Loading...
HomeMy WebLinkAboutNC0064246_Request of extension of SOC schedule_20231219Jones Estates, LLC JONES PO Box 14466 ESTATES Durham, NC 27709 Vanessa Manual, I am pleased to say that Pace MHP has completed the last portion of the SOC. Jones Estates put forth a great effort in meeting the States' requirements outlined in the Special Order by Consent. Jones Estates installed a Flow splitter box, all permitted equipment for Train 1 and Train 2, and obtain Field Certification for Pace WWTP. We had some issues with materials, weather and unfortunately our former operator, but we were able to achieve our goal. We have made great strides in bringing Pace MHP back into Environmental compliance and I know NCDEQ would agree. The current operator, Andy Mathews, brings vast knowledge to small package plants and has done wonders since being on board. We at Jones Estates feel this plant is the best it has ever been since taking Jones Estates took ownership and NCDEQ should have no issues with Pace MHP going forward. We would request a 60-day extension to achieve NDPES permit limits as we have had some disruptions in the plant these past few weeks. I firmly believe by March 1, 2024, Pace WWTP will achieve all permit limits and be in good compliance with NCDEQ. Kellen P. Buss Director of Site Infrastructure Jones Estates LLC