using basic colors (red,brown,blue,etc.) and tint
(light,medium,dark)as descriptors:
3. Odor: Describe any distinct odors that the discharge may have(i.e.,smells strongly of oil,
weak chlorine odor,etc.):
4. Clarity: Choose the number which best describes the clarity of the discharge,where 1 is
clear and 5 is very cloudy:
1 2 3 4 5
5. Floating Solids: Choose the number which best describes the amount of floating solids in
the stormwater discharge,where 1 is no solids and 5 is the surface covered with floating'solids:
1 2 3 4 5
6. Suspended Solids: Choose the number which best describes the amount of suspended
solids in the stormwater discharge,where 1 is no solids and 5 is extremely muddy:
1 2 3 4 5
7. Is there any foam in the stormwater discharge? Yes No
8. Is there an oil sheen in the stormwater discharge? Yes No
9. Is there evidence of erosion or deposition at the outfall? Yes No
10. Other Obvious Indicators of Stormwater Pollution:
List and describe
Note: Low clarity,high solids,and/or the presence of foam,oil sheen,or erosion/deposition
may be indicative of pollutant exposure. These conditions warrant further invest'gation.
Page 2 of 2
SWU-242,Last modified 10/25/2012
jitirA
NP
NC®ENI
Stormwater Discharge Outfall (SDO)
Qualitative Monitoring Report
For guidance on filling out this Pm,please visit: httl //portal.uctIvi •.orthveh/ mules-storittwatm/
Permit No.: N/c/G/1/2/Q/Q/0/0 / or Certificate of Coverage No.: N/C/G/1/2/0/Q/5 /1 /
Facility Name: Uwharrie Environmental
County: Montgomery Phone No. (910)576-3697
inspector:
Date of Inspection: )2• 2-4-
Time of Inspection: • ' Ptl'►t
Total Event Precipitation (inches):
Was this a "Representative Storm Event"or"Measureahle Storm Event"as defined by the permit?
(See information below.) /00 (4 nr
❑ Yes ❑ No /t//b -Pca, I I
Please verify whether Qualitative Monitoring must be performed during a "representative storm
event"or"measureable storm event"(requirements vary,depending on the permit).
Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be
performed during a"representative storm event"or during a"measureable storm event." However,
sonic permits do not have this requirement. Please refer to these definitions,if applicable.
A"representative storm event"is a storm event that measures greater than 0.1 inches of rainfall
and that is preceded by at least 72 hours(3 days)in which no storm event measuring greater than
0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no
precipitation.
A"measurable storm event"is a storm event that results in an actual discharge from the
permitted site outfall. The previous measurable storm event must have been at least 72 hours
prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter
interval is representative for local storm events during the sampling period,and the permittee
obtains approval from the local DWQ Regional Office.
By this signature, I certify that this report is accurate and complete to the best of my knowledge:
(Signature of Permitt or Designee)
II' 1of2
SWU•242.List nudified 10/Z5/2012
1. Outfall Desc iption:
Outfall No. b Structure (pipe,ditch,etc.) p Q Q..
Receiving Stream: let,ocx,
Describe the industrial activities that occur within the outfall drainage area: JF
2. Color: Describe the color of the discharge using basic colors (red, brown,blue,etc.) and tint
(light,medium,dark)as descriptors:
3. Odor: Describe any distinct odors that the discharge may have(i.e.,smells strongly of oil,
weak chlorine odor,etc.):
4. Clarity: Choose the number which best describes the clarity of the discharge,where 1 is
clear and 5 is very cloudy:
1 2 3 4 5
5. Floating Solids: Choose the number which best describes the amount of floating solids in
the stormwater discharge,where 1 is no solids and 5 is the surface covered with floating solids:
1 2 3 4 5
6. Suspended Solids: Choose the number which best describes the amount of suspended
solids in the stormwater discharge,where 1 is no solids and 5 is extremely muddy:
1 2 3 4 5
7. Is there any foam in the stormwater discharge? Yes No
8. Is there an oil sheen in the stormwater discharge? Yes No
9. Is there evidence of erosion or deposition at the outfall? Yes No
10. Other Obvious Indicators of Stormwater Pollution:
List and describe
Note: Low clarity,high solids,and/or the presence of foam,oil sheen,or erosion/deposition
may be indicative of pollutant exposure. These conditions warrant further investigation.
Page 2 of 2
SWU-242,Last modified 10/25/2012
vzsx...A
NCDENR
Stormwater Discharge Outfall (SDO)
Qualitative Monitoring Report
For guidance on filling out this from,please visit: hltpJ1purtalnrdenr.url JWeh/lr•/npdes-stornIWJU'r/
Permit No.: N/C/G/1/2-/Q/Q/0/0/ or Certificate of Coverage No.: N/Ch/1/2/Q/Q/i/1/
Facility Name: Uwharrie Environmental
County: Montgomery Phone No. (910)576-3697
Inspector: i S (.42 '°r":
Date of Inspection: 1Z'Z-�`Z'?
Time of Inspection: 3 ��
Total Event Precipitation(inches):
Was this a"Representative Storm Event"or"Measureable�+ Storm Event"as defined by the permit?
(See information below.) /)a 1.0Ax,f'K R s_ga+^�
❑ Yes ❑ No
No v w't-
Please veri%y whether Qualitative Monitoring must be performed during a "representative storm
event"or"seasureable storm event"(requirements vary,depending on the permit).
Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be
performed during a"representative storm event"or during a"measureable storm event." However,
some permits do not have this requirement. Please refer to these definitions,if applicable.
A"representative storm event"is a storm event that measures greater than 0.1 inches of rainfall
and that is preceded by at least 72 hours(3 days)in which no storm event measuring greater than
0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no
precipitation.
A"measurable storm event"is a storm event that results in an actual discharge from the
permitted site outfall. The previous measurable storm event must have been at least 72 hours
prior. The 72-hour storm interval does not apply lithe permittee is able to document that a shorter
interval is representative for local storm events(luring the sampling period,and the permittee
obtains approval from the local DWQ Regional Office.
By this signature,I certify that this report is accurate and complete to the best of my knowledge:
(Signature of Permit a or Designee)
Page 1 of 2
SWU•242.I.astmuddied 10/25/2012
1. Outfall Description:
Outfall No. 7 P Structure (pipe,ditch,etc.) P+�e
Receiving Stream: g eG t s.eiL
Describe the industrial activities that&cur within the outfall drainage area: Li
2. Color: Describe the color of the discharge using basic colors(red,brown,blue,etc.)and tint
(light,medium,dark)as descriptors:
3. Odor: Describe any distinct odors that the discharge may have(i.e.,smells strongly of oil,
weak chlorine odor,etc.):
4. Clarity: Choose the number which best describes the clarity of the discharge,where 1 is
clear and 5 is very cloudy:
1 2 3 4 5
S. Floating Solids: Choose the number which best describes the amount of floating solids in
the stormwater discharge,where 1 is no solids and 5 is the surface covered with floating solids:
1 2 3 4 5
6. Suspended Solids: Choose the number which best describes the amount of suspended
solids in the stormwater discharge,where 1 is no solids and 5 is extremely muddy:
1 2 3 4 5
7. Is there any foam in the stormwater discharge? Yes No
8. Is there an oil sheen in the stormwater discharge? Yes No
9. Is there evidence of erosion or deposition at the outfall? Yes No
10. Other Obvious Indicators of Stormwater Pollution:
List and describe
Note: Low clarity,high solids,and/or the presence of foam,oil sheen,or erosion/ eposition
may be indicative of pollutant exposure. These conditions warrant further inves gation.
Page 2 of 2
SWU-242,Last modified 10/25/2012
vz7A
NCDENR
Stormwater Discharge Outfall (SDO)
Qualitative Monitoring Report
!'vrguidance on filling out this Pro!,please visit: littp:/)portal.ordear.ori/web/Ir/II (l(%-stonnwater/
Permit No.: N/C/G/J2/Q/Q/O/0/ or Certificate of Coverage No.: N/cJa/il2/Q/Q/5 /1 /
Facility Name: Uwharrie Environmental
County: Montgomery Phone No. (910)576-3697
Inspector: Vr -St.64.+-
Date of Inspection: l L-L7-Z7
Time of Inspection: 3
Total Event Precipitation (inches):
Was this a"Representative Storm P. ent"or"Measureable Storm Irvent"as defined by the permit?
(See information below.) ,ID IJ `' �
D dw �
/v 1 �\
f
❑ Yes ❑ No
Please verify whether Qualitative Monitoring must be performed during a "representative storm
event"or"measureable storm event"(requirements vary,depending on the permit).
Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be
performed during a"representative storm event"or during a"measureable storm event." However,
some permits do not have this requirement. Please refer to these definitions,if applicable.
A"representative storm event"is a storm event that measures greater than 0.1 inches of rainfall
and that is preceded by at least 72 hours(3 days)in which no storm event measuring greater than
0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no
precipitation.
A"measurable storm event"is a storm event that results in an actual discharge from the
permitted site outfall. The previous measurable storm event must have been at least 72 hours
prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter
interval is representative for local storm events during the sampling period,and the permittee
obtains approval from the local DWQ Regional Office.
By this signature,I certify that this report is accurate and complete to the best of my knowledge:
45-
(Signature of ermittee or Designee)
Page 1 of 2
SW11.2,12.Last modified 10/25/2012
1. Outfall Description:
Outfall No. 7� Structure (pipe,ditch,etc.) �� e_
Receiving Stream: g (3000 C 4.4to 1/—
Describe the industrial activities that occur within the outfall drainage area: /
2. Color: Describe the color of the discharge using basic colors (red,brown, blue,etc.) and tint
(light,medium,dark) as descriptors:
3. Odor: Describe any distinct odors that the discharge may have(i.e.,smells strongly of oil,
weak chlorine odor,etc.):
4. Clarity: Choose the number which best describes the clarity of the discharge,where 1 is
clear and 5 is very cloudy:
1 2 3 4 5
S. Floating Solids: Choose the number which best describes the amount of floating solids in
the stormwater discharge,where 1 is no solids and 5 is the surface covered with floating solids:
1 2 3 4 5
6. Suspended Solids: Choose the number which best describes the amount of suspended
solids in the stormwater discharge,where 1 is no solids and 5 is extremely muddy:
1 2 3 4 5
7. Is there any foam in the stormwater discharge? Yes No
8. Is there an oil sheen in the stormwater discharge? Yes No
9. Is there evidence of erosion or deposition at the outfall? Yes No
10. Other Obvious Indicators of Stormwater Pollution:
List and describe
Note: Low clarity,high solids,and/or the presence of foam,oil sheen,or erosion/deposition
may be indicative of pollutant exposure. These conditions warrant further investigation.
Page 2 of 2
SWU-242,Last modified 10/25/2012
AvrA
NCDENR
Stormwater Discharge Outfall (SDO)
Qualitative Monitoring Report
For guidance on filling out this furor,please visit: law/i n,rtalo dear.orewelVIrintules-stornnvaU.r/
Permit No.: N/C/G/J2/Q/1/9J0/ or Certificate of Coverage No.: N/C5/1/2 /0/0 J5 /1 /
Facility Name: Uwharrie Environmental
County: Montgomery Phone No. O910)576-3697
Inspector: Tr c tom'
Date of Inspection: /Z-2-4'Z3
Time of Inspection: .3 P K�
Total Event Precipitation(inches):
Was this a"Representative Storm Event"or"Measureable Storm Event" .is defined by the permit?
(See information below.) AL Q gyp,
❑ Yes ❑ No A
Please verily whether Qualitative Monitoring must be performed during a "representative storm
event"or"measureable storm event"(requirements vary,depending on the permit).
Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be
performed during a"representative storm event"or during a"measureable storm event." However,
sonic permits do not have this requirement. Please refer to these definitions,if applicable.
A"representative storm event"is a storm event that measures greater than 0.1 inches of rainfall
and that is preceded by at least 72 hours(3 days)in which no storm event measuring greater than
0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no
precipitation.
A"measurable storm event"is a storm event that results in an actual discharge from the
permitted site outfall. The previous measurable storm event must have been at least 72 hours
prior. The 72-hour storm interval does not apply lithe.permittee is able to document that a shorter
interval is representative for local storm events during the sampling period,and the permittee
obtains approval from the local DWQ Regional Office.
By this signature,I certify that this report is accurate and complete to the best of my knowledge:
(Signature of Pe ittee or Designee)
Page 1 of 2
SWU•242,Last modified 10/25/2012
1. Outfall Description:
Outfall No. 7G Structure (pipe,ditch,etc.) eq,c.
Receiving Stream: 12oC� C•►^a-�4.-
Describe the industrial activities that occur within the outfall drainage area: ` F-
2. Color: Describe the color of the discharge using basic colors (red,brown,blue,etc.)and tint
(light,medium,dark)as descriptors:
3. Odor: Describe any distinct odors that the discharge may have(i.e.,smells strongly of oil,
weak chlorine odor,etc.):
4. Clarity: Choose the number which best describes the clarity of the discharge,where 1 is
clear and S is very cloudy:
1 2 3 4 5
5. Floating Solids: Choose the number which best describes the amount of floating solids in
the stormwater discharge,where 1 is no solids and 5 is the surface covered with floating solids:
1 2 3 4 5
6. Suspended Solids: Choose the number which best describes the amount of suspended
solids in the stormwater discharge,where 1 is no solids and 5 is extremely muddy:
1 2 3 4 5
7. Is there any foam in the stormwater discharge? Yes No
8. Is there an oil sheen in the stormwater discharge? Yes No
9. Is there evidence of erosion or deposition at the outfall? Yes No
10. Other Obvious Indicators of Stormwater Pollution:
List and describe
Note: Low clarity,high solids,and/or the presence of foam,oil sheen,or erosion/deposition
may be indicative of pollutant exposure. These conditions warrant further investigation.
Page 2 of 2
SWU-242,Last modified 10/25/2012