HomeMy WebLinkAboutNCC240009_Email RE Construction SW COC_20240106 Georgoulias, Bethany
From: lase rfiche.ncdenr.gov@mccicloud.io
Sent: Saturday, January 6, 2024 11:33 AM
To: anh.nguyen@vinfastauto.com
Cc: Holloman, Tevye L; Georgoulias, Bethany; Michael.Hicks@vinfastauto.com;
scott.kurz@wsp.com
Subject: [External] Construction Stormwater General Permit Coverage
Attachments: Certificate of Coverage.pdf
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Dear Construction General Permit Permittee:
You have been granted coverage under North Carolina's NPDES General Stormwater Permit for Construction Activities.
Your Certificate of Coverage (COC) number is NCC240009, and your COC is attached.
This COC has been issued for Project Blue VinFast Phase 113 US EV Manufacturing Facility in Chatham County, in response
to the Notice of Intent (NOI) application submitted on 1/2/2024.
You are required to follow the conditions of the NCG010000 General Permit(or NCG250000 General Permit, if
applicable)for the duration of your construction activity. You will be covered by this COC until you submit an electronic
Notice of Termination (eNOT), provided you remain current with your annual permit fees.
Remember, you must submit the ORIGINAL SIGNED NOI CERTIFICATION FORM that was uploaded to the eNCI to the
Stormwater Program at the address on that form.The original signed NOI Certification Form is required to fulfill federal
application requirements.
If you have any questions, please contact the Stormwater Program at(919) 707-3640, or visit https://deg.nc.gov/NCG01.
The NC DEMLR Stormwater Program
512 N. Salisbury Street, Archdale Building 6th Floor, 1612 Mail Service Center, Raleigh, NC 27699-1612
ARPA grant funding indicated? No
ARPA Project No.(if applicable):
This email was automatically generated by Laserfiche. Please do not respond to this email address, as responses are not
monitored.
i
Certificate of Coverage
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF ENERGY, MINERAL,AND LAND RESOURCES
GENERAL PERMIT NO. NCG010000
NC Reference No. NCG01-2024-0009
Certificate of Coverage No. NCC240009
STORMWATER DISCHARGES
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1,other lawful standards and regulations
promulgated and adopted by the North Carolina Environmental Management Commission,and the Federal Water
Pollution Control Act,as amended,
VinFast Manufacturing US, LLC
is hereby authorized to discharge stormwater associated with CONSTRUCTION ACTIVITIES to surface waters of North
Carolina from a site located at:
Project Blue VinFast Phase 1 B US EV Manufacturing Facility
Moncure-Flatwood Road
Cape Fear Township
Chatham County
in accordance with the effluent limitations, monitoring requirements,and other conditions set forth in N.C.General Permit
No. NCG010000.
This Certificate of Coverage is affiliated with E&SC Plan Project No. CHATH-2023-019
This Certificate of Coverage shall become effective 1/5/2024.
This Certificate of Coverage shall remain in effect until rescinded or expired.
This Certificate of Coverage will expire on the anniversary of its effective date unless it is renewed by payment of the
annual administration and compliance fee.
f
William E.Vinson,Jr., PE, CPESC, CPM, Interim Director
Division of Energy, Mineral,and Land Resources
By the Authority of the Environmental Management Commission