HomeMy WebLinkAboutNC0027197_Authorization to Construct_20041109Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
November 9, 2004 .
Jay C. Stowe, P.E., Utilities Director
City of Shelby
Post Office Box 207
Shelby, North Carolina 28151
SUBJECT:
Dear Mr. Stowe:
Authorization to Construct
A to C No. 027197A01
City of Shelby
Shelby Water Treatment Plant
Alan W. Klimek, P.E. Director
Division of Water Quality
wOV 1 0 2004
.. .. - -� �-- • IVY L � % � j
A fast track application for Authorization to Construct dechlorination facilities was
received on November 8, 2004, b� the Division. Authorization is hereby granted for the
construction of modifications to the existing Shelby Water Treatment Plant, with discharge of
filter backwash water into an unnamed tributary of the First Broad River in the Broad River
Basin.
This authorization results in no increase in design or permitted capacity and is awarded
for the construction of the following specific modifications:
Sodium thiosulfate storage and chemical feed system, with schedule 80 PVC
chemical feed piping to provide dechlorination, pursuant to the fast track
application received on November 8, 2004, and in conformity with the Minimum
Design Criteria for Dechlorination Facilities.
This Authorization to Construct is issued in accordance with Part I11, Paragraph A of
NPDES Permit No. NCO027197 issued September 29, 2003, and shall be subject to revocation
unless the wastewater treatment facilities are constructed in accordance with the conditions and
limitations specified in Permit No. NC0027197.
In the event that the facilities fail to perform satisfactorily, including the creation of
nuisance conditions, the Permittee shall take immediate corrective action, including those as may
be required by this Division, such as the construction of additional or replacement wastewater
treatment or disposal facilities.
The Mooresville Regional Office, telephone number (704) 663-1699, shall be notified at
least forty-eight (48) hours in advance of operation of the installed facilities so that an on site
inspection can be made. Such notification to the regional supervisor shall be made during the
normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State
None
rthCarolina
Naturallif
Holidays.
North Carolina Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 Phone (919) 733-7015 Customer Service
Internet: h2o.enr.state.nc.us 512 N. Salisbury St. Raleigh, NC 27604 FAX (919) 733-2496 I-877-623-6748
An Equal Opportunity/Affirmative Action Employer — 50% Recycled/10% Post Consumer Paper
Jay C. Stowe, P.E., Utilities Director
November 9, 2004
Page 2
Pursuant to 15A NCAC 2H .0140, upon completion of construction and prior to operation of
these permitted facilities, the completed Engineering Certification form attached to this permit shall be
submitted to the address provided on the form.
Upon classification of the facility by the Certification Commission, the Permittee shall
employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the
wastewater treatment facilities. The operator must hold a certificate of the type and grade at least
equivalent to or greater than the classification assigned to the wastewater treatment facilities by
the Certification Commission.
The Permittee must also employ a certified back-up operator of the appropriate type and
grade to comply with the conditions of T15A:8G.0202. The ORC of the facility must visit each
Class I facility at least weekly and each Class 11, III and IV facility at least daily, excluding
weekends and holidays, must properly manage the facility, must document daily operation and
maintenance of the facility, and must comply with all other conditions of T15A:8G.0202.
A copy of the approved plans and specifications shall be maintained on file by the
Permittee for the life of the facility.
During the construction of the proposed additions/modifications, the permittee shall
continue to properly maintain and operate the existing wastewater treatment facilities at all times,
and in such a manner, as necessary to comply with the effluent limits specified in the NPDES
Permit.
You are reminded that it is mandatory for the project to be constructed in accordance
with the North Carolina Sedimentation Pollution Control Act, and, when applicable, the North
Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractor's
responsibilities shall be in complying with these Acts.
Failure to abide by the requirements contained in this Authorization to Construct may
subject the Permittee to an enforcement action by the Division of Water Quality in accordance
with North Carolina General Statute 143-215.6A to 143-215.6C.
The issuance of this Authorization to Construct does not preclude the Permittee from
complying with any and all statutes, rules, regulations, or ordinances which may be imposed by
other government agencies (local, state, and federal) which have jurisdiction.
r
Jay C. Stowe, P.E., Utilities Director
November 9, 2004
Page 3
If you have any questions or need additional information, please do not hesitate to contact
Cecil G. Madden, Jr., P.E. at telephone number (919) 715-6203.
Sincerely,
Alan W. Klimek, P.E.
MH/cgm
cc: Willis Engineers, Charles A. Willis, P.E.
Cleveland County Health Department
Technical Assistance and Certification Unit
Daniel Blaisdell, P.E.
Dave Goodrich, NPDES Permitting Unit
Cecil G. Madden, Jr., P.E.
Mark Hubbard, E.I.
A to C File
-city of Shelby
A to C No. 027197AOI
Issued November 9, 2004
Engineer's Certification
I, , as a duly registered Professional Engineer in
the State of North Carolina, having been authorized to observe (periodically/weekly/full time)
the construction of the modifications and improvements to the Shelby Water Treatment Plant,
located on W Grover Street in Cleveland County for the City of Shelby, hereby state that, to the
best of my abilities, due care and diligence was used in the observation of the following
construction:
Sodium thiosulfate storage and chemical feed system, with schedule 80 PVC
chemical feed piping to provide dechlorination, pursuant to the fast track
application received on November 8, 2004, and in conformity with the Minimum
Design Criteria for Dechlorination Facilities.
I certify that the construction of the above referenced project was observed to be built
within substantial compliance and intent of the approved plans and specifications.
Signature
Date
Registration No.
Send to: Construction Grants & Loans
DENR/DWQ
1633 Mail Service Center
Raleigh, NC 27699-1633