HomeMy WebLinkAboutNC0039152_Compliance Evaluation Inspection_20231205
SENT VIA ELECTRONIC MAIL ONLY: NO HARD COPY WILL BE MAILED.
December 5, 2023
Nelson Webb, Maintenance Facilities Manager
Ohio Electric Motors Inc.
Email: nwebb@ohioelectricmotors.com
SUBJECT: Compliance Inspection Report
Ohio Electric Motors WWTP
NPDES WW Permit No. NC0039152
Buncombe County
Dear Permittee:
The North Carolina Division of Water Resources conducted an inspection of the Ohio Electric Motors
WWTP on 11/16/2023. This inspection was conducted to verify that the facility is operating in
compliance with the conditions and limitations specified in NPDES WW Permit No. NC0039152. The
findings and comments noted during this inspection are provided in the enclosed copy of the inspection
report entitled "Compliance Inspection Report".
There were no significant issues or findings noted during the inspection and therefore, a response to this
inspection report is not required.
If you should have any questions, please do not hesitate to contact me at 828-296-4667 or via email at
lauren.armeni@deq.nc.gov.
Sincerely,
Lauren Armeni, Environmental Specialist II
Water Quality Regional Operations Section
Asheville Regional Office
Division of Water Resources, NCDEQ
ATTACHMENTS: Inspection Report
Ec: Bob Barr (ORC, RPB Systems)
DocuSign Envelope ID: 98DE5DD5-F20B-444F-A3A2-EA4762EE189E
EPA
United States Environmental Protection Agency
Washington, D.C. 20460
Water Compliance Inspection Report
Form Approved.
OMB No. 2040-0057
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 N 52 NC0039152 23/11/16 C S31112171819 20
21 66
Inspection Work Days Facility Self-Monitoring Evaluation Rating B1 QA ----------------------Reserved-------------------
N67707172 73 74 75 80
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
POTW name and NPDES permit Number)
Ohio Electric Motors WWTP
30 Paint Fork Rd
Barnardsville NC 28709
Entry Time/Date Permit Effective Date
Exit Time/Date Permit Expiration Date
10:00AM 23/11/16 20/11/01
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
///
Robert P Barr/ORC/828-251-1900/
Other Facility Data
11:30AM 23/11/16 25/09/30
Name, Address of Responsible Official/Title/Phone and Fax Number
Mark Eatmon,30 Paint Fork Rd Barnardsville NC 28709//828-626-2901/8286262155 Contacted
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit Flow Measurement Operations & Maintenance Records/Reports
Self-Monitoring Program Facility Site Review Effluent/Receiving Waters
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s)Agency/Office/Phone and Fax Numbers Date
Lauren E Armeni DWR/ARO WQ/828-296-4500/
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page#1
DocuSign Envelope ID: 98DE5DD5-F20B-444F-A3A2-EA4762EE189E
12/5/2023
12/5/2023
NPDES yr/mo/day
23/11/16
Inspection Type
C3111218
1
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
Lauren Armeni, with the Asheville Regional Office, conducted a Compliance Evaluation Inspection of
the Ohio Electric Motors WWTP on November 16, 2023. This inspection was conducted to determine
whether the facility is being operated and maintained in compliance with NPDES Permit No.
NC0039152. Bob Barr (ORC, RPB Systems) and Nelson Webb (Maintenance Facilities Manager)
were present and assisted in the inspection.
The following items were noted during the inspection:
Recordkeeping: The ORC logs indicated that there was no flow for Outfall 002 on the months that
sampling was not required. Mr. Webb indicated that there is continuous flow at Outfall 002, so that
part of the log can be left blank if not sampling that month. Additionally, the eDMRs indicated no flow
for Outfall 002 during the months that sampling was not required. Continue to add the Outfall 002
page in the eDMR, but leave it blank instead of putting "no flow".
Sand Filter: The previous inspection indicated that the cleanout/access pipes along the distribution
lines were not secured and could allow dirt and storm water to get into the system. At the time of the
inspection, the pipes were secured and cleanout caps were installed.
NC0039152 17 (Cont.)
Page#2
DocuSign Envelope ID: 98DE5DD5-F20B-444F-A3A2-EA4762EE189E
Permit:NC0039152
Inspection Date:11/16/2023
Owner - Facility:
Inspection Type:
Ohio Electric Motors WWTP
Compliance Evaluation
Permit Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new
application?
Is the facility as described in the permit?
# Are there any special conditions for the permit?
Is access to the plant site restricted to the general public?
Is the inspector granted access to all areas for inspection?
Comment:
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping?
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable
Solids, pH, DO, Sludge Judge, and other that are applicable?
Overall, the facility is well-maintained and has a septic system and underground sand
filter, so no process controls are used. Mr. Webb indicated that he checks the system
Monday through Friday.
Comment:
Record Keeping Yes No NA NE
Are records kept and maintained as required by the permit?
Is all required information readily available, complete and current?
Are all records maintained for 3 years (lab. reg. required 5 years)?
Are analytical results consistent with data reported on DMRs?
Is the chain-of-custody complete?
Dates, times and location of sampling
Name of individual performing the sampling
Results of analysis and calibration
Dates of analysis
Name of person performing analyses
Transported COCs
Are DMRs complete: do they include all permit parameters?
Has the facility submitted its annual compliance report to users and DWQ?
(If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified
operator on each shift?
Is the ORC visitation log available and current?
Is the ORC certified at grade equal to or higher than the facility classification?
Page#3
DocuSign Envelope ID: 98DE5DD5-F20B-444F-A3A2-EA4762EE189E
Permit:NC0039152
Inspection Date:11/16/2023
Owner - Facility:
Inspection Type:
Ohio Electric Motors WWTP
Compliance Evaluation
Record Keeping Yes No NA NE
Is the backup operator certified at one grade less or greater than the facility
classification?
Is a copy of the current NPDES permit available on site?
Facility has copy of previous year's Annual Report on file for review?
There were no issues for laboratory data and eDMRs for Outfall 001. For months
where samples were not collected for Outfall 002 (only semi-annual sampling required),
"NOFLOW" was selected on the eDMRs. Mr. Webb indicated that there is continuous
flow for Outfall 002, so in the future include the Outfall 002 page, but do not select
"NOFLOW". See summary for details.
Comment:
Septic Tank Yes No NA NE
(If pumps are used) Is an audible and visual alarm operational?
Is septic tank pumped on a schedule?
Are pumps or syphons operating properly?
Are high and low water alarms operating properly?
The septic tank is pumped every other year by Carter Septic Service. The septic tank
and gray water tank were last pumped on September 13, 2022.
Comment:
Sand Filters (Low rate)Yes No NA NE
(If pumps are used) Is an audible and visible alarm Present and operational?
Is the distribution box level and watertight?
Is sand filter free of ponding?
Is the sand filter effluent re-circulated at a valid ratio?
# Is the sand filter surface free of algae or excessive vegetation?
# Is the sand filter effluent re-circulated at a valid ratio? (Approximately 3 to 1)
This is a buried sand filter system. See summary for details.Comment:
Disinfection-Tablet Yes No NA NE
Are tablet chlorinators operational?
Are the tablets the proper size and type?
Number of tubes in use?1
Is the level of chlorine residual acceptable?
Is the contact chamber free of growth, or sludge buildup?
Is there chlorine residual prior to de-chlorination?
Comment:
Page#4
DocuSign Envelope ID: 98DE5DD5-F20B-444F-A3A2-EA4762EE189E
Permit:NC0039152
Inspection Date:11/16/2023
Owner - Facility:
Inspection Type:
Ohio Electric Motors WWTP
Compliance Evaluation
De-chlorination Yes No NA NE
Type of system ?Tablet
Is the feed ratio proportional to chlorine amount (1 to 1)?
Is storage appropriate for cylinders?
# Is de-chlorination substance stored away from chlorine containers?
Comment:
Are the tablets the proper size and type?
Are tablet de-chlorinators operational?
Number of tubes in use?1
Since only one chlorination tube is being used, only one dechlorination tube needs to
be used. The dechlorination tubes are still in a confined space. As noted in the last
report, the sand bags are still there, but Mr. Nelson indicated he believes it helps with
dispersing the dechlorination tablets throughout the effluent.
Comment:
Flow Measurement - Effluent Yes No NA NE
# Is flow meter used for reporting?
Is flow meter calibrated annually?
Is the flow meter operational?
(If units are separated) Does the chart recorder match the flow meter?
Effluent flow is measured with a bucket and timer.Comment:
Effluent Pipe Yes No NA NE
Is right of way to the outfall properly maintained?
Are the receiving water free of foam other than trace amounts and other debris?
If effluent (diffuser pipes are required) are they operating properly?
There is no longer green residue at the effluent pipe because dechlorination was
reduced from two tubes to one.
Comment:
Effluent Sampling Yes No NA NE
Is composite sampling flow proportional?
Is sample collected below all treatment units?
Is proper volume collected?
Is the tubing clean?
# Is proper temperature set for sample storage (kept at less than or equal to 6.0
degrees Celsius)?
Page#5
DocuSign Envelope ID: 98DE5DD5-F20B-444F-A3A2-EA4762EE189E
Permit:NC0039152
Inspection Date:11/16/2023
Owner - Facility:
Inspection Type:
Ohio Electric Motors WWTP
Compliance Evaluation
Effluent Sampling Yes No NA NE
Is the facility sampling performed as required by the permit (frequency, sampling type
representative)?
There are two outfalls at this facility - Outfall 001 for the effluent from the WWTP and
Outfall 002 for the effluent from the non-contact cooling water within the facility. The
permit requires grab samples only for both outfalls.
Comment:
Page#6
DocuSign Envelope ID: 98DE5DD5-F20B-444F-A3A2-EA4762EE189E