Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NCC205148_NOT Closeout Documents_20240104
Charlotte-Mecklenburg ,STORM 2145 Suttle Avenue WATER EC Inspection Report Charlotte, NC 2 8 2 0 8 Services-r Project Name: Mercedes Benz Expansion Location: Mercedes Benz Expansion-Pineville Owner: SB Real Estate Investors, LLC 950 N. Polk St, Pineville, NC Pineville EC- Final Inspection#: 70359 - Date/Time: 6/6/22 12:00 pm- Inspector: Hudson, Eugene Weather conditions: Sunny Soil conditions: Workable Contact made: N/A Erosion and sediment control measures removed: YES Site permanently stabilized: YES BMP's installed per approved plans: YES Summary: Final Inspection: Mercedes Benz-408248 and 419530 All erosion controls measure removed and the site is stabilized. No issues found. • To report pollution or drainage problems call: 311 °° http ://stormwater. charmeck. org 011111_0TTG.. ` ° 11/23/2022 1:40:54PM Page 1 of 1