Loading...
HomeMy WebLinkAboutNCC216881_NOT Closeout Documents_20240104 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 610 East Center Avenue, Suite 301, Mooresville, NC 28115 (704)663-1699 County: Mecklenburg Project: Grier/Hidden Valley/Newell Relief Elem Sch River basin: Catawba Person financially responsible:Charlotte Mecklenburg Board of Education-Gary S Adams, Project#: MECKL-2022-021 Director of Architecture Address: 3301 Stafford Drive,PO Box 30035,Charlotte,NC 28208 1. Project Location: The Plaza,Charlotte Pictures: No 2. Weather and soil conditions: Rainy,Wet Workable Soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): David Kelly Title: Superintendent Inspection report: Sent Report Date given/sent: November 22,2023 9. Corrective action needed: 10. Comments: Overall the site has sufficient permanent ground cover to restrain erosion,however there are some bare areas that need to be stabilized. No additional self-monitoring or self-inspections are required.Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCGOI)must be requested by the permittee via a Notice of Termination(NOT)unless permit approval date was prior to April 2019. The NOT is available at:https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Jeffrey Chandler Others present: Date of inspection: November 21,2023 Time arriving on site: 10:20 AM Time leaving site: 10:30 AM CC: Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 610 East Center Avenue, Suite 301, Mooresville,NC 28115 (704)663-1699 County: Mecklenburg Project: CMS-New ES Hidden Valley-JW Grier-Newell(17) River basin: Yadkin-PeeDee Person financially responsible:Charlotte Mecklenburg Board of Education-Gary S Adams, Project#: MECKL-2022-015 Director of Architecture F Address: 3301 Stafford Drive,PO Box 30035,Charlotte,NC 28208 1. Project Location: The Plaza,Charlotte Pictures: No 2. Weather and soil conditions: Rainy,Wet Workable Soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): David Kelly Title: Superintendent Inspection report: Sent Report Date given/sent: November 22,2023 9: Corrective action needed: 10. Comments: Overall the site has sufficient permanent ground cover to restrain erosion,however there are some bare area that need to be stabilized. No additional self-monitoring or self-inspections are required.Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT)unless permit approval date was prior to April 2019. The NOT is available at:https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Jeffrey Chandler Others present: Date of inspection: November 21,2023 Time arriving on site: 10:00 AM Time leaving site: 10:20 AM cc: