Loading...
HomeMy WebLinkAboutNCC240037_Site Plan or Location Map_20240108 �P� �� � Alm.. „q_�.� GROUND STABILIZATION MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION 301 // Btvt °Q.. �i ,,0°' a SITE AREA STABILIZATION �i EXCEPTIONS pP 0 9 �b DESCRIPTION TIME N w • DESC 0 FRAME 41017 c oe`"e • General-AII measures will be inspected and corrections made after runoff producingrainfalls, any or at least once per week minimum.The builder will insure that the construction activities on particular lot do not adverselyaffect an of the installed erosion control measures.If lot construction dictates,measures will be $ PERIMETER DIKES, 7 DAYS NONE relocated on the lot to insu a that the potential for sedimentation runoff is eliminated as much as possible.Silt fences and gravel construction entrances will be maintained as suggested in the erosion control manual.Sodding,seeding and mulching will be maintained to insure proper ground stabilizing cover. i, "YanrO SWALES, DITCHES �� /� 3 use ucross &SLOPES Gravel Construction Entrance-The gravel pad should remain in a condition to prevent mud or sediment from leaving the construction site.This may require periodic topdressing with 2-inch stone.After each rainfall,inspect any structure used to trap sediment and clean it out as necessary. Immediately remove all �o I HIGH QUALITY 7 DAYS NONE objectionable materials spilled,washed,or tracked onto public roadways. $7 .1 WATER ZONES r- (HOW) Silt Fence-Sediment fences should be inspected at least once a week and after each rainfall event.Any repairs should be made immediately. Damaged or decomposed fabric should be replaced promptly.Any sediment deposits that build up against the fence should be removed and disposed of properly to insure 4pO oQ SITE SLOPES STEEPER 7 DAYS IF SLOPES ARE that the removed sediment does not wash back against the fence.Adequate storage volume should be provided for behind the fence at tall times.Take care to not undermine the fence during cleanout operations. .111 THAN 3:1 10'OR LESS IN GeneralErosion ControlNotes LENGTH AND ARE Sodding-The sod should be properly maintained to insure that the grass take holds in the areas being secured.The sod should be watered as necessary to maintain adequate moisture in the root zone and prevent dormancy of the sod.The sod should not be mowed to close,since this could inhibit adequate growth S9fod, 1.Only the areas shown shall be disturbed. and stabilization of the root bed.The sod should be limed and fertilized as per soiltype recommendations and type of grass recommendations when and if possible. ,PR NOT STEEPER 2. All disturbed areas shall be grassed and p YP 9 4G THAN2:1, 14 I �L•o mulched as s as possible and maintained g an g- grassing an g s properly ryas an initial pin sot prepare grassing p germinating prope y. y q> s4,vos DAYS ARE until pemonent cover tablished. Grassing d Mulchin The area to receive d mulching should be ri fertilized and limed as necessary riot step I Lion. Once the has been laced,the area should be maintained as needed to insure that all areas are tin d An bare areas should be � sire ao ALLOWED repaired,and reseeded as soon as possible.If the time of year does not permit the establishment of a permanent grass,then a temporary grassing should be used until the growing season permits the use of a permanent grass. RO V'-' ao - SLOPES 3:1 OR 14 DAYS 7 DAYS FOR V FLATTER SLOPES GREATER Wattles-Wattles shall be inspected after signifcant rainfall events.Rills or gullies upslope of the wattle and any undercutting is to be repaired.Sediment deposits that impair the filtration capability of the wattle shall be removed when the sediment reaches one-third of the wattles functional freeboard height.Removed uucnrO5n B�Rollo oe° THAN 50'IN sediment shall be deposited within the project in such a way that the sediment is not subject to erosion by wind or water. LENGTH NCBIRO PUCE s`'8 a B - ALL OTHER AREAS 14 DAYS NONE(EXCEPT Reinforced Silt Fence Outlet-Remove sediment deposits as necessary to provide adequate storage volume for the next rain to reduce pressure on the fence/outlet.Take care to avoid undermining the fence during cleanout.Remove and replace stone as necessary as it becomes clogged with sediment.Remove all jogI SR NUM a'q - WITH SLOPES FOR PERIMETERS fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been property stabilized. FLATTER THAN 4:1 AND HOW ZONES) ICINITY MAD ( (N.T.S.) ��� t•- -......./ �` J - - - - J 7 i�`-- `�\ 1,,.•� �• J'. ` CONSTRUCTION SCHEDULE -�jr_\•—�..,. - r / ,: {. L..-•' I.Obtain all necessary permits and plan approvals.Erosion and Sediment ContronE&SC)permit and a Certificate of Coverage i 2.„,.. ` - - - - - - - - - - - - - - - - - - // S a (COC)must be obtained before any land disturbing activities occur.A copy of the E&SC permit,the COC and a hard copy of the �� - \pr`` r-� . . I r { \` a r Plan must be kept on site,Preferably inepermits box,and accessible during inspection. - - ` / F •a a. 2.Install gravel concoction entrances first,then silt fences,reinforced silt fence -- ' .® ^-� / 1\-r •a ly r. . 3.Finish clearing and grubbing any necessary areas on the lots as they are started. ———— \ it C . . .1. . . . . . . . I ( -1 i. 1A 4.Begin rut grading and excavation activities ^\ \ l/ _ _ - ' - . . \\i \ / ax t S.Begin or cominue with house conatmetion activities. /// �- \ - - - - - - - - - . - . - . - \�, \ .• e 1 ,, " p� 6,Finish all rough grading and Muse corenuctlon. ' 1 \ J q, `\ -r Imwllarivewan,walks ar,apeoa. / I I / WETLANDS . . . . . . . . . . . . . 4 l�' ,�y r-Th S.Begin fine grading of lot areas 4 l • / j N ` \ 9.Final gassing,mulching and stabilizing of lac In most cases this will involve the installation of sod on the lot.The silt fence will / •l• f-.`a ` `r /I .-.\� l� remain in place until the lm is sodded or grassing is stabilized and takes hold. / �' I ) /, \ ; < \ }• �.a?fp�`J IO.The contractor shall conduct self-inspection ofNe erosion and sedimentation control measures and complete Me fallowing / I _ - _ _ - _ ) ! - - - - - - - - -N- 1 jj I . > ,,pJ JJ combined self-inspection form found on the DENIER website / _ _ _ -y`.... . e _ _ _ _ _ _4_-_V _ /_ _ _ _ _ _ _ _ _ \_ L..r--r �, ,Y' ht ps I/www.detync govlamutnivision.4rnergy-mineral-and-land-resourees/smmrwateesmm,water-program/nedes-conswction-program. / / / I •/ '` \,•' ! HaF Twelve months of complete inspection forms shall he kept an site and available for inspection at all times.It is recommended / / / I - -c"� \' '/- } L copy be kept in a permits box.Ref:G.S.111AG4.1 through G.S.113AG7Sections ISA NCAC 04,0101 through ISA / / / l / \/ - - - - - - .� Tom" - - - - - - - - - /- - - - - - - - - - - - - - -mac - - 1 ,j I / 'tile NCAC 04E.0504 General Permit NCG 010000 NPDES for Cor,atrucOon Activities. i/ / - .j. .-J !. 11.Self-inspections for erosion and sedimentation control measures are to he perforated at least once every seven calendar days and / I I / 13z 1. `� \ �-r lI within24h f very of greater than 1 inch.Any needed repairs shall be mad immediately measures as l\ litikI •]��-•• r-;—/ / des geed All ESC shall be maNtained as specified i thede Nils Ni plan,A gauge shall be installed at the project siN for monitoring. T�(' �C`/'• S) _ 12.Inspection and final acceptance letters Whet the project is complete the per. shall DENIER I tthe PG. �/ , / / I `� l , y i--- Plan Afier OEMER mfoma the permrnee of the project close out,via inspectionNe perm shallvisit I / ay /'�~'-^-' - • "r 'de9navonvc trams Notice of termination(e.NOT).A$100 annual general permit fee will be charged \ / / I tot .�`l\ I' `Y� -.s • • 'a y writhe o-NOT has been filled out t G01'msubmn an electronic WETLANDS .`\ \•. t-r,.r<- L. I I \ // / /�_\ / ` .4.y,� --- pvoo` �,,,�E. , •-f'1 / J A'SELF-INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIREDB BY \ / / / ,� . _ `.:�.-�.Ko - - - - - - - - 4'4 - - - - - - - �� - - - - "/' - - - - - ..oymWt �'�-� I I NCGS 113A-54.1"IS AVAILABLE FOR USE.IT CAN BE COMPLETED Y HAND OR / i / k M� /- - \_ COMPLETED AS AN EXCEL SPREADSHEET. / / / / �w /. ./ / —_ AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED J w l / \\\ \yr lA . . . . . . ./. . '•1' 1 Lr.: /. .a /' EROSION AND / / / \ \\ - "l Ne'\ • - • • - • • • • • • • •//• • /• • • • I.. • • \ SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE PROJECT SITE.RULE 15A 15 T ` ( ,.• t s' NCAC 04B.0131 STATES THAT'...DOCUMENTATION SHALL BE ACCOMPLISHED BY /i�—_,i /' Lot Plan a' / coNL1M1T5T •ory \ \ _ - ./ \--_\ - - - - - - / / - - INITIALING AND DATING EACH MEASURE OR PRACTICE SHOWN ON A COPY OF THE / / „A„ e / \ . . A' . - �' ' .� -�` - APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR BY COMPLETING, J - - - '- 1111M1111111111111117m DATING AND SIGNING AN INSPECTION REPORT THAT LISTS EACH MEASURE, L ii/ / / 16 \_ v _ _ _ _ _/_ _ _ _ _ \- _ _ _ _ / _ _ PRACTICE OR DEVICE SHOWN ON THE APPROVED EROSION AND SEDIMENTATION // �—R 4_ CONSTRUCTION---- .,"""•. .�� �\ / CONTROL PLAN." / \ tat l '{ /A /---- / %P y Lot n — as \�� wF`rvos soh Po ) i >r'- �''\ /'- ``�--'r•,/:e / �'F" "I;s ION j 1 C. �"� Gee +._.^ .. 5- 3 SODDING m, 12 / N / � yin a � I to ) 1 .N Lot Elan / / /-.-M� l //�� / , TIGHTLY AGAINST EA.OTHER \ .wE ."-- Ir,a / tiPATTERN.BUTT THE STRIPS PEROT LEAVE SPACES MEM i( / .R. 2de (II ,,,,, NOT OVERLAP.A SHARPENED 13 Lot Plan c$'r/ UO / / 18 ` \ ,-- r5;/�.r r k rNns.Nnrna,M NmPrmEa. „E„ z/ L Lot Plan Z� 21 `\ �\ . . . . . . -'t�r1 {� AII U-ANGLED ENOS / Lot Plan — --- 2 / �t "� / \./ • // Lo19t an -N. / „A„&„Eii \ \;`26 27 28 29 -. .r /' ✓,/ r III „E err KeF,4 20 \\ r'// / CONSTRUCTION er gh / / LIMITS � 1p11 Lg \ Lot Elan 25 \\\ / i-y, �4 �u 30 ^v�\ ,f lit � llti M III 1 LII tt Dn` � �soTMIE '` 7 140 \ . wiT„ A`T Ira ROLL SOH IMMPOLENELE TO con P. ISp — 38-- Assoory ns r„r soo LIMITS 24 wrTres.srrms Mo �� A EAN• �/ E xr APPEARAp sv3„eawaaa,.<alm \ f T„EsoL. 10 \ ' \N. \ 23 J �' / MabOn CO 2_o "A�s sAs MENU f NCE OF GOOD SOD / Lot Plan 9 \ Lei — ___ 00 / " Lot Plan \ \ 22 — 1 w� "A & B A &t R ` 8 \ \\\ f / ummIEASEMEN rj ���-_ / 8 o/ `Lot Plan \ \ \ , / s f „m„n - /z / C,A„&„8„ 7 \ \\ \ 34 / // / ` / r v arrn„�r„era ear a o� / / Lot AIaR,. 6 \ /� 35 / 33// 32 31 dig // �� �`j Ma ra oe„sea mr J \Lot Plan / 1 ig ",,H �-- a�' 'Z7 —� \ I "Bit \ / l Lot Plan CONSTRUCTION a o° \ II \ 36 C N „D„ lSt/ r \ p0�\ ( 37 Lot Plan CONSTRUCTION • ' ` \�../, / \ \ \\ LIMITS CONSTRUCTION E coN�IMusnoN ,ti�13s / / \ ,fr. Qjtr rj // \\ Lotr� \\ \\ I I 'fir/ '// �� , or CONSTRUCTION • \ \ Lot Plan / 4 ^ao.. \ „F„ �' CONSTRUCTION" �aDN r — ' c /, i uMITs " I , , 39 ; '' -' :-;�:�' r I 1 PAGE 1 of 2 RE°w�a �'' `36—— r 1 TRACT A urvolsTURBED I, LOT 32 TO \! ) TRACTS SPACE ./ ''`� %�;--`'' TOTAL DISTURBED ACREAGE: 21.13 ACRES �I 3 I ——fi_oR31NgcE�A€MErvT ' FUTURE ' / ate_,j'..a �1 /.. /'� \ LotAlan \...._. ) % 40_ IV DEVELOPMENT , ,'i/r �. r /' \ 1 LOT EROSION CONTROL PLAN AT n /' 1 \ / Lot Plan / f , • '�� l e''/, V LOTS 1-3, 5-10, 12-15, 18-21, 32, 36, 38 & 40-42 / ` \� / N A „A„ / TRACT.0 f�, / \ I N / \ O'' /S DEVELP�PMENT �✓/2 i /.� \ �� 2_ WILLIFORD COVE 2 Uzi �1B it 41 CONS U TION / FJ� Lot Plan( Ts ' A \\`� / CONSTRUCTION / LotAlan A,&„B„� ) 1 7LI 1 FOR-- LIMITS 42 DREAM FINDERS HOMES, LLC <i•--����� I Lot Plan / \ I I P° t/" \ EASTOVER TOWNSHIP CUMBERLAND COUNTY \\\ �` Lot Plan 0Pe- 4.-------- 1 SCALE:1"=120' GRAPHIC SCALE NOVEMBER 2023 I ` �' o RGad 5R' S3? J ()/ zO �o zoo so N - 1 Q` 11}` ,I (IN TEST) l\�+ 1 inch = t20 fL 11 -161 / \ MOORMAN,KIZER&REITZEL,INC.115 BROADFOOT AVE.FAYETTEVILLE,N.C.28305 / t PHONE(910)484-5191 FAX(910)484-0388 LICENSE 4F-0106 LAST SAVED:11/27/2023 12:01 PIA LAST PLOTTED:11/27/2023 1:40 PM PLOTTED BY.Dennis Gilbert FILENAME:0\CURRENT JOBS\H&H CONSTRUCTORS\23-136J-04 WILLIFORD COVE-EC\PLANS\WILLIFORD COVE EC-LOTS 1-3.3-10.12-15.16-21.32.36.3Bh40-42.DW0