Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
670025_Compliance Evaluation Inspection_20230608
U Division of Water Resources Facility Number h Z - 2 O Division of Soil and' Water Conservation s ° O OtherAgency Type of Visit: ® Compliance Inspection O Operation Review O Structure Evaluation O Technical Assistance Reason for Visit: 0 Routine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access Date of Visit: t (��L3� Arrival Time: I S1 { 0 Departure Time: ® County: Farm Name: 'Y OJA( j/ G am— S Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Phone: Title: Onsite Representative: :I r., ,A —At, C_� f'' ; ((z� Certified Operator: Back-up Operator: Location of Farm: Design Current Swine:'I Capacity, .-Pop: Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Other Latitude: Phone: Integrator: Certification Number: Certification Number: Longitude: Design Current' Wet Poultry ,Capacity Pope Layer Non -Layer Design Current Dav Poultry Capacity Pori: ". Layers Non -Layers Pullets Turkeys Turkey Poults r—TOther Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? Region: °Design Current Cattle° .Capacity 'Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow ❑ Yes [ No ❑ NA ❑ NE ❑ Yes ❑ No E2 A ❑ NE ❑ Yes ❑ No G A ❑ NE d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes ❑ No E3NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes E24o ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes �eNo ❑ NA ❑ NE of the State other than from a discharge? Page I of 3 511212020 Continued Facility Number: - Date of Inspection: f{ 2 Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes a. If yes, is waste level into the structural freeboard? ❑ Yes Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): Structure I Structure 2 Structure 3 13Z No 0 NA 0 NE ❑ No VNA ❑ NE Structure 4 Structure 5 Structure 6 5. Are there any immediate threats to the integrity of any of the structures observed? (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes ❑ AYb NA ❑ NE ❑ Yes No ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes �K(o ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes to ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes ©No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes EZ No ❑ NA ❑ NE ❑ Excessive Ponding ' ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ffNo ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes E2rN0 ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes FlAo ❑ NA ❑ NE acres determination? /[� Does the facility lack adequate acreage for land application? ❑ Yes WD ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes N�17. ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes 5No� ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes O ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, Ninuelrispections opriate ox below. �(Yes ❑ No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard aste sis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 ❑ Monthly and 1 " Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes VNo ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ NA ❑ NE Page 2 of 3 511212020 Continued Facility Number: U17 VF5 jDate of Inspection: (D 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes �To ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes ❑140 ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes o ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes [:]No YNA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes To 1 ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑Ao ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. No 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes [] ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA [:3/NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes EDI�o ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes � ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes � 0 ❑ NA ❑ NE 9 Reviewer/Inspector Signature: �� �—` Date: b Page 3 of 3 511212020