HomeMy WebLinkAbout20221128 Ver 1_USACE Permit (2nd Time Out)_20231206Baker, Caroline D
From: Tillery, Julia A CIV USARMY CESAW (USA) <Julia.A.Tillery@usace.army.mil>
Sent: Wednesday, December 6, 2023 1:09 PM
To: Ted Kakambouras
Cc: Beasley, Troy; Trone, Rick; Bowers, Todd; Thomas, Zachary T; rwarren@rw2devco.com;
Ryan Breaux; Bailey, David E CIV USARMY CESAW (USA)
Subject: [External] SAW-2021-02316 - 2nd time out - Signed Permit
Attachments: SAW-2021-02316_2nd-Time-out_Signed-Permit_12.6.23.pdf
Importance: High
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Mr. Kakambouras,
Please see the attached standard permit, including appeals form, special conditions, and project plans for the SAW-
2021-02316 Welcome Venture Park Phase 2 project.
Please let me know if you have any questions.
Thank you,
Julia
Julia Tillery
Regulatory Specialist, Raleigh Regulatory Field Office
US Army Corps of Engineers
CE-SAW-RG-R
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Mobile: 919.440.1951
Email: Julia.A.Tillerv(@usace.armv.mil
From: Ted Kakambouras <tkakambouras@welcomegroup.com>
Sent: Thursday, November 30, 2023 3:28 PM
To: Tillery, Julia A CIV USARMY CESAW (USA) <Julia.A.Tillery@usace.army.mil>
Cc: Beasley, Troy <TBeasIey@withersrave nel.com>; Trone, Rick <rtrone@withersravenel.com>; Bowers, Todd
<bowers.todd@epa.gov>; Thomas, Zachary T <zachary.thomas@deq.nc.gov>; rwarren@rw2devco.com; Ryan Breaux
<rbreaux@welcomegroup.com>
Subject: [Non-DoD Source] RE: Initial Proffered Permit: Welcome Venture Park Phase 2, Durham / SAW-2021-02316
Julia,
Please see the attached, that has been executed by me.
As note, the $100 fee is in process. Likely to be paid on Monday (our accounting team is at an offsite today and
tomorrow).
Thank you and please let me know if you have any questions.
Ted Kakambouras
Acquisitions Director of Southeast Region
tkakambouras@welcomegroup.com
WWelcome
Group
5858 Westheimer, Suite 800
Houston, TX 77057
M: 832.343.5175
O: 713.243.6832
welcomegroup.com
From: Tillery, Julia A CIV USARMY CESAW (USA)<Julia.A.Tillerv@usace.army.mil>
Sent: Thursday, November 30, 2023 11:16 AM
To: Ted Kakambouras <tkakambouras@welcomegroup.com>
Cc: Beasley, Troy <TBeasIey@withersrave nel.com>; Trone, Rick <rtrone@withersravenel.com>; Bowers, Todd
<bowers.todd@epa.gov>; Thomas, Zachary T <zachary.thomas@deg.nc.gov>
Subject: Initial Proffered Permit: Welcome Venture Park Phase 2, Durham / SAW-2021-02316
Importance: High
Mr. Kakambouras,
The initial proffered permit (i.e., first time out letter and attachments) for this project, is attached to this email. Please
read it all carefully, and, if all looks ok, sign and date above the "(Permittee)" line on p. 7 of the pdf package and send
back (via email is preferred; reply all) as directed. Also note the required payment and associated instructions on p. 1 of
the pdf package. Please let me know if you have any questions.
Sincerely,
Julia
Julia Tillery
Regulatory Specialist, Raleigh Regulatory Field Office
US Army Corps of Engineers
CE-SAW-RG-R
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Mobile: 919.440.1951
Email: Julia.A.Tillerv@usace.army.mil