Loading...
HomeMy WebLinkAboutSW3230901_Response To Comments_20240104 EAGLE ENGINEERING Creating Communities. Together. January 3, 2024 NCDEQ POST-CONSTRUCTION STORMWATER RE: Baylor Grove 7312 Pageland Highway NCDEQ Project#SW3230901 We are in receipt of your Pt review comments for Baylor Grove, located on Pageland Highway in Union County,NC. Please find responses to the requested information below. STORMWATER COMMENTS Contact:Brianna Holland 1) Determination SAW2023-01529 is sufficient for documentation of wetland determination. Per 15A NCAC 02H .1017 (10), surface water is water shown by the latest USGS topographic map. Relief from surface water requirements may be allowed when surface waters are not present in accordance with 15A NCAC 02B .0233(3)(a)*. Per 15A NCAC 02B .0714(4), "On-site determinations shall be made by Authority staff that are certified pursuant to G.S. 143-214.25A." Please reach out to the Mooresville Regional Office to coordinate an on-site determination. *Note: this rule has been moved to 15A NCAC 02B .0714(3)(a). Email correspondence with NCDEQ which states an on-site determination is not required is included with this resubmittal package 2) On Sheet C-2.3, Section View — Ditch 5 the side slope of the ditch is listed as 2H:1V. Per 15A NCAC 02H .1003 (2)(c)(i), side slopes shall be no steeper than 3:1 unless engineering calculations and an on-site soil investigation demonstrate the soils and vegetation will remain stable in perpetuity. Calculations provided on sheet C-2.3 have been revised to show ditch 5 is stable with grass lining(n=0.035)and 2:1 side slopes,and velocity is less than 4.5 fps 3) Supplement-EZ - lx original and lx hard copy of the Supplement-EZ Form is required per Sections V&VI, 3 of the Application. a) Cover Page, Line 7: Please include the width of the vegetated setback (a minimum of 30 ft per 15A NCAC 02H .1017(10)). Even if an on-site determination from the regional office determines that there are no surface waters located on-site, this value should be included on the form(Lines 8 &9 can be left as"N/A"if there are no surface waters located on-site). Line 7 has been corrected to 30' www.eagleonline.net 2013-A Van Buren Avenue Indian Trail,NC 28079 Ph 704 882 4222 Fax 866 775 0329 Baylor Grove Pageland Highway NCDEQ Project#SW3230901 b) Calculations and the Supplement-EZ, Low Density, Line 15 call out the channel lining as "S75" which is a temporary E&SC matting. Please note that the calculations for the swales should reflect the swales in their permanent design configuration (if temporary E&SC matting is used, it should not be reflected in the permanent design calculations). Please revise accordingly. Permanent ditch calculations have been revised to remove S75 channel liner & reflect permanent grass cover with n-value of 0.035; see revisions clouded on sheet C-2.3. Line 15 of SuppEZ has been revised to remove reference of the S75 liner. c) Low Density, Line 6 5 — This value should match the highest Vactuai value provided in the swales table. Currently, that value is 3.64 fps, but this value may change when the Swale Table is updated to reflect the permanent swale condition. Line 5 has been revised to match the highest Vactuai value in the table d) Low Density, Line 13 — Stormwater outlets shall be designed so that they do not cause erosion downslope of the discharge point during the peak flow from the 10-year storm event per 15A NCAC 02H .1003(5). The response to line 13 was mistakenly marked as"no"and has been revised to"yes" PDF versions of the revised documents are being uploaded to the link provided in the comment letter. Hard copies of the revised documents are being delivered to the regional office. If you have any questions,please do not hesitate to contact us. Sincerely, Eagle Engineering Inc. t9CUGYLelikiTliti)rn Ck55 Lauren Thomas,PE Senior Project Manager www.eagleonline.net 2013-A Van Buren Avenue Indian Trail,NC 28079 Ph 704 882 4222 Fax 866 775 0329