HomeMy WebLinkAboutNCC233827_ESC Approval Submitted_20240105 Calton, Andrew
From: SVC_DoNotReply-DEQPermits <DoNotReply-DEQPermits@deq.nc.gov>
Sent: Tuesday, November 7, 2023 4:14 PM
To: Duke Energy Carolinas, LLC; Calton, Andrew
Subject: NC DEMLR - FROF Application Approval with Modifications CRM:0170004
Attachments: DAVID-2024-0101_Nucor 100 kV_A-M.pdf
You don't often get email from donotreply-degpermits@deq.nc.gov.Learn why this is important
CAUTION: [EXTERNAL] This email originated from outside of the organization. Do not click links or open attachments
unless you recognize the sender and know the content is safe.
North Carolina Department of Environmental Quality
Division of Energy, Mineral & Land Resources
Land Quality Section
Roy Cooper
Governor
Elizabeth S. Biser
Secretary
William Vinson Jr. (Acting)
Director
11-07-2023
Duke Energy Carolinas, LLC
525 Tryon Street
Charlotte, North Carolina 28202
RE: Project Name: Nucor 100 kV Greenfield Transmission Project
Acres Approved:21.04 Acres
Application ID: PA-001197
Permit Number: DAVID-2024-0101
Address: NC Highway 109
City: Denton
County: Davidson
River Basin:Yadkin-Pee Dee
Stream Classification:WS-IV
Plan Type: New Plan
1
Dear Duke Energy Carolinas, LLC,
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with
modifications and hereby issue this Letter of Approval with Modifications. The Modifications Required for Approval are
listed on the attached page.The Certificate of Approval must be posted at the job site. This plan approval shall expire
three (3) years following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title
15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent(eNOI)
form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit.After the form is
reviewed and found to be complete, you will receive a link with payment instructions for the $120 annual permit fee. After
the fee is processed, you will receive the COC via email.As the Financially Responsible Party shown on the FRO form
submitted for this project,you MUST obtain the COC prior to commencement of any land disturbing activity.The eNOl form
may be accessed atdeq.nc.gov/NCG01. Please direct questions about theeNOlform totheStormwater Program staff in the
Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a
newCOC.
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job
site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with
the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural
resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation
control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina
General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to
insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws,
regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing
activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility/Ownership Form, which you provided. You are requested to file an amended form if there is any change in
the information included on the form. This permit allows for a land-disturbance, as called for on the application and plan,
not to exceed the approved acres. Exceeding the acreage can be a violation of this permit and may require a revised plan
and additional application fee. In addition, it would be helpful if you notify this office of the proposed starting date for this
project.
General Comments:
1. Please notify this office prior to your pre-construction conference for this project by calling (336) 776-9800 and asking
to speak with the Land Quality inspector for your county. Permission must be obtained and granted from NC DEQ DEMLR
prior to the removal of any ESC measures. [GS 113A-51, 15A NCAC 4B .0120]
2.Any off-site borrow and waste required for this project must come from a site with an approved erosion control plan, a
2
site regulated under the Mining Act of 1971, or a landfill regulated by the Division of Solid Waste
Management. Trash/debris from demolition activities or generated by any activities on site must be disposed of at a
facility regulated by the Division of Solid Waste Management or per Division of Solid Waste Management or Division of
Water Resources rules and regulations. [15A NCAC 4B .0110]
3.Additional measures may be required -The applicant is responsible for the control of sediment on-site. If the approved
erosion and sedimentation control measures prove insufficient, the applicant must take those additional steps necessary
to stop sediment from leaving this site. [15A NCAC 4B .0115]
4.The NCG01 has a $120 yearly fee and our office often receives closure inspection requests days prior to yearly NCG01
fee payment due dates. Be advised the project requires a closure inspection report by DEMLR prior to filing the Notice of
Termination (NOT) to terminate NCG01 coverage. The closure inspection should not be requested until after the site has
achieved full vegetative stabilization and measures have been removed. The removal of temporary ESC measures,
including basins, requires prior approval. Often, a full growing season is necessary between initial seeding/mulching and
removal of measures. Please plan your construction accordingly to avoid contacting our office prematurely for a closure
inspection. Also be advised you may be asked for representative site pictures prior to a closure inspection. [General
Comment]
Your cooperation is appreciated.
Sincerely,
Nicole Chiles, El, Assistant Regional Engineer
North Carolina Department of Environmental Quality
Division of Energy, Mineral & Land Resources
Winston-Salem Regional Office
Land Quality Section
Enclosures: Certificate of Approval
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Winston-Salem Regional Office 1450 West Hanes Mill Road, Suite 300 I Winston-Salem NC, 27105
u
- 336-776-9800
Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized
state official.
3
CERTIFICATE OF PLAN APPROVAL
,, .STATE'..
a.
%i,� MpY ID.177J f�J.,1
Y / s/�j11
DW I , , = r y�i
1� i. a i
1111 - I Nt1 h�i
`h,\'.t QUAM V W
The posting of this certificate certifies that an erosion and sedimentation control plan has
been approved for this project by the North Carolina Department of Environmental
Quality in accordance with North Carolina General Statute 113A — 57 (4) and 113A — 54 (d)
(4) and North Carolina Administrative Code, Title 15A, Chapter 4B.0107 (c). This certificate
must be posted at the primary entrance of the job site before construction begins and until
establishment of permanent groundcover as required by North Carolina Administrative
Code, Title 15A, Chapter 4B.0127 (b).
Nucor 100 kV Greenfield Transmission Project, NC Highway 109 Denton, NC 27239,
DAVID-2024-0101
November 7, 2023 Project Name and Location
Date of Plan Approval IV Cc i ChdE4'
NCGO1 Certificate of Coverage #
D E Q
� Nicole Chiles, EI
��, Assistant Regional Engineer