Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
310459_Compliance Evaluation Inspection_20230623
Div,`ision of Water Oes"ources Facility Number , 0 Division of Soil .arid Water•Conservation� O.'Other°Agency Type of Visit: ® Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: 0 Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time: Departure Time: County: Farm Name: SQ rQ. 1�'C' yq— -s- Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Title: Phone: Onsite Representative: _r-1 G\ ,,-q Integrator: Certified Operator: Back-up Operator: Location of Farm: Latitude: Phone: Certification Number: Certification Number: Longitude: Region: . D.esign8 " Current` - Design Current ° : -Design Gui rent e `Swine ` ` z, CapaeYty : Pop.' Wet Poultry ' . CapacityPop.° Cattle. ° ` Capacity Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Layer Non -Layer Design 'Current _Dry Poultry Capacity Pon. ` Layers Non -Layers Pullets Turkeys Turkey Poults Other Da' Cow Dairy Calf Dairy Heifer D Cow Non -Dairy Beef Stocker Beef Feeder B fC ee Broodow Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes ❑� ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No © fA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes ❑ No ❑� ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes ❑ No 04-A ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes NA �Noo ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes NA El NE of the State other than from a discharge? Page 1 of 3 511212020 Continued Facility Number: ,11 - Date of Inspection: �3-71 Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes a. If yes, is waste level into the structural freeboard? ❑ Yes Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Identifier: S \ S 1- Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? (i.e., large trees, severe erosion, seepage, etc.) [].,Nro'❑NA ❑NE ❑ No �IA ❑ NE Structure 6 ❑ Yes ©'No ❑ NA ❑ NE 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes �10 ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes 2No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes 131V ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes [ o ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. [:]Yes E NXo ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes o ❑ NA ❑ NE 15. Does .the receiving crop and/or land application site need improvement? ❑ Yes6-No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes E�4o ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes E�Xo ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ❑<o ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes ❑ N ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. [:]Yes ❑] ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes No/ ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? [:]Yes 54 ❑ NA ❑ NE Page 2 of 3 511212020 Continued Facility Number: -Ck NCj Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes [2'1<lo ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes to ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes [] N ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No Ea - A ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: ❑ Yes ❑'go ❑ NA ❑ NE ❑ Yes L_A o ❑ NA ❑ NE ❑ Yes E2 o ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA [ 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes E5N o ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes [ Io ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ NA ❑ NE MCV11ZwniiuibYcA,wi ivaiuc. Reviewer/Inspector Signature: Page 3 of 3 Date 6 -Zt-? Z3 511212020