Loading...
HomeMy WebLinkAboutNC0025381_Semi-annual Progress Report 2023_20231127From:Dean Lindsey To:Armeni, Lauren E Subject:[External] NC002531- Semi Annual Progress Report Date:Monday, November 27, 2023 9:56:21 AM Attachments:image001.gif CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Hi Lauren, For our semiannual progress report for Lake Lure WWTP, There have been no changes to the current configuration of the WWTP. For operational parameters we have been producing satisfactory samples with the exception of NH3 which is covered by our current SOC. For our sludge and grit management, the basin is slowly being filled and is at a manageable level. We are consistently monitoring the basin for adequate treatment area and will schedule a sludge dewatering and removal when appropriate. Thanks, Dean Dean Lindsey Public Works Director 197 Buffalo Shoals Road Lake Lure, NC 28746 Cell: 828-772-6134 Office: 828.625.9983, Ext. 504 Web: townoflakelure.com dlindsey@townoflakelure.com Facebook:www.facebook.com/townoflakelure Email signature