Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
310347_Compliance Evaluation Inspection_20231220
Type of Visit: (3 Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: (3 Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time: Departure Time: 1)i-tJ County: Farm Name: .4 'Fa v- Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: To c— lV CAStn-% Title: Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: Latitude: Region: Phone: C?Lct ZrLl JJ Integrator: Certification Number: Certification Number: 1 l Longitude: -_ 'me ` ' Design Current' Desagu Currenst�... 7LDeslgn Curront �` Swine riy 'Cdpac,Pop Wet Poultry Capacity i�p Cattle', = Capacity "Pop Wean to Finish Layer Wean to Feeder Non Layer Feeder to Finish - �y 2 - _ WE Farrow to Wean Designure Farrow to Feeder I)ry 1Pouiry, Ca aciop ;, t Farrow to Finish , „ , Layers -° ' Gilts Non -Layers - Boars Pullets : Turkeys x :. -a Offer NE TurkeyPoults �� Others uP Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes ❑ No �NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the'discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes ❑ No NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes o ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes No ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 5/12/2020 Continued Facility Number: - Date of Inspection: i Z Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes a. If yes, is waste level into the structural freeboard? ❑ Yes Structure 1 Identifier: U Spillway?: Designed Freeboard (in): Observed Freeboard (in):� Structure 2 Structure 3 Structure 4 Structure 5 5. Are there any immediate threats to the integrity of any of the structures observed? (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? Ej o ❑ NA ❑ NE ❑ No E[XAE] NE Structure 6 ❑ Yes o ❑ NA ❑ NE ❑ Yes o ❑ NA ❑ NE 1 If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes �10 ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes E'1 ' ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes U140 ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes © No ❑ NA 0 NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes Ej No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable 0 Yes , <0 ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? 18. Is there a lack of operating waste application equipment? ❑ Yes ❑ Yes Q, �o ❑ NA ❑ NA ❑ NE ❑ NE properly Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes E3 No ❑ NA ❑ NE'-,, 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes Io ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑Design ❑Maps ❑LeaseAgreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes No �7NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NE Page 2 of 3 511212020 Continued Facility Number: - Date of Inspection: L -zoo Zt3 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes [/�No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes E��o❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No �ZEJ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ❑ .PK ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes E-1,Nd/ ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the [:]Yes 0/No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA 01V� ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes R No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑/ NNo ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes EJ/N o ❑ NA ❑ NE Reviewer/Inspector Signature: Date: 12, 710 Z Page 3 of 3 511212020