Loading...
HomeMy WebLinkAboutNCC216695_Annual Fee Waived Email_20240108Tran, Kieu M From: lase rfiche.ncdenr.gov@mccicloud.io Sent: Monday, January 8, 2024 2:26 PM To: larry.hopkins@pemc.coop Cc: Tran, Kieu M; Georgoulias, Bethany; larry.hopkins@pemc.coop Subject: [External] Construction SW General Permit Annual Fee Update - NCC216695 CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Dear Construction General Permit Permittee: This email is to notify you that the 2023 annual fee for Certificate of Coverage (COC) no. NCC216695 has been applied or waived. No future fees will be required, as this permit is no longer active. This COC is for Cherry Grove to Plantation Pipeline Transmission Line in Caswell County, issued to Piedmont Electric Membership Corporation. This communication is in reference to Invoice no. NCC216695-2023. If you have any questions, please contact the Stormwater Program at (919) 707-3649, or visit https://deg.nc.gov/NCG01. Be sure to add laserfiche.ncdenr.gov@mccicloud.io to your contacts to avoid future e-mails from going into Spam filters. The NC DEMLR Stormwater Program 512 N. Salisbury Street, Archdale Building 6th Floor, 1612 Mail Service Center, Raleigh, NC 27699-1612 This email was automatically generated by Laserfiche. Please do not respond to this email address, as responses are not monitored.