Loading...
HomeMy WebLinkAbout20150958 Ver 1_More Info Received_20150921 (2)Strickland, Bev From: Todd Love <toddm|@ rg> Sent: Monday, September Zl'ZUl5lU:34AK4 To: Strickland, Bev Subject: RE: Cedar GreenvvayTrail DVVR#l5U508 Attachments: E[4.pdf Beverly, This erosion control sheet also should be with the full size plans. Thanks, Todd From: Strickland, Bev [mai|to:bev.sthcNand@ncdenr.Rov Sent: Monday, September Z1,ZU1S1U:Z6AM To: Todd Love Subject: RE: Cedar GreenvxayTrail DVVR#1SUS9O Uffin Beveidy Stilddand, LaserfldheAdmmhn�strator N[DENR Division of Water Resources Physical: Suite 1229,512N Salisbury, N[ Mailing: Mail Service Center 1617, Raleigh, N[ 27699'1617 Phone#919'7O7f8789 Email Address: Bev.Strick|and@ncdenr.gov From: Todd Love [nlai Ito: toddnd(acitvmfws.onol Sent: Monday, September 21, 2015 10:23 AM To: Strickland, Bev Subject: RE: Cedar GreenwayTrai| - OVVR# 150598 EM Fromn:3thck|and,Bev[mai|to:bev.sthcNand@ncdenr.gov Sent: Monday, September Z1,ZU1S9:1ZAM To: Todd Love Subject: Cedar GreenvxayTrail DVVR#1SUS9O Mr. Love, 1 Could you please send me a pdf copy of the full size site plans for the above listed project? Below is a link to the 401 project file for Cedar Greenway Trail. http:// its .enr.state.nc.us /Weblink8 /0 /fo1/309785 /Rowl.asox Thanks Bev ic3wv4 I sHa" B v iHy Stu ^iiclldand, tri o ^did Adnihnu strator NCDENR - Division of Water Resources Physical: Suite 1219, 512 N Salisbury, NC Mailing: Mail Service Center 1617, Raleigh, NC 27699 -1617 Phone# 919 - 707 -8789 Email Address: Bev.Strickland @ncdenr.gov PROP. 40' GREENWAY EASEMENT �F PROP. 42" RCP E E E E E E E E E f E k WITH HEADWALL AND FES E E E E k E E F E k F IMPERVIOUS E DIKE DEWATERING DEVICE SPECIAL STILLING /� BASIN _ IMPERVIOUS DIKE CLASS I RIP RAP ENERGY DISSIPATION \YI A S t E e E E E E F EEE SEE `EF Y Y V v� `J '\ 10 0 D k k E E / E E Ek Ek EE JE E E E E k E k F k Ek EE EEFE EF EEE f E E E E FEk E W F`N CONSTRUCTION SEQUENCE 1. PREPARE BY -PASS PUMP OUTLET STABILIZATION. 2. INSTALL UPSTREAM PUMP AND NECESSARY PIPING. 3. PLACE UPSTREAM IMPERVIOUS DIKE AND BEGIN BY -PASS PUMPING OPERATIONS FOR STREAM DIVERSION. 4. PLACE DOWNSTREAM IMPERVIOUS DIKE AND PUMPING SYSTEM AND DEWATER WORK AREA. 5. INSTALL PIPE, FLARED END SECTION AND HEADWALL ACCORDING TO PLAN. 6. REMOVE ANY ACCUMULATED SILT AND WATER FROM WORK AREA BEFORE REMOVAL OF IMPERVIOUS DIKES. REMOVE IMPERVIOUS DIKES, PUMPS AND PIPING. (DOWNSTREAM IMPERVIOUS DIKE REMOVED FIRST.) 7. REMOVE BY -PASS PUMP OUTLET STABILIZATION AND RE- ESTABLISH AREA. NOTES: 1) ALL EXCAVATION SHALL BE PERFORMED IN ONLY DRY OR ISOLATED AREAS OF THE WORK ZONE. 2) IMPERVIOUS DIKES ARE TO BE USED TO ISOLATE WORK FROM STREAM FLOW WHEN NECESSARY. 3) MAINTENANCE OF STREAM FLOW OPERATIONS SHALL BE INCIDENTAL TO THE WORK. THIS INCLUDES POLYETHYLENE SHEETING, DIVERSION PIPES, PUMPS AND HOSES. 4) PUMPS AND HOSES SHALL BE OF SUFFICIENT SIZE TO DEWATER THE WORK AREA. STREAM CROSSING CONSTRUCTION PLANS TEMPORARY CONSTRUCTION EASEMENT E� - r--\ \NIQ� CITY OF WINSTON-SALEM, N. C. PROJECT NUMBER SHEET NUMBER 200840 EC -4 SCALE PROJECT DESIGN ENGINEER HORIZ. 1 " =20' REVISIONS PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION �� I• F E � f E E E CL PROPOSED CONCRETE E k `EFE PREFABRICATED BRIDGE BEGIN BRIDGE /� E E E /CJ� PROP. 40' STA: 36 +86.34 E Ek E E / E F E f GREENWAY EASEMENT /- //'/'_ ����.����``` / E k F EE EE FF Fk p E ✓ ' "// DEWATERING DEVICE SPECIAL STILLING BASIN 36 +Op '� -� _ \\ // / �� / \ \ \\ E E E E E E ND O \\ E STA. 37+1 37+ 11 • k E F E F Er /1' --- - - - - -- / ' \ E E E k E E E k E E E E fE E E E E E \ � PERVIOUS f /✓ \\ E f \� E f DIKES F EE FF Ekk FEk k ' "/ O� I E F E k E k F k _ E k E k E ✓O F E k E E TEMPORARY E E E F E F F F E k E `} E F E E F F E CONSTRUCTION EASEMENT E k ti E Ek E Fk E kE E E E E�� k k EEk E E F E k E E Lr E <` E E E k E F E E k E k t k E f E k E E k E E w E k E F F E E E E E f E E E E E E E F F E E E F F E E k EF\ 'NFEk INSTALL STRE E EFCRES(zING AS `NEEDED / �( FW AN K_ F,4 k k F E E E E E E E E . / .7 / 4...USE 1 -36" PIPE." ETAIL SHEET EC-2. �0 E E E F E E E E E F E E E E E 1- , E E E F E E E E E E E F E E E f / E E E E E E E E E E E E E E E F E _ CREEK BANK W--- r-A IR E 1� - F W CONSTRUCTION SEQUENCE INSTALLATION OF TEMPORARY STREAM CROSSING: 1) WORK SHALL BE COMPLETED IN THE DRY. DAMMING OF STREAM IS LIMITED TO NO MORE THAN ONE DAY. 2) PLACE IMPERVIOUS DIKES AND BEGIN PUMPING TO DEWATER WORK AREA. 3) INSTALL BEDDING, TEMPORARY STREAM CROSSING PIPES AND BACKFILL ACCORDING TO PLAN. 4) REMOVE ANY ACCUMULATED SILT AND WATER FROM WORK AREA BEFORE REMOVAL OF IMPERVIOUS DIKES. REMOVE IMPERVIOUS DIKES, PUMPS AND PIPING. (DOWNSTREAM IMPERVIOUS DIKE REMOVED FIRST.) REMOVAL OF TEMPORARY STREAM CROSSING: 1) WORK SHALL BE COMPLETED IN THE DRY. DAMMING OF STREAM IS LIMITED TO NO MORE THAN ONE DAY. 2) PLACE IMPERVIOUS DIKES AND BEGIN PUMPING TO DEWATER WORK AREA. 3) REMOVE BACKFILL, TEMPORARY STREAM CROSSING PIPES AND BEDDING. BACKFILL STREAM BED WITH NATURAL MATERIAL TO MATCH NATURAL STREAM BED PROFILE. 4) INSTALL EROSION CONTROL MATTING ON DISTURBED STREAM BANKS PER DETAIL BELOW. 5) REMOVE ANY ACCUMULATED SILT AND WATER FROM WORK AREA BEFORE REMOVAL OF IMPERVIOUS DIKES. REMOVE IMPERVIOUS DIKES, PUMPS AND PIPING. (DOWNSTREAM IMPERVIOUS DIKE REMOVED FIRST.) ARFF R i 2'7 F Mq,�, RFO 2' HEIGHT MIN. 1' TUCK - p NORMAL FLOW CREEK BOTTOM ,V 1 PRA F�P.� MATTING FOR EROSION CONTROL