Loading...
HomeMy WebLinkAbout20211489ver3_MRT-DMSROY COOPER Governor ELIZABETH S. BISER Secretary RICHARD E. ROGERS, JR. Director NORTH CAROLINA Environmental Quality COMPENSATORY MITIGATION RESPONSIBILITY ACCEPTANCE FORM December 5, 2023 Permittee: Welcome Venture Park, LLC DWR Project #20211489 ver 3 Project Name: Northern Durham Parkway Phase 2 County: Durham The Division has received a Statement of Availability (SOA) from NC Division of Mitigation Services to partially satisfy the mitigation requirements set forth in the Buffer Authorization issued to Welcome Venture Park, LLC dated December 5, 2023 as provided in the table below. Compensatory Mitigation River Basin and HUC Number Neuse Buffer 13,344 sq ft (credits) Neuse Basin Falls Lake Watershed 03020201 HUC The Permittee must provide a copy of this form to the Mitigation Provider specified above who will then sign the form to verify receipt of payment and the transfer of the mitigation responsibility. Once the Mitigation Provider has signed this form, it is the Permittee's responsibility to ensure that a signed copy of this form is submitted to the Division before conducting any of the authorized impacts. The Mitigation Provider verifies that the mitigation requirements (credits) shown above, have been released and are available. By signing below, the Mitigation Provider is accepting full responsibility for the identified mitigation. As a reminder to the Mitigation Provider, no more than 25 percent of the total mitigation required by Division can be met through preservation, unless requested and approved by the Division Director (15A NCAC 02H. 0506(c)(7)). Mitigation Bank Name: NC Division of Mitigation Services Signature Authority Name (print): Kelly Williams for NCDMS Signature &2b�� la Date: 14 December 2023 ��� North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 1 1611 Mail Service Center I Raleigh, North Carolina 27699-1611 NoameMofouNa . 919.707.9000 aepartmeM M Envlrpnmental pual�