Loading...
HomeMy WebLinkAbout670013_Compliance Evaluation Inspection_202306080Division of Water Resources Pa�ility Number O Division of Soil and'�'ater Conservation _ =_ Q Other Age�uc z. Type of Visit: ® Compliance Inspection 0 Operation Review O Structure Evaluation O Technical Assistance Reason for Visit: p Routine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access Date of Visit: L3 Arrival Time: Departure Time: c7 County: Farm Name: Wc-, c3'JW 1, �,Y., �Z_ Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Title: Onsite Representative:�� Certified Operator: Back-up Operator: Location of Farm: Latitude: Phone: Integrator: Certification Number: Certification Number: Longitude: Region: Design Current Design Current Design :Current <_ Sevine Capacity Pop ° Wet.i'oultry Capacity °. Pop Cattle " , - , Capacrty Pop Layer Non -Layer ,, _.. Via. Design Current Dry Poultryl _ Capacity Pop. :Other. : Wean to Finish Wean to Feeder cj��-i© Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Layers Non -Layers Pullets Turkeys Turkey Pouets Other Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes o ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No E],I A ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes ❑ No I� NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes ❑ No NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes �o ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes �40 ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 5/12/2020 Continued Facility Number: '1 - t --? I Date of Inspection: 4� I Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes 2To ❑7NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NE Structure 1 Identifier: 50 Spillway?: Designed Freeboard (in): Observed Freeboard (in): Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 5. Are there any immediate threats to the integrity of any of the structures observed? (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes �NoEj ❑ NE ❑ Yes No ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes dN o ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes I I�No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) `E% 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Aualication 10. Are there any required buffers, setbacks, or compliance alternatives that need 0 Yes O� ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes OeKo ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes gNo ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes LEa �No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes ❑ No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Other 21. Does record keeping need improvement? If yes, check pprop i to box below. Yes ❑ No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly FreeboardX s alyl ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120nspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ' �Nc ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No ❑ NA ❑ NE Page 2 of 3 511212020 Continued Facility Number: 1 Date of Inspection: W 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes/,-E] NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes ��o❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? [—]Yes J No VNA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below ❑ Application Field ❑ Lagoon/storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? ❑ Yes No ❑ NA ❑ NE ❑ Yes VNo ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA [ NE ❑ Yes [�o ❑ NA ❑ NE ❑ Yes [�N ❑ NA ❑ NE [:]Yes [No ❑ NA ❑ NE M Reviewer/Inspector Signature: Date: JL 2i3 Page 3 of 3 511212020