HomeMy WebLinkAboutNCC210371_NOT Closeout Documents_20240102 Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 127 Cardinal Drive Extension,Wilmington,NC 28405 (910) 796-7215
County: Duplin Project: Beulaville 115kV Substation Expansion River basin: Cape Fear
Person financially responsible:Duke Energy Progress,LLC-Alan W Lewis, Project#: DUPLI-2021-001
Manager Site Design&Permitting
Address: 411 Fayetteville Street,Raleigh,NC 27601
1. Project Location: Jackson Store Road,Beulaville
Pictures: No
2. Weather and soil conditions: 60's partly cloudy workable Initial inspection: Yes
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): Title:
Inspection report: Sent Report Date given/sent: April 19,2021
9. Corrective action needed:
10. Comments: File closed.
brian.lambe@ncdenr.gov
Reported by: Brian Lambe Others present:
Date of inspection: April 15,2022 Time arriving on site: 10:00 AM Time leaving site: 10:20 AM
CC: