Loading...
HomeMy WebLinkAbout670062_Compliance Evaluation Inspection_20230629.nw­ , DtY1SiQri U Vi'aten ReSO1lrCes _ aclity Number:. L, �Dtv�smn of5il and�Vater Conservat><on _' ' Q Other AgencyCal _ Type of Visit: (D Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: ® Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: L3 Arrival Time: Departure Time: ''County: Region: Farm Name: D a" l -e 4 Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Title: Phone: Onsite Representative: (�i<„�-� %'1E� Integrator: Certified Operator: Certification Number: Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: 'Design Tot - Current `° Design Current Current n _ Desigu ° one = Ca ae1u� ' VVet Ponta ac-Fa C file C l? acB p _ tY J�o p - Layer'_ _ Non -Layer �3� De rgn Cur ren Dry Poultry Ca"acity Po ` f$ Otli`rd- er'" _ �....5,12 __ _ 7� Wean to Finish Wean to Feeder G � Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Layers Non -Layers Pullets Turkeys Turkey Poults Other Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑Yes No ❑ NA ❑ NE Discharge originated at: ❑Structure ❑Application Field ❑Other: ^ a. Was the conveyance man-made? ❑Yes ❑ No �A ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑Yes ❑ No TA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑Yes ❑ No A ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑Yes 5No g ❑ NANE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑Yes ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 5/12/2020 Continued Facility Number: 16-t_ jDate of Inspection: (_ m-.. 2 Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes [:]No [;j NA ❑ NE Structure 1 Structure 2 Identifier: Spillway?: Designed Freeboard (in): c3 Observed Freeboard (in): Structure 3 Structure 4 Structure 5 Structure 6 5. Are there any immediate threats to the integrity of any of the structures observed? (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes 16Zo ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental t reat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes ,. No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes EKo ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes U No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes qo ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes E3"N'o ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes io ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes [ No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes 2-N*o ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? El Yes VNo ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes [ N ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes [�No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes E]11No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No ❑ NA ❑ NE Page 2 of 3 511212020 Continued Facility Number: (9 '71 jDate of Inspection: T 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes To ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes E2,N ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes EfNo ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No DNA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWNIP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? ❑ Yes 10 ❑ NA ❑ NE [:]Yes io ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA [ J 1V� ❑ Yes �No ❑ NA ❑ NE ❑ Yes [� No , ❑ NA ❑ NE [—]Yes Ft<o ❑ NA ❑ NE J Reviewer/Inspector Signature: Date: to Page 3 of 3 511212020