HomeMy WebLinkAboutNCC205293_NOT Closeout Documents_20240102 Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 450 W. Hanes Mill Road, Suite 300,Winston-Salem,NC 27105 (336)
776-9800
County: Alamance Project: Elon University Engineering&Physics River basin: Cape Fear
Person financially responsible:Elon University-Susan Kirkland,AVP for Business Project#: ALAMA-2021-027
&Finance
Address: Alamance Building 107,Elon,NC 27244
1. Project Location: N.O'Kelly Ave.,Elon
Pictures: No
2. Weather and soil conditions: Sunny,no activity Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): Title:
Inspection report: Sent Report Date given/sent: March 13,2023
9. Corrective action needed:
10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional
self-monitoring or self-inspections are required. Project is in compliance and released under
the SPCA.Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities(NCG01)must be requested by the permittee via a Notice of
Termination(NOT).The NOT is available at:
https://edocs.deq.nc.gov/Forms/NCG01-Termination. Please note that this correspondence
must be uploaded as part of completing the NOT process. If you have any questions,please
contact me at Lily.Kay@ncdenr.gov or by phone at(336)776-9655.
Reported by: Lily Kay Others present:
Date of inspection: March 09,2023 Time arriving on site: 2:20 PM Time leaving site: 2:30 PM
cc: