Loading...
HomeMy WebLinkAbout20231154 Ver 1_More Info Received_20240104Staff Review Does this application have all the attachments needed to accept it into the review process?* Yes No ID#* Version* 1 20231154 Does this project involve maintenance dredging funded by the Shallow Draft Navigation Channel Dredging and Aquatic Weed Fund or involve the distribution or transmission of energy or fuel, including natural gas, diesel, petroleum, or electricity?* Yes No Is this project a public transportation project?* Yes No Reviewer List: * Joseph Myers:joseph.myers Select Reviewing Office: * Raleigh Regional Office - (919) 791-4200 Does this project require a request for payment to be sent? Yes No Project Submittal Form Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Project Type: * For the Record Only (Courtesy Copy) New Project Modification/New Project with Existing ID More Information Response Other Agency Comments Pre -Application Submittal Re-Issuance\Renewal Request Stream or Buffer Appeal Is this supplemental information that needs to be sent to the Corps?* Yes No Project Contact Information ........................................... Name: Adam Pollak Who is submitting the information? Email Address: adam.pollak@duke-energy.com Project Information Existing ID #: Existing Version: 20231154 1 20170001(no dashes) 1 Project Name: PNG- Roseburg Lumber Is this a public transportation project? Yes No Is the project located within a NC DCM Area of Environmental Concern (AEC)? Yes No Unknown Is this project connected with ARPA funding? Yes No County (ies) Halifax Please upload all files that need to be submited. Click the upload button or drag and drop files here to attach document SAW-2023-01051 PCN Rev 4 Jan 24.pdf 397.45KB Only pdf or kmz files are accepted. Describe the attachments or comments: Mr. Anthony Scarbraugh, USACE, requested that the Pre -Construction Notification (PCN) be revised and submitted for the subject project. The original PCN was submitted on August 16, 2023. Meetings between Piedmont Natural Gas, Roseburg Lumber, the Roanoke Trail Canal Commission, and the Roanoke Rapids Sanitary Sewer District have resulted in the natural gas pipeline re -alignment since the original PCN. The re- alignment has revised both the open -cut and horizontal directional drill (HDD) portions of the project which resulted in changes to the stream and wetland impacts. Sign and Submit By checking the box and signing box below, I certify that: • I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief. • I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I agree that submission of this online form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the online form. Signature: Ada* Pollak Submittal Date: 1/4/2024 Is filled in automatically.