HomeMy WebLinkAbout20201288 Ver 2_More Info Received_20240108January 8, 2024 NC Division of Water Resources 401 and Buffer Permitting Unit Attn: Sue Homewood 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Re: North Creek Village Phase II - +/- 84.716 acres 17705 Davidson -Concord Rd Huntersville, NC 28078 Nationwide Permit 29, 39, and 58 Application Action ID: SAW-2008-02707 / DWR Project #: 2020-1288 Sue, 1. A site visit has been scheduled with DWR and the USACE to verify jurisdictional features on site and to verify intermittent/perennial stream determinations. Modifications may be necessary and/or additional information may be required upon conclusion of the site visit. • The site visit occurred on December 05, 2023. No modifications were requested. 2. Impact drawings provided do not indicate that riprap dissipators will be installed at culvert outlets. It is DWR's experience that energy dissipation is typically required by NCDEML or local government Sediment and Erosion Control program. Please clarify if riprap aprons are proposed and if so, please clearly show them as a separate entity in the table of impacts and on impact plan sheets and culvert profiles. • Revised drawings including the dissipater pad and impact table has been included within this response package. 3. The culvert at impact S2 does not appear to be in alignment with the stream channel at the outlet. Poor alignment typically results in streambank erosion and downstream sediment deposition. Please revise the culvert installation to provide better alignment with the stream channel. If proper alignment results in changes to impact lengths, please adjust the impact table and mitigation requirements accordingly. • The revised drawings include a revision to this culvert alignment. 4. The temporary impact S7 shows sewer line installation immediately downstream of the road/culvert installation. Please explain why the sewer line could not be installed within the roadway impact area to reduce impacts to the stream. • The sewer line has been designed in its proposed location due to the construction sequence and for maintenance/accessibility. The sewer line will be installed before the construction of the roadway. Additionally, if maintenance is required installing the designed alignment would prevent damage to the road. Charlotte Water will be operating the line once construction is completed. The line will be serving apartments in Phase 2 before the road construction. ATLAS Environmental, Inc. 338 S. Sharon Amity Road, #411 Charlotte, North Carolina 28211 704-512-1206 (o) / 828-712-9205 (m) www.atlasenvi.com / Offices in Asheville and Charlotte S.7 , Please clarify the purpose of Impact S3. It appears that the pond grading does not match the impactshading. • Impact S3 is for the permanent fill associated with the pond grading. Impact S9 is identified as secondary impacts. Please provide plans sheets and construction details which clearly show that all instream work will be conducted "in the dry". The impact table does not list any temporary impacts for dewatering during culvert installation. • All proposed in stream work will be completed in the dry by establishing a de -watering zone by using a pump around system to prevent flowing water in the work area. The pump around system includes one pump to move water around the work area and a second smaller pump to de -water seepage from the work area. The coffer dam will be constructed from non-erodable materials and will not alter the bed or banks of the channel. A pump around detail has been included within this response package. 7. For sewer line crossings of streams, where temporary impacts are proposed, please provide a stream restoration detail sheet. • A stream restoration detail sheet has been included within this response package. Best regards, Jacob Sinclair P.G., PWS Atlas Environmental Inc. Senior Environmental Specialist ATLAS Environmental, Inc. 338 S. Sharon Amity Road, #411 Charlotte, North Carolina 28211 704-512-1206 (o) / 828-712-9205 (m) www.atlasenvi.com / Offices in Asheville and Charlotte EXAMPLE OF PUMP -AROUND OPERATION NOTES: 1) All excavation shall be performed in only dry or isolated areas of the work zone. 2) Impervious dikes are to be used to isolate work from stream flow when necessary. 3) Maintenance of stream flow operations shall be incidental to the work. This includes polyethylene sheeting, diversion pipes, pumps and hoses. 4) Pumps and hoses shall be of sufficient size to dewater the work area. EW&KWAL VV 61 - • Silt Bag IMPERVIOUS DIKE (SEE PROJECT SPECIAL PROVISIONS) TEMPORARY FLEXIBLE HOSE Siff Bag 1 DEWATERING PUMP 1 1 1 1 1 EXISTING STREAM � CHANNEL I I CULVERT 1 I 1 ow PUMPAROUND TOP OF BANK SEQUENCE OF CONSTRUCTION FOR TYPICAL WORK AREA 1. INSTALL SPECIAL STILLING BASIN(S). 2. INSTALL UPSTREAM PUMP AND TEMPORARY FLEXIBLE HOSE. 3. PLACE UPSTREAM IMPERVIOUS DIKE AND BEGIN PUMPING OPERATIONS FOR STREAM DIVERSION. 4. PLACE DOWNSTREAM IMPERVIOUS DIKE AND PUMPING APPARATUS. DEWATER ENTRAPPED AREA.AREA TO BE DEWATERED SHALL BE EQUAL TO ONE DAY'S WORK. 5. INSTALL CULVERT(S) IN ACCORDANCE WITH THE PLANS. 6. EXCAVATE ANY ACCUMULATED SILT AND DEWATER BEFORE REMOVAL OF IMPERVIOUS DIKES. REMOVE IMPERVIOUS DIKES, PUMPS, AND TEMPORARY FLEXIBLE HOSE. (DOWNSTREAM IMPERVIOUS DIKES FIRST). 7. REMOVE SPECIAL STILLING BASIN(S) AND BACKFILL. STABILIZE DISTURBED AREA WITH SEED AND MULCH. IMPERVIOUS DIKE Project Name: North Creek Village Phase II Location: 17705 Davidson -Concord Road Huntersville, NC 28078 For: Magnolia Huntersville II LLC Attn: Stephen Vinson Coordinates: 35.453766,-80.800917 Date: November 10, 2023 Notes: Not to scale. Stream Restoration Plan for Temporary Sewer Line Trenching Lengths and widths may vary depending LLLLLLL. on channel dimensions. LLLLLLLL ��LLLLLLI LLLLLLLLL Plan View Existing channel substrate/material will LLLLLLLLLLI be stockpiled for use in restored channel. LLLLLLLLLL' ._LLLL LLLLLLLLI LLLLLLLL .LLLLLI �LLLLL. Matting will be coir fiber and secured with LLLLLLLLL. LLLLLLLLLI . hardwood stakes. LLLLLLLLLL ._LLLLLLLLLLLLL LLLLLLLL ..LLLLLLLLLLLLLL. LLLLLLLL! --LLLLLLLLLLLLLL A pump around zone will be established LLLLLLLL. _LLLLLLLLLLLLLLLL using non -erosive materials to prevent LLLLLLLL. LLLLLLLLL. LLLLLLLLLLLLLI LLLLLLLLLLLLLL. LLLLLLLLLLLLLLL flowing water in the work area as LLLLLLLL! LLLLLLL Channel Bed and OHWM necessary. A de -watering pump may be LLLLLL! restored to preexisting condition required if seepage is present. LLLLLLL: LLLLLLL. LLLLLLL .LLLLLLLLLL. LLLLLI LLLLLLLLLL No stilling basins are proposed. LLLLL. LLLLLLLLLLL- LLLLLLL. LLLLLLL. .LLLLLLLLLLLL .LLLLLLLLLLLLL Upper Banks laid back to — pp The OHWM and channel substrate will be LLLLLLLL. LLLLLLLLLL. .LLLLLLLLLLLLLL LLLLLLLLLLLLLLL 2:1 slope restored at the preexisting condition LLLLLLLLLL. LLLLLLLLLLLLL L includingslope, cross sectional area, and p LLLLLLLLL. LL LL LLLLL. elevation. LLLLLLLLL. LLLLLLLLL. LLLLLLLLLL. :_LLLLLLLLLLL- LLLLLLLLL. .-LLLLLLLLLLLLL LLLLLLLLL. LLLLLLLLLLLLL LLLLLLLL. LLLLLLLLLLLLLLL Mattingto stabilize LLLLLLLL. LLLLLLLLI LLLLLLLL. LLLLLLLLLLLLLLLL LLLLLLLLLLLLLLL: LLLLLLLLLLLLL. temporary Impact LLLLLLLLLL. LLLLLLLLLLLL LLLLLLLLL. -LLLLLLLLLLL. LLLLLLLLL. ._LLLLLLLLLLL-- LLLLLLLL. _LLLLLLLLLLLLL LLLLLLLLI _LLLLLLLLLLLLLL LLLLLLLL. LLLLLLLLLLLLLL LLLLLLLLL. LLLLLLLLLLLLLL LLLLLLLLLI LLLLLLLLLLLLLL LLLLLLLLLL-. LLLLLLLLLLLLL LLLLLLLLLL LLLI LLLLLLLLLLLL LLLLLLLLLLLL! 'LLLLLLLLLLLL LLLLLLLLLLLI ._LLLLLLLLLLL LLLLLLLLLLLLLI ._LLLLLLLLLLL LLLLLLLLLLLL: ._LLLLLLLLLLL Existing ground and ---LLLLLLLLLI LLLLLLLLLLLLLLI LLLLLLLLLLLLLL LLLLLLLLLLLL ._LLLLLLLLLLLLL LLLLLLLLLLLLL entrenched channel LLLLLLLLLLLLLL LLLLLLLLLLLLLL LLLLLLLLLLLLLL LLLLLLLLLLLLLLL LLLLLLLL L!' LLLLLLLLLLLLLLL LLLLLLLLLL -LLLLLLLLLLLLLLL LLLLLLLLLLLL L-LLLLLLLLLLLLLL LLLLLLLLLLLLL. _LLLLLLLLLLLLLLLLL LLLLLLLLLLLLLL .-LL-LLLLLLLLLLLLL LLLLLLLLLLLLLL -LL-LLLLLLLLLLLLL !_LLLLLLLLLLLLL Matting to stabilize temporary impact area Banks sloped to — 2:1 after Channel Bed and OHWM temporary impact restored to preexisting Profile condition Project Name: North Creek Village Phase II RQ C Location: 17705 Davidson -Concord Rd Huntersville, NC 28078 ONMENTAL For: Magnolia Huntersville II LLC Attn: Stephen Vinson Coordinates: 35.453766°,-80.800917' Date: November 10, 2023 Figure: �OPp P EXISTING RIGHT OF WAY / EXISTING TREE LINE C7 Qe�Sj 'O� STREAM CH 600 ±66 LF / rI QJ /WETLAND WL 1100 ±0.047 AC o EXISTING BUILDING WETLAND WL 1200 ±0.002 AC ° STREAM CH 500 ±96 LF TH jai i D E RTH CREEK PHASE 1 L )� IJIJI STREAM CH 100 ±3,177 LF STREAM CH 400 ±72 LF PROPERTY LINE / - STREAM CH 300 ±65 LF / T WETLANDS WL 1000 ±0.001 AC — HIGH WATERMARK 11 STREAM CH 200 ±1,934 LF t � I / — — I I I ^fin ColeJenest&Stone / 1 BOLTON & NEW, INC. WETLAND WL A ±0.006 AC EXISTING CONDITIONS 0 400 800 NORTH CREEK PHASE 2 HORZ. Z 12.07.23 SCALE FEET Mm ��C _ J � � , , , I ICII -I ��� �� � � �•�, ����, _� I I ----�- �IIIIIIIIIIIIIIIII '♦`;``: ♦ .�..\ `, -� I i! . ♦ ��. / `� III 'I •\ III 1Ul•� 1� IMPACTS COleJenest&Stone NORTH CREEK BOLTON & NENK,INC. 12.07.23 0 400 800 HORZ. SCALE FEET Z `3x CLEAN WATER BYPASS SYSTEM TO MAINTAIN STREAM HYDROLOGY Colelenest&Stone BOLTON & MENK,INC. Al FUTURE COMMERCIAL DEVELOPMENT PROPOSED1'CONTOURS STREM MPAT 300L F,10.0 3CAcS1 LIMITS OF STREAM IMPACT OHWM wiviom / PROPOSED RETAINING WALL, TYP. Stream Impact S10 Embedded R1prap — 20 LF, 0.001 Ac 0 I M PACT S1 0 50 100 NORTH CREEK HORZ. Z 12.07.23 SCALE FEET 4) 740 740 FINISHED ROAD GRADE EXISTING GRADE PROPOSED CLEAN WATER STORM SYSTEM TO MAINTAIN STREAM HYDROLOGY 0+00 1 +00 2+00 SECTION S1 0 80 160 (D Colelenest&Stone NORTH CREEK HORZ. BOLTON & MENK,INC. 12.07.23 SCALE FEET LIMITS OF STREAM IMPACT Stream Impact S13 40 LF (20' above 20' below) PROPOSED ------------------ STORM CULVERT STREAM IMPACT S2 67 LF, 0.005 Ac TEMPORARY STREAM IMPACT S7 ±17 LF ±0.0008 AC (36 SF) OHWM \ Stream Impact S11 Embedded 1 Ac 15 LF, 0.001 Ac PROPERTY LINE LIMITS OF \ STREAM IMPACT \ \ 0 Stream Impact S3 Permanent Fill 28 LF, 0.001 Ac Stream Impact S9 Secondary Impacts 53 LF, 0.003 Ac i Colelenest&Stone BOLTON & MENK,INC. IMPACT S2 0 40 80 NORTH CREEK HORZ. Z 12.07.23 SCALE FEET SECTION S2 0 60 120 Colelenest&Stone NORTH CREEK HORZ. / 1 BOLTON & NEN141NC. 12.07.23 SCALE FEET \ SANITARY SEWER LINE, TYP. ORDINARY HIGH PROPOSED WATER MARK _ STORM CULVERT \ STREAM IMPACT S4 / ±68 LF ±0.009 (402SF) Stream Impact S14 40 LF (20' above 20' below) a LIMITS OF STREAM IMPACT Stream Impact S12 Embedded Riprap 16 LF, 0.002 Ac i Colelenest&Stone 6VLIVIV Q[ r�rnlii�llVf�� I M PACT S4 0 40 80 NORTH CREEK HORZ. Z 12.07.23 SCALE FEET SECTION S4 0 80 160 Colelenest&Stone NORTH CREEK HORZ. 1 BOLTON & MENIC,INC. 12.07.23 SCALE FEET i 58 STREAM IMPACT S5 55 5LF,0.001Ac 54 53 52 � \ STREAM IMPACT S6 \\ \ Temporary Trenching \ \ - 20 LF, 0.001 Ac \ \ Stream Impact S8 LIMITS OF STREAM / Temporary Trenching IMPACT / 1 \ ORDINARY HIGH WATER MARK LIMITS OF STREAM IMPACT / \ \ \ \ \ PROPOSED SANITARY \ \ SEWER, TYP IMPACT S5 Colelenest&Stone NORTH CREEK BOLTON & MENK,INC. 12.07.23 0 50 100 HORZ. z SCALE FEET 4 ) Impact Name Flow LF Ac Duration Reason S1 CH 100 Intermittent 300 0.013 Permanent Culvert S2 CH 100 Intermittent 67 0.005 Permanent Culvert S3 CH 500 Intermittent 28 0.001 Permanent Fill S4 CH 100 Perennial 68 0.009 Permanent Culvert S5 CH 400 Intermittent 5 0.001 Permanent Fill S6 CH 300 Intermittent 20 0.001 Temporary Sewer Installation S7 CH 100 Intermittent 17 0.001 Temporary Sewer Installation S8 CH 400 Intermittent 28 0.001 Temporary Sewer Installation S9 CH 500 Intermittent 53 0.003 Permanent Secondary Impacts S10 CH 100 Intermittent 20 0.001 Permanent Embeddd Riprap S11 CH 100 Intermittent 15 0.001 Permanent Embeddd Riprap S12 CH 100 Perennial 16 0.002 Permanent Embeddd Riprap S13 CH 100 Intermittent 40 n/a Temporary De-Watering/Pump Around S14 CH 100 Perennial 40 n/a Temporary De-Watering/Pump Around