HomeMy WebLinkAbout670052_Compliance Evaluation Inspection_20230728(1 Division of Water Resources
Facility Number , `� O Division of; o and Water Conservation � n
CO Other Agency
'ype of Visit: 0 Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance
Leason for Visit: & Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access
Date of Visit: ,^ j Arrival Time: Departure Time: County:
Farm Name: ,�i ,p.,� ; „ �G {,�_ Owner Email:
s
Owner Name: Phone:
Mailing Address:
Region:
Physical Address:
Facility Contact: Ao"try �$ 1�0 �� Title: Phone: I Z�1 �� (IQ
Onsite Representative: Integrator:
Certified Operator: Certification Number:
Back-up Operator: Certification Number:
Location of Farm: Latitude: Longitude:
Desig
twine.i ,° Capa6
Wean to Finish
Wean to Feeder
Feeder to Finish Ci
Farrow to Wean
Farrow to Feeder
f
ow to Finish
srs
Other
0
rrent
P
Design
Current
���' z��esign
Current,
op
Vt�ef:Poultry..
'
Capacity
Pop
Cattle
Capacity <'P,-
...°
Design. Cur"rent
I)rv6Poultrv=. Camcity ° Poii. °
Layers
Non -Layers
Pullets
Turkeys
Turkey Poults
Other
Dairy Cow
Dairy Calf
Dairy Heifer
Dry Cow
Non -Dairy
Beef Stocker
Beef Feeder
Beef Brood Cow
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation?
0 Yes
DZ
❑ NA
❑ NE
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
❑ Yes
❑ No
Z"NA
❑ NE
b. Did the discharge reach waters of the State? (If yes, notify DWR)
❑ Yes
❑ No
l P<A
❑ NE
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (If yes, notify DWR)
❑ Yes
❑ o
NA
❑ NE
2. Is there evidence of a past discharge from any part of the operation?
❑ Yes
[ NNo
❑ NA
❑ NE
3. Were there any observable adverse impacts or potential adverse impacts to the waters
❑ Yes
�No
❑ NA
❑ NE
of the State other than from a discharge?
Page I of 3 j
511212020 Continued
Facility Number: S jDate of Inspection: `I 7-T
Z
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate?
❑ Yes
OXo ❑ NA
❑ NE
a. If yes, is waste level into the structural freeboard?
❑ Yes
❑ No E�r<A
❑ NE
Structure 1 Structure 2 Structure 3 Structure 4
Structure 5
Structure 6
Identifier:
Spillway?:
Designed Freeboard (in):
Observed Freeboard (in): 4121
5. Are there any immediate threats to the integrity of any of the structures observed?
❑ Yes
�17No ❑ NA
❑ NE
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a
❑ Yes
No ❑ NA
❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR
7. Do any of the structures need maintenance or improvement? ❑ Yes lV ❑ NA ❑ NE
8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require ❑ Yes E2110 ❑ NA ❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need
❑ Yes E24o
❑ NA
❑ NE
maintenance or improvement?
/No
11. Is there evidence of incorrect land application? If yes, check the appropriate box below.
❑ Yes
❑ NA
❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate
Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crop Type(s):
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP?
❑ Yes No
❑ NA
❑ NE
15. Does the receiving crop and/or land application site need improvement?
❑ Yes FXo
❑ NA
❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable
❑ Yes ZN o
❑ NA
❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application?
❑ Yes o
❑ NA
❑ NE
18. Is there a lack of properly operating waste application equipment?
❑ Yes No
❑ NA
❑ NE
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
❑ Yes Ej<zo
❑ NA
❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
❑ Yes To
❑ NA
❑ NE
the appropriate box.
❑WUP ❑Checklists ❑Design ❑ Maps ❑ Lease Agreements ❑Other:
21. Does record keeping need i ovement? If yes, check the appropriate box below. es [:]No ❑ NA ❑ NE
❑ Waste Application Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑'Weather Code
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rainfall Inspections Qludge Survey
22. Did the facility fail to install and maintain a rain gauge? ❑Yes �o ❑ NA ❑ NE
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? [:]Yes YNo ❑ NA ❑ NE
Page 2 of 3 511212020 Continued
Facility Number: jDate of Inspection: -7 'Z_3
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes [3/No ❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check E]Wes ❑ No ❑ NA ❑ NE
thpriate box(es) below.
Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes o ❑ NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No ENA ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ❑_Fo-'❑ NA ❑ NE
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
❑ Yes to ❑ NA
❑ NE
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
❑ Yes ,/ No ❑ NA
❑ NE
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below.
❑ Yes ❑ No ❑ NA
/
❑-IGI✓
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the j ermit or CAWMP?
❑ Yes Ej N/o ❑ NA
❑ NE
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative?
❑ Yes o NA
❑ NE
34. Does the facility require a follow-up visit by the same agency?
❑ Yes o ❑ NA
2
❑ NE
anon' fuse additional naties-as necessarvi
S-e- VV (& tv-� r4z- e, 3 , C , � /
5
_-V V S_ L_C3-� A-_61
f-C
ACCIO'l 8�.
"J [4b. 51Vde s, \�e7
� C0V- J S` B� V-3eS+e—PCQa ra,— , C;.—aV I
Reviewer/Inspector Name:
Reviewer/Inspector Signature:
Page 3 of 3
Phone:VCY
Date:
511112020