HomeMy WebLinkAboutNCC240020_ESC Approval Submitted_20240104 n1
•
WILSON
NORTH CAROLINA
December 20, 2023
To: Rex Vick Jr.
RBV 1158, LLC
3434-135 Kildaire Farm Road
Cary, NC 27518
SUBJECT: Local Sedimentation and Erosion Control Program Approval
1158 Phase Ill
(EC-101823-01)
Mr. Vick,
The City of Wilson received a revised submission for an erosion control plan from Bartlett
Engineering and Surveying for the 1158 Phase III Development for the disturbance of 9.5 acres
on December 6, 2023. Additional information was received on December 18, 2023.
Bartlett Engineering and Surveying has addressed all outstanding items. Thus, the plan is
approved. This plan approval shall expire three years following the date of approval, if no land-
disturbing activity has been undertaken, as required by 15A NCAC 4B .0129.
This approval was based partially on the accuracy of the information provided in the Financial
Responsibility Form. You are requested to file an amended form if there is any change in the
information included on the form.
The City of Wilson has been granted delegated authority from the North Carolina Division of
Energy, Mineral and Land Resources to regulated land disturbing activities subject to the
Sedimentation Pollution Control Act of 1973. This Act is performance oriented, requiring
protection of existing natural resources and adjoining properties. If the approved sedimentation
and erosion control plan is inadequate to meet the requirements of the Act, this office may
require revisions to the plan and implementation of the revisions to insure compliance with the
Act. Acceptance and approval of this plan is conditioned upon your compliance with all Federal,
State, and City of Wilson's ordinances as applicable to this land disturbing activity.
Please be aware that this letter gives the notice required by G.S. 113A-61.1(a) of our right of
periodic inspections to insure compliance with the approved plan.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the
NCG010000 Construction General Permit. After the form is reviewed and found to be complete,
you will receive a link with payment instructions for the applicable annual permit fee. After the
fee is processed, you will receive the COC via email. As the Financially Responsible Party
shown on the FRO form submitted for this project,you MUST obtain the COO prior to
commencement of any land disturbing activity. The eNOl form and fee details may be accessed
at deq.nc.gov/NCG01. Please direct questions about the eNOl form to the Stormwater Program
staff in the Raleigh central office. If the owner/operator of this project changes in the future, the
new responsible party must obtain a new COC.
After you submit a complete and correct NOI Form, a COC will be emailed to you within three
business days. Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following
documentation be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviations/revisions;
2. The NCG01 permit and COC; and
3. Records of all required inspections made during the previous 30 days.
The General Contractor or delegated agent is required to set up an erosion control pre-
construction meeting (before construction begins) with the City Staff. Please contact either
Brandon Galloway (252-205-2525) to schedule the pre-construction meeting. A minimum of 72
hours' notice is required
If you have questions, please contact me at (252) 299-8616.
Sincerely,
Kyle F. Manning, PE, CFM
Assistant Director of Public Works
Cc: Brandon Galloway, Engineering Services Coordinator
Steve Oliverio, Bartlett Engineering and Surveying
enclosures