HomeMy WebLinkAboutNC0025879_2022 SPAR_20231127L Svstem Pertormonce Annuol Report 2022 General Informution: Facility Name- Town Of Robbinsville Sewage System 6 Knight Street Robbinsville, NC 28771 Town Of Robbinsville Wastewater Treatment Plant (WWTP) 197 Sandhole Road Robbinsville NC,28771 o NPDES Permit #NC0025879 r Lime Stabilization Permit #WQ0039348 e Collection System Permit #WQCS00158 Descriptian Of Facilities A. Collection System The Town of Robbinsville service area covers approximately 17 miles. The Town provides service to areas from Tallulah to Tapoco Road. The entire l7-mile system is gravity fed to the lift station at 6 Knight street. There are two Pump station's within the collection system and there is approximately 306 MH's system wide, The Torms collection system is considered fairly new. Most of the lines have been replaced with ductile iron pipe (DIP)or polyvinyl chloride (PVC). There are very few terracotta lines left within the system. Pipe size ranges from 4 inches to 8 inches. There are approximately 554 sewer customers. B. Wastewater Treatment Plant (WWTP) The present wastewater treatment plant (WWTP) is a .630 million gallons per day (MGD) Extended aeration of secondary treatment plant serving the Town of Robbinsville and the county overall the town services approximately 554 sewer customers. Ln2022 the facility treated an average daily flow of 292,637 gallons per day. The plant consists of a step-bar screen with a screw conveyor for preliminary treatment. First and second stage aeration basins along with a circular clarifier for secondary treatment. Disinfection is done by UV eflluent. Residuals are held in two 75,000 gallon aerobic II. Alderman Debbie Beasley 828- 73s-0498 Alderman Kenneth Hyde 828-735-9594 Alderman Vacant Mayor Shaun Adams 828-73s-9382 Public Works Director Chadd Carpenter (ORC) CS 828-73s-01 80 Wastewater Treatment Plant Operator Lamar Williams (ORC) WWTP 828-735-0809 Public Works C-surface water Operator Eddie Sharpe ( BORC) CS 828-73s-0085 Permit Numbers: ilL U. digesters until dewatering is completed by a .75 meter belt press. Dewatered sludge is then stabilized by using alkaline stabilization and heat treatment process. The WWTP produced approximately 200 ton ofdewatered sludge in 2022. Performsnce measures A. Collection svstem r The Tovm ofRobbinsville preventative maintenance program consist ofhigh-pressurejetting and visual inspection. This year 17;330 lineal feet of pipe was cleaned and inspected; this is approximately 19.3o/o of the sewer system. o Maintenance crew inspected system and aerial lines every rainfall. Inspected system twice annually maintenance keeps a log of all sewer cleanings and aerials every time they are cleaned and inspected. o The collection system recorded I reportable sanitary sewer overflow (SSO) in 2022. B. lYastewater treatment plant (WWTP) o The wastewater treatment plant had no Notice of Violation (NOV) that exceeded the permitted flow of the plant. The wastewater treatment plant (WWTP) continues to provide effective/ efficient treatment services to the community averaging BOD and TSS removal efficiencies well above the NCDENR and EPA requirements. Flow to the wastewater treatment plant is below capacity for the plant with an average flow 292,637 gallons per day in2022 Increased customers and well above average rainfall were major contributors to increased flows. The wastewater treatment plant remained in compliance for all permitted parameters. Certilication I certify under penalty of law that this report is complete and accurate to the best of my knowledge. I further certify that this report has been made available to the users and customers ofthe Town of Robbinsville sewer system. 1l- z1^tg Chadd Carpenter, ORC Public Works Director Town of Robbinsville Date fi"o&J eo^,*r,,tLr