Loading...
HomeMy WebLinkAbout310595_Compliance Evaluation Inspection_20231121�a �-V151011 O WeY RBS�IIrCeS i a a r .. ac�#ynbe i 5 t'1 J� Divron of Soak and Water �4nev�nn : g 0 FUt`ller Agency � � °, B 'ype of Visit: ® Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical.Assistance season for Visit: ® Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time: FEj—j� Departure Time: o County: Region: Farm Name: c;ame � i �( csI- G.S ✓°^ Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: ��. ,.,� i 4V—L" Title: Phone: mil © S'CA ® t "I q Onsite Representative: Integrator: Certified Operator: Certification Number: Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: DeS1gI1 Deli n Currenl Cup g �Deslgn Current reirt °'+tp Poi Capacity�op Wet Poultry Gapacty Cattle r Capacity Attie Layer Dairy Cow Y; Wean to Finish Wean to Feeder Non Layer Dairy Calf Feeder to Finish t)� . Dairy Heifer, s 'Design Cori ent Dry Cow Farrow to Wean ,t . Farrow to Feeder �r mP.oultry Caacjity . .'8 Non -Dairy �f Layers a Beef Stocker Farrow to Finish Gilts Non -Layers Beef Feeder 4 Pullets Beef Brood Cow Boars Turkeys fiber a Turkey Pouetszt; -� �.; v Other Discharges ,and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes 2rNo ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? []Yes []No NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes ❑ No E NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes ❑ No NA NA ❑ NE ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes o 7N0 ❑ 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes ❑ NA ❑ NE of the State other than from a discharge? 511212020 Continued Page I of 3 Facility Number: - v Date of inspection: i1 T 23 Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes a. If yes, is waste level into the structural freeboard? ❑ Yes Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Identifier: 1 L No ❑7NA' ❑ NE ❑ No ❑ NE Structure 6 Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes �NoD ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? [:]Yes EKNo ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? [:]Yes ❑<o ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes [J'No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes [ No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes Ea No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yeso ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes ] No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes 4�0 ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ❑ No 0 NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes ❑ No ❑ NA Zr E 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes ❑ No ❑ NA ❑iIQE the appropriate box. ❑WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes DrNo ❑ NA - E ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facilityfail to install and maintain a rain gauge? ❑ Yes ❑ No ❑ NA 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA 2 XNE Page 2 of 3 511212020 Continued Facility Number: t i - j Date of Inspection: i z, 1 --L 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ❑ No ❑ NA ZNE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes ❑ No ❑ NA �TE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? [:]Yes [:]No ❑ N 2<E 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document [:]Yes ❑ No A ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? [:]Yes to ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 'f:!�NE 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes 5 No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ NA ��No ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ NA ❑ NE Reviewer/Inspector Signature: Page 3 of 3 Date: 11 1 k 5 /202