HomeMy WebLinkAboutSW6170202_As-Built - Certification_20240109 State Stormwater Permit
Permit No. SW6170202
H & M Bedford, LLC
Bedford Commercial Development in
Hoke County
Designer's Certification
1, James M. Kizer,Jr., PE , as a duly registered Professional Engineer in the
State of North Carolina, having been authorized to observe (periodically/ weekly/
full time) the construction of the project,
Bedford Commercial Development
(Project Name)
for fJ&M Bedford. LLC. (Project Owner) hereby state that, to the
best of my abilities, due care and diligence was used in the observation of the project
construction such that the construction was observed to be built within substantial
compliance and intent of the approved plans and specifications.
Noted deviations from approved plans and specification:
See attached for Pond 3
`` �� trrrrrr
C
Signaturep �F .�s:o,`z
.Q SEA
Registration Number NC PE 20680
20680
Date /Alt/ •
%yy'• 'tiU1NF��:•'
���tJt7f11tti�,1
cc: NCDEQ-DEMLR Regional Office
Page 1 of 1
ENGINEERS •
PLANNERS k
SURVEYORS
MOORNIAN,KIZER&REITZEL,INC.
115 Broadfoot Ave.
P.O.Box 53774
Fayetteville.NC 28305
(910)484-5191
Fax:(910)484-0388
Stormwater Permit No. SW6170202 www.mkrinc.com
Bedford Commercial, Hoke County
Commercial East, Stormwater Pond 3
Design Deviation Attachment
The Stormwater Submittal for the Bedford Commercial project in Hoke County was made prior
to any development plans for the commercial subdivision lots being in place. The submittal was
made for the speculative development of the 9 commercial lots proposed, with restrictions being
placed on the lots to cap the amount of impervious area allowed. While the Commercial West
Pond 1 and Commercial East Pond 2 were constructed per the submitted designs, it was
necessary to adjust Stormwater Pond 3 at Bedford Commercial East to match better with the
associated development of the adjoining commercial lots that contributed to that pond. The
grading for Commercial East Lots 6 and 7 was raised during construction to better suit the
proposed development taking place on the lots, and the Stormwater Pond 3 grading was modified
accordingly. The Stormwater Pond 3 elevations were adjusted up approximately 5 feet to blend
better with the new site grading. The adjusted site grading resulted in the final pond surface area
being increased to 16,472 SF at elevation 233.76, compared to the originally proposed 11,934 SF
at elevation 229.00. The increase in pond surface area required minor adjustments to the
drawdown holes to ensure compliance with pre and post flow requirements for the one year
storm event and overall drawdown time. The forebay location was also adjusted to
accommodate the final alignment of the storm drainage line into the pond. The attached record
documents for Stormwater Pond 3 reflect the adjusted pond design and final construction.