HomeMy WebLinkAbout670062_Compliance Evaluation Inspection_20230629.nw
, DtY1SiQri U Vi'aten ReSO1lrCes _
aclity Number:. L, �Dtv�smn of5il and�Vater Conservat><on
_' ' Q Other AgencyCal
_
Type of Visit: (D Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance
Reason for Visit: ® Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access
Date of Visit: L3 Arrival Time: Departure Time: ''County: Region:
Farm Name: D a" l -e 4 Owner Email:
Owner Name: Phone:
Mailing Address:
Physical Address:
Facility Contact: Title: Phone:
Onsite Representative: (�i<„�-� %'1E� Integrator:
Certified Operator: Certification Number:
Back-up Operator: Certification Number:
Location of Farm: Latitude: Longitude:
'Design
Tot -
Current `° Design
Current
Current n _ Desigu
°
one = Ca ae1u� ' VVet Ponta ac-Fa
C file C l? acB
p _ tY
J�o p
-
Layer'_
_
Non -Layer
�3� De rgn
Cur ren
Dry Poultry Ca"acity
Po `
f$
Otli`rd-
er'" _
�....5,12
__
_
7�
Wean to Finish
Wean to Feeder
G �
Feeder to Finish
Farrow to Wean
Farrow to Feeder
Farrow to Finish
Gilts
Boars
Layers
Non -Layers
Pullets
Turkeys
Turkey Poults
Other
Dairy Cow
Dairy Calf
Dairy Heifer
Dry Cow
Non -Dairy
Beef Stocker
Beef Feeder
Beef Brood Cow
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation?
❑Yes
No
❑ NA
❑ NE
Discharge originated at: ❑Structure ❑Application Field ❑Other:
^
a. Was the conveyance man-made?
❑Yes
❑ No
�A
❑ NE
b. Did the discharge reach waters of the State? (If yes, notify DWR)
❑Yes
❑ No
TA
❑ NE
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (If yes, notify DWR)
❑Yes
❑ No
A
❑ NE
2. Is there evidence of a past discharge from any part of the operation?
❑Yes
5No
g
❑ NANE
3. Were there any observable adverse impacts or potential adverse impacts to the waters
❑Yes
❑ NA
❑ NE
of the State other than from a discharge?
Page 1 of 3
5/12/2020 Continued
Facility Number: 16-t_ jDate of Inspection: (_ m-.. 2
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No ❑ NA ❑ NE
a. If yes, is waste level into the structural freeboard? ❑ Yes [:]No [;j NA ❑ NE
Structure 1 Structure 2
Identifier:
Spillway?:
Designed Freeboard (in): c3
Observed Freeboard (in):
Structure 3 Structure 4 Structure 5 Structure 6
5. Are there any immediate threats to the integrity of any of the structures observed?
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a
waste management or closure plan?
❑ Yes 16Zo ❑ NA ❑ NE
❑ Yes No ❑ NA ❑ NE
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental t reat, notify DWR
7. Do any of the structures need maintenance or improvement? ❑ Yes ,. No ❑ NA ❑ NE
8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes EKo ❑ NA ❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require ❑ Yes U No ❑ NA ❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes qo ❑ NA ❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes E3"N'o ❑ NA ❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crop Type(s):
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP?
❑ Yes
io
❑ NA
❑ NE
15. Does the receiving crop and/or land application site need improvement?
❑ Yes
[ No
❑ NA
❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable
❑ Yes
2-N*o
❑ NA
❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application?
❑ Yes
❑ NA
❑ NE
18. Is there a lack of properly operating waste application equipment?
El Yes
VNo
❑ NA
❑ NE
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
❑ Yes
[ N ❑ NA
❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
❑ Yes
No
❑ NA
❑ NE
the appropriate box.
❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements
❑ Other:
21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes [�No ❑ NA ❑ NE
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey
22. Did the facility fail to install and maintain a rain gauge? ❑ Yes E]11No ❑ NA ❑ NE
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No ❑ NA ❑ NE
Page 2 of 3 511212020 Continued
Facility Number: (9 '71 jDate of Inspection: T
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes To ❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes E2,N ❑ NA ❑ NE
the appropriate box(es) below.
❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes EfNo ❑ NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No DNA ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWNIP?
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative?
34. Does the facility require a follow-up visit by the same agency?
❑ Yes 10 ❑ NA ❑ NE
[:]Yes io ❑ NA ❑ NE
❑ Yes No ❑ NA ❑ NE
❑ Yes ❑ No ❑ NA [ J 1V�
❑ Yes �No ❑ NA ❑ NE
❑ Yes [� No , ❑ NA ❑ NE
[—]Yes Ft<o ❑ NA ❑ NE
J
Reviewer/Inspector Signature: Date: to