Loading...
HomeMy WebLinkAboutNCC216734_NOT Closeout Documents_20240103 Z_ 4 LaZZ j f CITY OF ROCKY MOUNT A:4� t, Erosion Control Site Inspection Report ROCKY MOUNT PUBLIC WORKS rift:cCNTrR Or raj. Project: Flagmarsh Hills Date: Monday, Sept. 26 2022 Location: Centipede Road Time: 8:00 am Responsible Party: Charles Hooks Weather& Site Conditions: Sunny 75/ Dry On-Going Activities at Time of Inspection: None Contact Made With(Employee/Employer:) Ron Griggs Site currently under NOV Site currently under CNOV ✓ S & E Permit Issued by CRM Copy of Approved Plan On-Site Rain Guage Provided NPDES Records available On-Site Measures implemented per Plan ✓ Modifications approved by CRM Is the site in compliance with S.P.C.A.? Yes ✓ No If no, check violations below: Failure to take all reasonable No Approved Plan measures Failure to follow approved plan Inadequate Buffer Zone Failure to submit revised plan Graded slopes and fills too steep Failure to provide adequate ground cover Unprotected exposed slopes Insufficient measures to retain Failure to maintain erosion control sediment on site measures Other(describe) Has off-site sedimentation occurred since last inspection? Yes No Degree if yes: Corrective Measures Needed: Deadline: Entire site has been stabilized and all erosion control devises have been removed This project can be closed out. 01,414. • ,ram +�.-�, `�` � Z•- '^�n,-► "al` 4 - `; n�s�ti M sx • s; why w ,S 'd ""r41". ... x:_ }}r- r!" ter..,x` � " {,.� 4+4 Y #. iT vT ,,, Win. S-a. •k W�^r• •:! ., Auk.; FFa.4��� �.$. '�`��kss�JkYX.. �"3,*.t "1C! .iA�.;a i - .: st �. -