Loading...
HomeMy WebLinkAboutNCC210371_NOT Closeout Documents_20240102 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 127 Cardinal Drive Extension,Wilmington,NC 28405 (910) 796-7215 County: Duplin Project: Beulaville 115kV Substation Expansion River basin: Cape Fear Person financially responsible:Duke Energy Progress,LLC-Alan W Lewis, Project#: DUPLI-2021-001 Manager Site Design&Permitting Address: 411 Fayetteville Street,Raleigh,NC 27601 1. Project Location: Jackson Store Road,Beulaville Pictures: No 2. Weather and soil conditions: 60's partly cloudy workable Initial inspection: Yes 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): Title: Inspection report: Sent Report Date given/sent: April 19,2021 9. Corrective action needed: 10. Comments: File closed. brian.lambe@ncdenr.gov Reported by: Brian Lambe Others present: Date of inspection: April 15,2022 Time arriving on site: 10:00 AM Time leaving site: 10:20 AM CC: