Loading...
HomeMy WebLinkAboutNCC203746_NOT Closeout Documents_20240103 • ROY COOPER Governor 17 1 y.1) ) ELIZABETH S.BISER ``'✓/. ', Secretary AA; " `. WILLIAM E.TOBY VINSON,JR Interim Director NORTH CAROLINA environmental Quality Dear Sir or Madam: Attached is a copy of the inspection report which was prepared following an on-site inspection of the subject site. This report is intended to provide you with information concerning the status of the site as it relates to compliance with the North Carolina Sedimentation Pollution Control Act on 1973. Please review this report carefully as it may contain corrective actions needed or comments which will assist you in meeting the required performance standards of the Act. • It is our desire that any and all possible problems be discussed and resolved at the earlies possible time. To facilitate this effort, please contact the named inspector at the address shown on the inspection report if you have any questions. Sincerely Land Quality Section Mooresville Regional Office • • • • • North Carolina Department of Environmental Quality Division of Energy,Mineral and Land Resources DEO) Mooresville Regional Office1610 East Center Avenue,Suite 301 I Mooresville,North Carolina 281I5 704-663-1699_ Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 610 East Center Avenue,Suite 301,Mooresville,NC 28115 (704) 663-1699 County: Catawba Project: Mountain Creek Park River basin: Catawba Person financially responsible:Catawba County-John T Cameron,Construction Project#: CATAW-2020-018 Manager Address: 100 Southwest Blvd./25 Government Dr,PO Box 389, 1. Project Location: Little Mountain Road,Sherrills Ford Pictures: No • 2. Weather and soil conditions: Cloudy,Workable soil Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: • g. 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) • • Degree of damage: • 8. Contact made with(name): John Heape • Title: Site manager Inspection report: Sent Report Date given/sent: October 06,2023 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain Project in has sen complianceed and No r additional der self-monitoring or self-inspections are required.Pro J • • the SPCA.Termination of coverage under the NPDES General Stormwater Permit for • Construction Activities(NCGO I)must be requested by the pennittee via a Notice of Termination(NOT).The NOT is available at: • https://edocs.deq.nc.gov/Forms/N G 1 the rNOTtion.Please note that this correspondence • must be uploaded as part of completing ess. Reported by: tan Callaway Others present: Date of inspection: September 25,2023 Time arriving on site: 9:00 AM Time leaving site: 10:00 AM • cc: