HomeMy WebLinkAboutNC0025984_PAR Review Form 2022_20230828Regional Pretreatment Annual Report Review
NC0025984_PAR Review Form 2022 (AutoRecovered)16
Regional Pretreatment Annual Report (PAR) Review
Is the PAR on time? Does it have two copies?
Did they send any other submissions with it?
Included? ADEQUATE? POTW noted Corrections? Regional Office: ARO
Narrative YES NO NA YES NO NA POTW: Forest City WWTP
PPS Form YES NO YES NO NPDES Permit No. NC0025984
SNCR YES NO YES NO Report Period: 01/2022 to 12/2022
IDSF YES NO YES NO
Full Modified
For modified programs evaluate shaded
items only. A Narrative is required for a
modified program only if there are SIUs
in SNC.
Allocation Table YES NO YES NO
Compliance Schedules YES NO NA YES NO NA
Public Notice YES NO NA YES NO NA
Program Information YES NO YES NO YES NO
Historical SNC YES NO NA YES NO NA YES NO NA
If No, check recommendation below:
1. Have at least 90% of SIU permits been issued within 180
days of expiration? (See Allocation Table).
Yes No Not req’d NOD NOV QNCR NCP Civil Penalty
Assessment
2. Were at least 80% of SIUs inspected? (See PPS Form) Yes No Not req’d NOD NOV QNCR NCP Civil Penalty
Assessment
3. Has effective enforcement been taken against industries in
SNC, including those causing pass-through or interference? (See
Narrative and SNCR Form)
Yes No NA NOD NOV QNCR NCP Civil Penalty
Assessment
4. Does public notice cover all SIUs in SNC? Yes No NA NOD NOV QNCR NCP Civil Penalty
Assessment
Note: Exceptions should be explained in the comment section below:
Befesa Zinc and the Town of Forest City entered into a Consent Order for BOD, TSS,
ammonia, and in the future Zinc on May 27, 2023. This review is for the 2022 period,
but noting this since the PAR review was not conducted until August 2023.
Reviewed By: Lauren Armeni Date: August 28, 2023