Loading...
HomeMy WebLinkAbout670083_Compliance Evaluation Inspection_20230608'e �� � Division of Water Resources °- Facility Number .3 O Division of Soil and Water Conservations - _1 ..r QOthei-Agency a; Type of Visit: ® Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: (3 Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: +I=i' Arrival Time: Departure Time: County: Farm Name: ��1 ���yr.� Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Title: Phone: Onsite Representative: ` � �.sL c..• rnt LLb.r Integrator: Certified Operator: Certification Number: Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: Region: n. Design Current Design Curent Design 'Current, Swine Capae�ty, 1?op Wet, Poultry Capacity, l'gp Cattle 0, �. Capacity Pop Layer Non -Layer <F , Design L3 Current Pity—Ai Poultry_: n Ca achy l'oP. _< Other oA Discharges Wean to Finish Wean to Feeder � OD � Cli Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Layers Non -Layers Pullets Turkeys Turkey Poults Other Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow and Stream Imaacts 1. Is any discharge observed from any part of the operation? ❑Yes To ❑ NA ❑ NE Discharge originated at: ❑Structure ❑Application Field ❑Other: a. Was the conveyance man-made? ❑Yes ❑ No �NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑Yes ❑ No �A ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? Page I of 3 ❑ Yes ❑ No [�NA ❑ NE ❑ Yes o ❑ NA ❑ NE ❑ Yes T�o ❑ NA ❑ NE 5/12/2020 Continued Facility Number: jDate of Inspection: `Z Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes Efl No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No TA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: _ I Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes E2-90 ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes Z ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes FXo' ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes d_�o DNA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes [:4 No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes E---No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes �o ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? 0 Yes . �o ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes Ej/4o ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes O No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes ❑,I o ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑Design ❑Maps ❑LeaseAgreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes o ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes [,�No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes r;;[/No 0 NA ❑ NE Page 2 of 3 511212020 Continued Facility Number: jDate of Inspection: 17 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes <o ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes N 0 NX ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes 0 ETNA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes Io ❑ NA ❑ NE and report mortality rates that were higher than normal? N 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA DINE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑mO ❑ NA 0 NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑'�lo ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes E/No ❑ NA ❑ NE Comments'(refer to' question 0: Explain any'YES',answers=and/or an' additional recommendations or aay;other°comments. , Use dravvin as.of facility to better explaiu'situations=(use additional pages as=necessary) .. Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 Q,e Phone: Date: Z 511212020