Loading...
HomeMy WebLinkAboutSW6230902_Design Calculations_20240103 Bowman Erwin Road Residential 1504 Erwin Road Proposed Residential Development and Associated Infrastructure Dunn, North Carolina COORDINATES: 35°18'55.1 "N, 78°38'22.2"W Project No.: 220124-01 -004 Stormwater Management Report Prepared By: Bowman NORTH CAROLINA 4006 Barrett Drive, Suite 104 Raleigh, NC 27609 • k�1'et+roZ,,� PREPARED FOR: t�`j�� ` �QV v SEAL a , litt. ,,AzI �r ' Aj$/716„1 . Stout Land Development, LLC 1786 Metromedical Drive Matt Lowder, P Fayetteville, NC 28304 NC License No. 24434 Ben Stout (919) 553-6570 (910) 779-0019 mlowder@bowman.com ben@benstoutconstruction.com JANUARY 2, 2024 Erwin Road Residential—Dunn, NC Wage Bowman NORTH CAROLINA TABLE OF CONTENTS Stormwater Management Narrative PAGE • Project Data 3 • Site History 3 • Project Description 4 • Design Requirements 5 • Methodology 5 • System Summary 6 • Conclusion 6 Appendix A: Figures 10 • Soil Report • Topography Map • FEMA Flood Map No. 3720150600J • Surface Water Classification Maps • Hydrologic Unit Code (HUC) • NOAA Point Precipitation Depth Estimates • NOAA Point Precipitation Intensity Estimates • Pre-Development Drainage Basin Map • Post-Development Drainage Basin Map • Wetlands Inventory Map Appendix B: Stormwater Wet Pond Calculations 12 • CN Values • Time of Concentration Calculations • Wet Pond — Design, Details, and Hydrographs • Grass Channels • Spread Calculations Appendix C: Storm Drainage System Calculations 13 • 100-System Appendix D: Erosion and Sediment Control Calculations 14 • Rip Rap Calculations • Skimmer Basin • Riser • Temporary Diversion Ditches Erwin Road Residential—Dunn, NC 2 I P a g e Bowman NORTH CAROLINA STORMWATER MANAGEMENT NARRATIVE This report documents the hydraulic and hydrological analysis performed by Bowman Consulting for the proposed Erwin Road Residential site expansion in Dunn, North Carolina. The report consists of a review of available hydrologic data, methods analysis, development of existing and proposed hydraulic models, and presentation of the impacts of the proposed development in the project. The offsite drainage to the SCM is 22,179 sf (0.51 ac). A portion of this is the residential lot that resides between proposed lots 2 and 3 but not on the development parcel. The remainder of this offsite drainage area is a portion of Erwin Road. The reason a portion of Erwin Road is being collected is because the city is requiring curb and gutter along the entire frontage which will require drainage pipes and structures. Unfortunately, there are no drainage ditches on the north side of Erwin Road to discharge into without going several hundred feet west on Erwin Road. This being the case, one of the drainage structures will need to be routed through the pond. To minimize current and future impervious being sent to the SCM, a concrete flume is being proposed at the southeast corner of the parcel along Erwin Road near lot 1, which bypasses the SCM. In the calculations and design, this entire offsite drainage area is being considered impervious. PROJECT DATA Table 1:Site Information Project Name Erwin Road Residential Parcel Identification Number (PIN) 1506795869 Parcel Address 1504 Erwin Road River Basin Cape Fear Total Parcel Area 9.04 acres (± 393,826 SF) EXISTING 0 acres (±0 SF) Impervious Area PROPOSED ONSITE 1.90 acres (±82,814 SF) Area of Land Disturbance 8.90 acres (± 387,684 SF) TMDLs None Watershed Protection Overlay None Erwin Road Residential—Dunn, NC 3 I P a g e Bowman NORTH CAROLINA SITE HISTORY The proposed site is located in Dunn, North Carolina and is within City of Dunn limits. The site is located South of US HWY 421, West of Downton Dunn, and North of Erwin Road. The site is currently undeveloped wooded and open space area. Soils located within the project site as defined by NRCS (National Resources Conservation Service) are described in Table 2. Table 2:Hydrologic Soil Groups Group Description Bb Bibb soils, frequently flooded NoB Norfolk loamy sand, 2 to 6 percent slopes NoC Norfolk loamy sand, 6 to 10 percent slopes The hydrologic soil group (HSG) designations for these soils are groups B, C, and D, respectively. Group B soils are described as coarse and having a moderate infiltration rate when thoroughly wet. This consists of moderately deep or deep and moderately well to well drained soils that have a moderate rate water transmission. Group C soils are defined as having a slow infiltration rate when thoroughly wet.These soils are fine and have a layer that impedes the downward movement of water. Group D soils are best described as having a very slow infiltration rate and high runoff potential when thoroughly wet. A Web Soil Survey Map for the site is included in Appendix A. For the purposes of design, the same hydrologic group was utilized for both Pre- and Post- Development conditions. PROJECT DESCRIPTION Stout Land Development, LLC is proposing to develop±8.90 acres of disturbed area within the 9.04-acre parcel. The proposed development consists of 27 houses each with a footprint of 1,230 SF, stormwater control measures, and associated pavement, including parking areas, driveways, and curbs. Watershed Protection Overlay Based on Harnett County GIS, the site is not located within a watershed protection area. Floodplains A portion of the Erwin Road parcel is located within Zone 'X' and 'AE', per the FEMA Panel 3720150600J located in Appendix A. No proposed fill will be placed in the floodplains. Because the post-developed conditions will not result in a net increase in runoff from the site, no adverse downstream impacts are expected to occur. Erwin Road Residential—Dunn, NC 4 I P a g e Bowman NORTH CAROLINA DESIGN REQUIRMENTS Stormwater design was based on the standards presented in the North Carolina Department of Environmental Quality (NCDEQ) Stormwater Design Manual. Post-development rates for the site were designed to not exceed pre-development discharge rates for the 1-year, 2-year, 10-year, and 100-year twenty-four (24)-hour duration storm events. Stormwater quantity control will be provided by the use of a new wet pond and two grass channels as part of the development. Water Quality and Water Quantity Since the project site is located in the Cape Fear River Basin, the following criteria below was considered for the design of SCMs in regard to water quality and quantity: 1. 100% of all impervious and built-upon-area (BUA) will be treated by a stormwater control measure. 2. High density developments must manage and attenuate the first inch of runoff for water quality in an approved Stormwater Control Measure(s) (SCM). The peak flow rate of the first inch water quality volume from the SCM must also be shown to be less than the predeveloped peak rate for the 1 year-24-hour storm event. 3. The increase in the 1-inch design volume shall be released over a 2-to-5-day period. METHODOLOGY Hydrology and storm water modeling calculations were performed using the latest version of Hydraflow modeling software. Simulations were set up based on information provided within the North Carolina Department of Environmental Quality Stormwater Design Manual. The Soil Conservation Service (NRCS TR-55) hydrologic method was utilized for the estimation of stormwater runoff peak rates and the generation of hydrographs for the routing of stormwater flows. Input and results can be found summarized in tables throughout this report and in the appendices. SYSTEM SUMMARY The post developed design of the site has been laid out in such a way to provide a drainage area that will require stormwater management.The stormwater system is comprised of a singular SCM. The primary SCM is a stormwater wet pond that is fully sized for the design storm that utilizes a storm drain pipe network to collect runoff from impervious surfaces on the site. The SCM will also comprise of two grass channels that will collect any runoff from the green areas of the proposed site. Erwin Road Residential—Dunn, NC 5 I P a g e Bowman NORTH CAROLINA CONCLUSION Stormwater design was based on the standards presented in the North Carolina Department of Environmental Quality (NCDEQ) Stormwater Design Manual. Post-development discharge rates for the site were designed to not exceed pre-development discharge rates for the 1-year,2-year, 10-year.and 100-year,twenty-four(24)-hour duration storm events. Stormwater quantity control will be provided by the implementation of a new wet pond and two grass channels as part of the development. Peak Runoff Analysis • Pre-Development Conditions The existing site is currently undeveloped wooded and open space area. There is one drainage area analyzed in this report with its own study point, composite runoff curve number and single point of analysis. SCM Pre-Developed Area covers a portion of the parcel at 8.74 acres (+380,520 SF) including the 20' easement for the existing sanitary sewer pipe. This area slopes generally from Southeast to Northwest, with average slopes in the range of 2-10% and consists of pervious area. The characteristics for the pre-development basin are shown below and the drainage maps can be found in Appendix A. Additional calculations for the basin can also be found in Appendix B. Table 5:Pre-Development Summaries Area Composite Time of Basin ID [acres] Curve Concentration Number (CN) (Tc) [min.] Pre-Developed Area 8.74 53.3 14.9 • Post-Development Conditions The post-development condition contains a single drainage area directed to the stormwater wet pond and one bypass drainage area from the pre-development condition. SCM Post-Developed Area consists of 5.38 acres (+234,269 SF) of the proposed residential houses, road, and other infrastructure required. The wet pond collects runoff with catch basins and drainage pipes that connect to the stormwater wet pond. The characteristics for the post-development drainage areas are shown below and calculations can be found in Appendix B. A drainage map identifying the basin can be found in Appendix A. Erwin Road Residential—Dunn, NC Wage Bowman NORTH CAROLINA Table 6:Post Development Area Summaries Area Composite Time of Basin ID [acres] Curve Concentration Number (CN) (Tc) [min.] SCM Post-Developed Area 5.38 74.3 5 Table 7:Post Development By-Pass Area Summaries Area Composite Time of Basin ID [acres] Curve Concentration Number (CN) (Tc) [min.] SCM Post-Developed Bypass Area 3.56 53.6 10 • Comparison of Peak Discharges The pre- and post- development peak discharges are shown below. Full calculations and hydrographs can be found on Appendix B. Table 8: Total Site Downstream Impact Wet Pond SCM Pre-Dev. Total Site Peak Flow Post-Dev. Total Site Peak Flow Storm Event (cfs) (cfs) 1-yr 24-hr 0.396 0.265 2-yr 24-hr 1.968 1.271 10-yr 24-hr 11.08 10.13 100-yr 24-hr 33.28 32.26 Site Stabilization During construction phase, the permanent stormwater wetlands will be utilized as temporary sediment basins. Skimmers will be used in the temporary sediment basins to dewater the basin from the surface. After final grading is completed, permanent vegetation shall be applied in accordance with the seeding requirements from the NCDEQ and the landscape plan for this site. Erwin Road Residential—Dunn, NC 7 Bowman NORTH CAROLINA APPENDIX A Figures Hydrological Soil Report Topography Map FEMA Flood Map No. 3720150600J Surface Water Classification Maps Hydrologic Unit Code (HUC) Wetlands Inventory Map NOAA Point Precipitation Depth Estimates NOAA Point Precipitation Intensity Estimates Pre-Development Drainage Basin Map Post-Development Drainage Basin Map Erwin Road Residential—Dunn, NC Wage a Hydrologic Soil Group—Harnett County,North Carolina N t N n 714420 714470 714520 714570 714620 714670 714720 35°19'2"N 35°19'2"N /wit% Thorndale 7 —o M . = r p T. �S .11 gb �, sip 0, b 4 C at ill i . . _ 4. 41. 41114 40 —1 FO Y 1 — ,tis4. M �\ _ 7 .: ! M 1 '+s. ,,,P lb =•N - _ 421 Busin_e_ss N �000 Gz;Rp Fuliazq Tot t be vEll d mil t d : 1er 1 la 35°18'48"N - - 35°18'48"N 714420 714470 714520 714570 714620 714670 714720 3 3 ko a, Map Scale:1:2,150 if printed on A portrait(8.5"x 11")sheet. ; Meters Ko N 0 30 60 120 180 Feet 0 100 200 400 600 Map projection:Web Mercator Comer coordinates:WGS84 Edge tics:UTM Zone 17N WGS84 USDA Natural Resources Web Soil Survey 5/15/2023 Conservation Service National Cooperative Soil Survey Page 1 of 4 Hydrologic Soil Group—Harnett County,North Carolina MAP LEGEND MAP INFORMATION Area of Interest(AOI) p c The soil surveys that comprise your AOI were mapped at Area of Interest(AOI) 1:24,000. 0 C/D Soils • D Warning:Soil Map may not be valid at this scale. Soil Rating Polygons l A p Not rated or not available Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil n A/D Water Features line placement.The maps do not show the small areas of Streams and Canals contrasting soils that could have been shown at a more detailed n B scale. Transportation Q B/D r4-1. Rails Please rely on the bar scale on each map sheet for map n C measurements. ti Interstate Highways C/D US Routes Source of Map: Natural Resources Conservation Service Web Soil Survey URL: 0 D Major Roads Coordinate System: Web Mercator(EPSG:3857) n Not rated or not available Local Roads Maps from the Web Soil Survey are based on the Web Mercator Soil Rating Lines Background projection,which preserves direction and shape but distorts • • A distance and area.A projection that preserves area,such as the 1111 Aerial Photography Albers equal-area conic projection,should be used if more • • A/D accurate calculations of distance or area are required. ^r B This product is generated from the USDA-NRCS certified data as ,. B/D of the version date(s)listed below. • r C Soil Survey Area: Harnett County, North Carolina Survey Area Data: Version 20,Sep 8,2022 • • C/D Soil map units are labeled(as space allows)for map scales • • D 1:50,000 or larger. • w Not rated or not available Date(s)aerial images were photographed: Apr 24,2022—May Soil Rating Points 9,2022 p A The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background O A/D imagery displayed on these maps.As a result,some minor • B shifting of map unit boundaries may be evident. • B/D USDA Natural Resources Web Soil Survey 5/15/2023 Conservation Service National Cooperative Soil Survey Page 2 of 4 Hydrologic Soil Group—Harnett County, North Carolina Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI Bb Bibb soils,frequently A/D 3.7 21.2% flooded NoB Norfolk loamy sand,2 to A 9.1 52.6% 6 percent slopes NoC Norfolk loamy sand,6 to A 4.6 26.2% 10 percent slopes Totals for Area of Interest 17.4 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential)when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential)when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. USDA Natural Resources Web Soil Survey 5/15/2023 Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group—Harnett County, North Carolina Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff.None Specified Tie-break Rule: Higher USDA Natural Resources Web Soil Survey 5/15/2023 Conservation Service National Cooperative Soil Survey Page 4 of 4 1 jlifp1111111111: co 421�'.ST RD pLD Pp5 ' !J �,._ Z �y_ Erwin o E -Vi— N ` �� �oyo L w cal„, m� _ t • l o 7 0 c FP a ®� Z ' y AWARREN BP G 1 DUNN Z cI , �7----- "I -:p I•RON RD �� _ �„ � v 111 E WIN RD m • OLD SILO LN: �j 54, '- U r °CA/ / o ; Project Site = :: q ......../ m o � m A 11 z— ANTIOCH CHURCH RD ± - :., a Fz - 2 1 LL BAIT RD Q -- O'-' KRIS RD ® 14 r , _ ) ' SO u %÷ - �` 1 0 - `„� 0 _1-` SUSAN TART RD 2 z �, �.\ I \N.. v National Flood Hazard Layer FIRMette - FEMA _Legend 78°38'40"W 35°19'9"N SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT II • 101".4 Without Base Flood Elevation(BFE) 4 I\ \`_ , ilkel Zone A,V,A99 \ I111 .1 , y SPECIAL FLOOD With BFE or Depth zone AE,AD,AH,ve,AR ilinlirill 111 i • HAZARD AREAS Regulatory Floodway ' V 1 • 0.2%Annual Chance Flood Hazard,Areas ' • of 1%annual chance flood with average • • depth less than one foot or with drainage : -,c areas of less than one square mile zone x lie Future Conditions 1%Annual - Chance Flood Hazard zone x . (rr'n 1 ' Ir IliA Area with Reduced Flood Risk due to TOWN OF•ERWIN �' .' OTHER AREAS OF Levee.See Notes.zonex u • FLOOD HAZARD �� Area with Flood Risk due to Leveezone D 370456 � •, ' t,' L3 •ai.,: p NO SCREEN Area of Minimal Flood Hazard zonex Effective LOMRs j .t`+ ` I OTHER AREAS Area of Undetermined Flood Hazard Zone D Zone AE . //� �+-� '; a GENERAL ---- Channel,Culvert,or Storm Sewer it•;_•ai+ pi, ., '• U •,• �• STRUCTURES III I I I Levee,Dike,or Floodwall FLOODWAY , Zone AE ± T 0 20.2 Cross Sections with 1%Annual Chance CITY DUNN t�s Water Surface Elevation /6n Ci J< OF DUNN . - 8— — - Coastal Transect , l' 76 • !' 370264 / ^^^^-513----'- Base Flood Elevation Line(BFE) • Limit of Study /6> - 9F�Fj AREA OF MINIMALLOOD HAZARD Jurisdiction Boundary • F7 • Zone X • ' --- Coastal Transect Baseline h47. � 4&� 1/201 W6001� M OTHER - profile Baseline �F V . FEATURES Hydrographic Feature / 1 • �. � �9 Digital Data Available / • L A --jil ill .. ::::::ataAalable , j_ ► ',.i MAPPANELS %' p 4Ail � F • •• a 4 • r L •T'* 9 The pin displayed on the map is an approximate /'40 1 `1 - • point selected by the user and does not represent 167 FEET ': ♦- 1 \44 ,,,, '04 _. _ . ., . , _ an authoritative property location. 1 \ \'i. -tlr ' L, This map complies with FEMA's standards for the use of 3 ti soil/ • �' !V -. ,� * a4 •- . . •• digital flood maps if it is not void as described below. `6(j' ��� 1 �� ,t i *; The basemap shown complies with FEMA's basemap , •� � r accuracy standards ' 0. 0 The flood hazard information is derived directly from the 4 1 authoritative NFHL web services provided by FEMA.This map �• � e . was exported on 6/15/2023 at 11:18 AM and does not ' J� 1 reflect changes or amendments subsequent to this date and t J - I time.The NFHL and effective information may change or •l,fII - J become superseded by new data over time. f4Ilio 1 A. This map image is void if the one or more of the following map • t elements do not appear:basemap imagery,flood zone labels, legend,scale bar,map creation date,community identifiers, ^� 11 ` '��� : FIRM panel number,and FIRM effective date.Map images for Feet 1:6 78°38'3"W 35°18'40"N unmapped and unmodernized areas cannot be used for 0 250 500 1,000 1,500 2,000 '0�� regulatory purposes. Basemap Imagery Source:USGS National Map 2023 \1:1 U` v` ti Surface Water Classifications: m o X �o ce V Stream Index: 18-68-12 1 __ 43 ' ,,t. a I)k Stream Name: Black River(Little Black River) (Popes Lake,Rhodes Pond) t 1 Description: From source to South River % 4 Classification: C;Sw Date of Class_: August 31, 1974ll i • 1e Dr T ho rrtaa What does this Class.mean? River Basin: Cape Fear q• +;Zoom to �De r 1 t kv g Imo i , I o a g tc Erwin lid eOr w 0 vst o) 5. b o tw ,�, vc \ 6- a' ti al 3 -o Q �4 c� �r�h�SOR Dr r Q' . Lp X P (1of2) al O` 12-Digit HUC(Subwatershed) 0 r 12-Digit Name: Lower Black River 12-Digit Code: 030300060102 a a r 10-Digit Name: Upper South River a) • Fop0'Ra 10-Digit Code: 0303000601 8-Digit Code: 03030006 Q River Basin: Cape Fear 3ccn 12-Digit Area (ac): 13.295.32 �d y �a� rp�� Zoom to P I- 5 a Hunt Valley Or u m m 5/25/23,7:56 AM Precipitation Frequency Data Server NOAA Atlas 14,Volume 2,Version 3 ° Location name: Dunn, North Carolina, USA* '�� '�� p Latitude:35.3165°,Longitude: -78.6409° none 5 Elevation: 164 ft** 1 'o, ,Es o, *source:ESRI Maps w�M^M ilia) **source:USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M.Bonnin,D.Martin,B.Lin,T.Parzybok,M.Yekta,and D.Riley NOAA,National Weather Service,Silver Spring,Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Average recurrence interval(years) Duration 1 2 I 5 10 25 50 100 200 I 500 1000 5-min 0.437 0.514 0.594 0.660 0.736 0.793 0.847 0.898 0.960 1.01 (0.399-0.480) (0.470-0.565) (0.543-0.653) (0.602-0.724) (0.668-0.806) (0.718-0.868) (0.763-0.926) (0.804-0.982) (0.851-1.05) (0.890-1.11) 10-min 0.698 0.822 0.951 1.06 1.17 1.26 1.35 1.42 1.52 1.59 (0.637-0.767) (0.752-0.903) (0.870-1.04) (0.963-1.16) (1.06-1.28) (1.14-1.38) (1.21-1.47) (1.27-1.56) (1.35-1.66) (1.40-1.74) 15-min 0.872 1.03 1 1.20 1.34 1.49 I 1.60 1.70 1.80 1.91 2.00 (0.797-0.959) (0.945-1.14) (1.10-1.32) (1.22-1.46) (1.35-1.63) (1.45-1.75) (1.53-1.86) (1.61-1.96) I (1.69-2.09) (1.76-2.19) 30-min 1.20 1.43 1.71 1.94 2.20 2.41 2.61 2.80 I 3.04 3.24 (1.09-1.31) (1.30-1.57) (1.56-1.88) (1.77-2.12) (2.00-2.41) (2.18-2.64) (2.35-2.85) (2.50-3.06) (2.70-3.32) (2.85-3.55) 60-min 1.49 1.79 2.19 2.52 2.93 3.26 3.59 3.92 4.36 4.73 (1.36-1.64) (1.64-1.97) (2.00-2.41) (2.30-2.76) (2.66-3.21) (2.96-3.57) I (3.23-3.92) (3.51-4.29) (3.87-4.77) (4.16-5.18) 2-hr 1.75 2.12 2.63 3.07 I 3.64 4.11 4.59 5.09 5.78 6.36 (1.58-1.95) (1.92-2.36) (2.38-2.93) (2.76-3.41) (3.25-4.04) (3.66-4.57) (4.06-5.10) (4.48-5.65) (5.03-6.40) (5.49-7.06) 3-hr 1.86 2.24 2.81 3.30 3.95 4.51 5.09 5.72 6.59 7.35 (1.68-2.08) (2.04-2.51) (2.54-3.14) (2.97-3.68) (3.54-4.40) (4.01-5.03) (4.50-5.67) (5.01-6.36) (5.71-7.33) (6.30-8.19) 6-hr 2.22 2.68 3.35 3.94 4.75 5.44 6.16 6.94 8.04 9.00 (2.02-2.47) (2.44-2.98) (3.04-3.72) (3.56-4.37) (4.26-5.25) (4.85-6.01) (5.44-6.80) (6.07-7.65) (6.94-8.87) (7.68-9.94) 12-hr 2.61 3.15 3.96 4.68 5.68 6.54 7.46 8.46 9.90 11.2 (2.36-2.91) I (2.85-3.51) (3.58-4.42) (4.21-5.22) (5.06-6.30) (5.79-7.25) (6.54-8.25) (7.33-9.35) (8.44-10.9) (9.38-12.3) 24-hr 3.05 3.71 4.75 5.59 6.77 7.74 8.76 9.85 11.4 12.7 (2.78-3.36) (3.38-4.08) (4.31-5.22) (5.07-6.14) (6.11-7.44) (6.96-8.52) (7.86-9.64) (8.79-10.8) (10.1-12.6) (11.2-14.0) 2-day 3.57 4.32 5.49 6.43 7.75 8.83 9.97 11.2 12.9 14.3 (3.27-3.90) (3.96-4.72) (5.01-5.99) (5.86-7.02) (7.03-8.46) (7.97-9.65) (8.95-10.9) (9.98-12.2) (11.4-14.2) (12.6-15.8) 3-day 3.80 4.59 5.80 6.76 8.12 9.22 10.4 11.6 13.3 14.7 (3.50-4.14) (4.22-5.00) (5.32-6.30) (6.19-7.34) (7.39-8.82) (8.36-10.0) (9.36-11.3) (10.4-12.6) (11.9-14.6)I (13.0-16.1) 4-day 4.04 4.87 6.11 7.10 8.48 9.60 10.8 12.0 13.8 15.2 (3.73-4.37) (4.49-5.27) (5.62-6.61) (6.52-7.67) (7.75-9.17) (8.74-10.4) (9.76-11.7) (10.8-13.0) (12.3-15.0) (13.5-16.5) 7-day 4.67 5.61 6.96 8.03 9.52 10.7 11.9 13.2 15.0 16.5 (4.31-5.08) (5.17-6.10) (6.40-7.57) (7.36-8.72) (8.69-10.3) (9.75-11.6) (10.8-13.0) (11.9-14.4) (13.4-16.4) (14.7-18.0) 10-day 5.34 6.38 1 7.79 I 8.89 10.4 11.6 12.8 I 14.0 15.7 17.1 (4.98-5.73) (5.95-6.86) (7.24-8.37) (8.24-9.54) (9.59-11.1) (10.6-12.4) (11.7-13.7) (12.8-15.1) (14.3-17.0) (15.5-18.5) 20-day 7.19 I 8.54 10.3 11.6 13.4 14.9 16.3 17.8 19.8 21.4 (6.69-7.73) (7.95-9.19) (9.53-11.0) (10.8-12.5) (12.4-14.4) r(13.7-16.0) (15.0-17.5) (16.3-19.2) 1 (18.1-21.4) (19.4-23.1) 30-day 8.96 10.6 12.5 14.0 15.9 17.4 18.9 20.4 22.4 I 24.0 (8.35-9.64) (9.88-11.4) (11.6-13.4) (13.0-15.0) (14.7-17.1) (16.1-18.7) (17.4-20.3) (18.8-22.0) (20.5-24.2) (21.9-25.9) 45-day 11.4 13.4 15.6 17.2 19.4 21.0 22.6 24.2 26.4 28.0 (10.7-12.2) (12.6-14.3) (14.6-16.6) (16.1-18.4) (18.1-20.7) (19.6-22.5) (21.0-24.2) (22.5-26.0) (24.3-28.3) (25.8-30.1) 60-day 13.6 16.0 18.4 20.2 22.6 24.4 26.1 27.8 30.1 31.8 (12.8-14.5) (15.0-17.0) (17.3-19.6) i (19.0-21.6) (21.2-24.1) I (22.8-26.0) (24.4-27.9) I (25.9-29.7) (27.9-32.2) (29.4-34.0) 1 Precipitation frequency(PF)estimates in this table are based on frequency analysis of partial duration series(PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90%confidence interval.The probability that precipitation frequency estimates (for a given duration and average recurrence interval)will be greater than the upper bound(or less than the lower bound)is 5%.Estimates at upper bounds are not checked against probable maximum precipitation(PMP)estimates and may be higher than currently valid PMP values. Please refer to NOAAAtlas 14 document for more information. Back to Top PF graphical https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=35.3165&Ion=-78.6409&data=depth&units=english&series=pds 1/4 5/25/23,7:56 AM Precipitation Frequency Data Server PDS-based depth-duration-frequency (DDF) curves Latitude: 35.3165°, Longitude: -78.6409° Average recurrence 30 - interval (years) c 25 - — 1 L / — 2 a20 - — / — 6 c �� — 10 G 15 - . — 25 y — 50 a 10 - — 100 i ,PIM — 200 500 5 - �-_ — 1000 0 c c c c c '- V '- '- '- >, >,>, >, >, >, >, >,>, ." ." - L L r r t ro ro ro ro ro ro ro ro ro i p A ns th A ,r -O -O-O -o -9 7 7 7 17 V1 O m tD Duration N N N O N m v O 30 — 25 — '� ■di Duration L a 20 — a, — 5-nun — 2-day v c 1111111 — t0-mn — 3-day .o▪ 15 —_� J_��= - 15-rnrn — 4-day ro �--_ a — 30 min — 7-day 10 - -- _ -____-- — 60-nun — 10-day a _ _ �� — 2-hr — 20-day 5 —� — 3-hr — 30-day _ — 6-hr — 45-day 0 J -- - — 12-hr — 60-day 1 I I i - I i I — 24-hr 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NOAA Atlas 14,Volume 2,Version 3 Created(GMT) Thu May 25 11.56-22 2023 Back to Top Maps & aerials Small scale terrain https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=35.3165&Ion=-78.6409&data=depth&units=english&series=pds 2/4 5/25/23,7:56 AM Precipitation Frequency Data Server \.,V;& Erwa W cow 0 o Si 9S # '• nn 4-4.J1'' 3km e 2mi ' Lar a scale terrain :on-Sal em 0 , • • Durham Greensboro • Raleigh •ockyMount • TH C A R O L I N A I •Greenville ll Q • 'Charlotte Fayetteville. I . Jacks. s„ IN 100km Wilmington O,slok • Bay, 60mi Large scale map 0 it -6 lem o Greensboro ! Durham ORocky Mount Raleigh North o eenville i Carolina ' arlotte MO. F teville 0 Jacks.Q \ o III 100km Wilmington fiimb 60mi Large scale aerial https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=35.3165&Ion=-78.6409&data=depth&units=english&series=pds 3/4 5/25/23,7:56 AM Precipitation Frequency Data Server inston-Salem Greensboro Durham . Rocky Mount • Raleigh • Greenville North • Carolina. Charlotte Fayetteville 111 Jacksor 100km WI lmi nQtor umb 60mi Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring,MD 20910 Questions?:HDSC.Questions@noaa.gov Disclaimer https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=35.3165&Ion=-78.6409&data=depth&units=english&series=pds 4/4 5/25/23,7:57 AM Precipitation Frequency Data Server NOAA Atlas 14,Volume 2,Version 3 ° Location name: Dunn, North Carolina, USA* '�� '�� p Latitude:35.3165°,Longitude: -78.6409° none % Elevation: 164 ft** 1 'o, ,Es o, *source:ESRI Maps w�M^M ilia) **source:USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M.Bonnin,D.Martin,B.Lin,T.Parzybok,M.Yekta,and D.Riley NOAA,National Weather Service,Silver Spring,Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches/hour)1 Average recurrence interval(years) Duration 1 2 5 10 25 50 100 - 200 500 1000 5-min 5.24 6.17 7.13 7.92 8.83 9.52 10.2 10.8 11.5 12.1 (4.79-5.76) (5.64-6.78) (6.52-7.84) (7.22-8.69) (8.02-9.67) (8.62-10.4) (9.16-11.1) (9.65-11.8) (10.2-12.6) (10.7-13.3) 10-min 4.19 4.93 5.71 6.34 7.04 7.58 8.08 8.54 9.11 9.56 (3.82-4.60) (4.51-5.42) (5.22-6.27) (5.78-6.95) i (6.39-7.70) (6.86-8.29) (7.27-8.83) (7.64-9.34) (8.08-9.96) (8.41-10.5) 15-min 3.49 4.13 4.81 5.34 5.95 6.40 6.81 7.18 7.64 8.00 (3.19-3.84) (3.78-4.54) (4.40-5.29) (4.87-5.86) (5.40-6.51) (5.79-7.00) (6.12-7.44) (6.43-7.85) (6.78-8.36) (7.04-8.76) 30-min 2.39 2.85 3.42 3.87 4.40 4.82 5.21 5.59 6.08 6.48 (2.18-2.63) (2.61-3.14) (3.13-3.76) (3.53-4.25) (4.00-4.82) _(4.36-5.27) (4.69-5.70) (5.00-6.11) (5.39-6.65) (5.70-7.09) 60-min 1.49 1.79 2.19 2.52 2.93 3.26 3.59 3.92 4.36 4.73 (1.36-1.64) (1.64-1.97) (2.00-2.41) (2.30-2.76)J (2.66-3.21) I (2.96-3.57) (3.23-3.92) (3.51-4.29) (3.87-4.77) (4.16-5.18) 2-hr 0.875 1.06 1.32 1.53 1.82 2.06 2.29 2.54 2.89 3.18 (0.791-0.977) (0.957-1.18) (1.19-1.47) (1.38-1.70) (1.63-2.02) (1.83-2.28) (2.03-2.55) (2.24-2.82) (2.52-3.20) (2.74-3.53) 3-hr 0.618 0.747 0.934 1.10 1.32 1.50 1.70 1.90 2.20 2.45 (0.560-0.692) (0.677-0.835) (0.845-1.04) (0.989-1.22) (1.18-1.46) (1.34-1.67) (1.50-1.89) (1.67-2.12) (1.90-2.44) (2.10-2.73) 6-hr 0.370 0.447 0.559 0.658 0.792 0.907 1.03 1.16 1.34 1.50 (0.336-0.411) (0.406-0.496) (0.507-0.621) (0.595-0.730) (0.711-0.876) (0.809-1.00) (0.908-1.14) (1.01-1.28) (1.16-1.48) (1.28-1.66) 12-hr 0.216 0.261 0.328 0.388 0.471 0.543 0.618 0.701 0.821 0.926 (0.195-0.241) (0.236-0.291) (0.297-0.366) (0.349-0.433) (0.420-0.523) (0.480-0.601) (0.542-0.684) (0.608-0.776) (0.700-0.908) (0.778-1.02) 24-hr 0.127 0.154 0.197 0.232 0.282 0.322 0.365 0.410 0.475 0.527 (0.115-0.139) (0.140-0.169) (0.179-0.217) (0.211-0.255) (0.254-0.310) (0.290-0.354) (0.327-0.401) (0.366-0.452) (0.420-0.524) (0.464-0.583) 2-day 0.074 0.090 0.114 0.133 0.161 0.183 0.207 ' 0.232 0.268 0.297 (0.068-0.081) (0.082-0.098) (0.104-0.124) (0.122-0.146) (0.146-0.176)1(0.166-0.200) (0.186-0.227)1(0.207-0.255) (0.238-0.294) (0.262-0.328) 3-day 0.052 0.063 0.080 0.093 0.112 0.128 0.144 0.161 0.185 0.204 (0.048-0.057) (0.058-0.069) (0.073-0.087) (0.085-0.101) (0.102-0.122) (0.116-0.139) (0.129-0.156) (0.144-0.175) (0.164-0.202) (0.181-0.224) 4-day 0.042 0.050 0.063 0.073 0.088 I 0.100 0.112 0.125 0.143 0.158 (0.038-0.045) (0.046-0.054) (0.058-0.068) (0.067-0.079) (0.080-0.095) (0.091-0.108) (0.101-0.121) (0.112-0.135) (0.128-0.155) (0.140-0.172) 7-day 0.027 0.033 0.041 0.047 0.056 0.063 0.071 0.078 0.089 0.098 (0.025-0.030) (0.030-0.036) (0.038-0.045) (0.043-0.051) (0.051-0.061)1(0.058-0.069) (0.064-0.077) (0.071-0.085) (0.080-0.097) (0.087-0.107) 10-day 0.022 0.026 0.032 0.037 0.043 0.048 0.053 0.058 0.065 0.071 (0.020-0.023) (0.024-0.028) (0.030-0.034) (0.034-0.039) (0.039-0.046) (0.044-0.051) (0.048-0.057) (0.053-0.062) (0.059-0.070) (0.064-0.077) 20-day 0.014 0.017 0.021 0.024 0.027 0.030 0.033 0.037 0.041 0.044 (0.013-0.016) (0.016-0.019) (0.019-0.022) (0.022-0.025) (0.025-0.030) (0.028-0.033) (0.031-0.036) (0.033-0.039) (0.037-0.044)1(0.040-0.048) 30-day 0.012 0.014 0.017 0.019 0.022 0.024 0.026 0.028 0.031 0.033 (0.011-0.013) (0.013-0.015) (0.016-0.018) (0.018-0.020) (0.020-0.023) (0.022-0.025) (0.024-0.028) (0.026-0.030) (0.028-0.033) (0.030-0.035) 45-day 0.010 0.012 0.014 0.015 0.017 0.019 0.020 0.022 0.024 0.025 (0.009-0.011) (0.011-0.013) (0.013-0.015) (0.014-0.017) (0.016-0.019) (0.018-0.020) (0.019-0.022) (0.020-0.024) (0.022-0.026) (0.023-0.027) 60-day 0.009 0.011 0.012 0.014 0.015 0.016 0.018 0.019 0.020 0.022 (0.008-0.010) (0.010-0.011) (0.012-0.013) (0.013-0.014) (0.014-0.016) (0.015-0.018) (0.016-0.019) (0.017-0.020) (0.019-0.022) (0.020-0.023)1 1 Precipitation frequency(PF)estimates in this table are based on frequency analysis of partial duration series(PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90%confidence interval.The probability that precipitation frequency estimates(for a given duration and average recurrence interval)will be greater than the upper bound(or less than the lower bound)is 5%.Estimates at upper bounds are not checked against probable maximum precipitation(PMP)estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=35.3165&Ion=-78.6409&data=intensity&units=english&series=pds 1/4 5/25/23,7:57 AM Precipitation Frequency Data Server PDS-based intensity-duration-frequency (IDF) curves Latitude: 35.3165°, Longitude: -78.6409° Average recurrence 101 . . interval (years) �\ : � \�� — 1 72 10° - \\ — 5 cuci \ — 10 — 25 `o — 50 l0-1 - \ — 100 a — 200 d — 500 o_ _- � — 1000 10-2 - r . . 1 I . . I 1 I I 1 1 1 1 I I 1 c_ c_ c_ C C_ L >, >.rt >, a, > >, t,>. E E E E E ri A kb N v v vv 7 -o v v 77 i .�-� m I". 14'$ Duration NiNio N m v V) 101 - — - L_ L C Duration 10° c — 5-nun — 2-day a — 10-min — 3-day c 15-nin — 4-day 0 — 30-nin — 7-day ;° 10-1 — 60-min — 10-day a w — 2-hr — 20-day o` — 3-hr — 30-day — 6fir — 45-day 10-2 — 12-hr — 60-day I I i 1 I i i — 24fir 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NOAA Atlas 14,Volume 2,Version 3 Created(GMT):Thu May 25 11:57:01 2023 Back to Top Maps & aerials Small scale terrain https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=35.3165&Ion=-78.6409&data=intensity&units=english&series=pds 2/4 5/25/23,7:57 AM Precipitation Frequency Data Server \V:& Erwia itc0� 17 Si Si 9S �# • nn Jr�.J�'' 3km a 2mi ' Lar a scale terrain :on-Sal em 0 , • • Durham Greensboro • Raleigh •ockyMount \-1` • TH C A R O L I N A I •Greenville Q • Charlotte Fayetteville• I . Jacks. •✓ s 100km Wilmington Onslo k! • Bay, 60mi Large scale map 0 it -6 lem o Greensboro ! Durham ORocky Mount Raleigh North Greenville i Carolina ' arlotte MOM F teville 0 Jacks.Q \ o III 100km Wilmington fiimb 60mi Large scale aerial https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=35.3165&Ion=-78.6409&data=intensity&units=english&series=pds 3/4 5/25/23,7:57 AM Precipitation Frequency Data Server inston-Salem Greensboro Durham . Rocky Mount • Raleigh • Greenville North • Carolina. Charlotte Fayetteville 111 Jacksor 100km WI lmi nQtor umb 60mi Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring,MD 20910 Questions?:HDSC.Questions@noaa.gov Disclaimer https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=35.3165&Ion=-78.6409&data=intensity&units=english&series=pds 4/4 / 0E j 08 9 Ij /I , R0c 0 PAWN 82 \�_ \A\ SMH 1361 _\_ OB 38 INHAu SER \ RIM:1�69.47 \, C SMH a1511 lA ZONINGR SON 9j1 \�_ \� OUT IN 818D DIPIP IE161607 102 \ \\ RIM:176.96 rr" \_ pR_70 \��\ .3 PIN#7$ \'- • U6_ RIMH1�&ae l cPIN#5 _\'�_ \ '\_ oe szs,p�RANE 98U \ \\ (A)IN 8"PVC IE 170.02 .� ARY MAC N2'3Tj9-261 ��� ��\� ZONING Rl�p9 034 FUTURE \'-\ (B)IN 6'DIP IE 171.01 I O HD„,,, &Cq 2 _ ` \ /1N0 R, CONDITIONS 1%ANNUAL ��� OUT 8°PVC IE 169.90 el ZO e/46p,pC 4j RRrE I I \'� 2p FOOD HAZARD E CHANCEUAL FLOOD r (e) �_ NiNCR#1soo a S I \ \ \\ .\ .\ rn10'-\_ (GIs) HazaeD(cls) • 6'bla® r PIN o',ND R #15U6, /� \ Z 21r.1r 9391�" 617.63'TOTAL \ PIN#1506-79-3508 / NANO(JO Nso AAA8\�-\\x x ON RS LINE ,i\ \ \ \\\IRS j(jN• \ 38163' PIN/�1507 DONALD I.JOHNSON as JO e, ( \ N\�� \ JEAN R.WELLONS f- W ON DB 844,PG 739 92)pG HIySON x \ \ \\ \\ DB 3366 PG 1, i ZONING gR-110 ��Ie l 622 ZONNGR/p--_-__ 6/ \ \ L \\ \\ \\\ \\ \\\ - ERWIN FOAL 15 PER NCITY YOFDUNNEPROJ^ECT. # \ \ \ \ \ \ E-451-03 AND E 451-10 ii / gi \ \ \ i' �� \ \\ \\ \ ,N•\\\� ` RIMH 171:� DB 687. jf/�/ \ \ \ i' \ \ \ \ \ \\\ IN 18"DIP IE 1 SMH 1328 �� // \/ •'.I„ 1 T )- \ \ \\ \\\ \\\\ \��v \ OUT 18'DIP IE �% \ RIM:169.91 #1328 N=56925567 I \ , \ \N. \ \ \\ \\ \_1 IN 18 DIP IE'I61 51 SMH p1003 /� \ s \� \ \ \ \ \ \ \ _ - \ , OUT 18 DIP IE:161.47 E=2107319.72 RIM:178.75 I \ \ IRS l \\ \ \ \ \ \ __ __ NIS/BASEROVER IN 8"PVC IE'171.17 '/ \ \ \ \ \ \\ \ \_\ �` a -- ` \ 3JL OUT 8'PVC IE:171.14 ( \ \ \ \ i \ =- _ _ - p��E=2107319.70 � , _ ___ O EL=179.67 \ \ \ \ / \ \ -- - .e\n \\ - , SMH 1325 NLS/NETWORKI \ \ \ \ ----_ \ 1 \ /I \ V \ \ -----�\\\\ �,� \�\\\\\\\ RIM:169-69CO �� \ \ A_ Fri (a)w s°PVC le 16zaa \\ \ \\ \�_ � � _ (B)IN 1s"DIP le 16Ts9 OUT 18"DIP IE 161.51 �\ SRS(5) \ V A _ .3\ ' _ vsSu� 18,' ;� \ SMH#1052 fivil \ P V vV A v — _ ,v P� 7� - ___ 9G RIM.182.51 "�/ �' v v v y v v ! #��. o 4N INB"PVC IE:175.06 I N\ \ \ �\v/ \ _ — ��\\\�\\ �, _ o o N m Eo 0 m'9 OUR 8'PVC OUT IE: ost 7m \ \ \ \ \ - \ \N. I , __ ----6. s� --- w () m 15' \ v v EA5- I m ° w 3 9c�%� I \ --'�, \\ 1 PLAI p 11 a 0 A IRF(g.. _ _ v v \. �. \, I _8 SLID- 3 y 3 \ m S 05'4343" 143.67' (BENT) ' m m PRE-DEVELOPED EA RIGHARU O ALL 'N•.I, _ \VPIN#1506-79-5448 '�-^-tieLAT cne.cam, KAttA LEA ARNOLD Ar�ES&RALPH D.LUCAS \ SLIDE I27A DB 3943,PG 945 v �.�o,'� o6 -ROAp73 ,v o DRAINAGE AREA LOT,,,PLATGABG SLIDE 127n 10, i \ ZONING R-15� N\ ' ' g308 ZONNG` BENCHMARK:#100 \ I \ - _ - \ \ , ,IRON REBAR SET WITH " \ \ CAP ELEVATION=183.14 `,'i7� I m \ �- v \ • , V w .m 1 SMH g1074 'A \, \ l / CC RIM:183.64 V3 Ii - _ _ ON IRS(0 / / i Q v L vI W W i- _ I /PIN g1506-79-54 v I v _/ I /D DB 408gAPG 373` _ \ I V 500 ZONING R-10 A. �T 1 �V O (FULL OF DEBRIS) 5 A g K I ill CBgn52 I� 'p I �v v its O ¢OR:18645 / BOTTOM le 1e4.6t y e _ mom • • III. 0 w � It \ PIN#1506-79-8696__ -r ' gall - II - �` ___ -- MELODY Y.WEST --- Ll.l Ee (}����•; ry DB 4159,PG 1032 ' \03 - - - f4`.104, �140600 / \ �14,1 \`4 ZONING R-10 T1 \Z86- z \� -�--� 1 � �v _i\ \ �\ PIN oscAR�o8AY JOHNSON n cn Z I � " 8P.\ nrJ�onNsoN&- 1718,PG 840 LLJ in #1506-79-8959\ qn9 __ PIN cmoEE MUMfoao ZONING R-10 CC _ I i I \ 1 Z _- i \ v\I #1506-79-8966 \ DB 3947,PG 073 CL - - II , ANNIE LEE MELNN JJf _i,:---� 1 PIN#1506-79-8874 \ , PB 2003,PG 421 \ DB 4154,PG 675 GERARDO GODOY BARRERA& ,\ k117 II m I ��� j� 9,, \J i PB 2003,PG 421 - ZONING R-10 53 NOTE EA NOT SURVE D Z, RU1H MARIINEZ OUINIERO g115 p1\ ,\ DUE TOgANIMALS NOT IN AN yt 1 DB 3469,PG 651 i II ENCLSURV.o o m 's o,, \ i111 \ ZONING R-10 ^` o ZONING R-10 go' _ SMH g1524 APIN#1506-79-869§k ��,z§,o o rf', z , ` \ RIM:194.30 TERESA JEAN McOUEEN o , _ , a T IN 8°PVC IE:185.52� \ DB 1125,PG 406 I - o \ ___-� - OUT s°PVC le lasso I ' w1m _,-o - w�, - _-_ E �� ZONING R-,o Z' „_ NSON p" I \ _ COL�Oeca,eeToFwnv____________----------- PLAN m _ 0 33'PU pB 5.PGW I c4s8_ w -.T., - �r PRELIMINARY A %r DO NOT USE FOR w CONSTRUCTION STATUS GRAPHIC SCALE DATE DESCRIPTION xxx xXX XXX 50 15 50 co - J 1 200 DESIGN H SO' CHKD 9 - ll IMI SCALE H. ( INFEET) J0B No. 220124-01-004 1 inch= 50 ft. DATE , 2023 FILE No. SHEET Cad file name:V:\220124-Ben Stout Construction\220124-01-004(ENG)-Erwin Rood,Dunn,NC\Engineering\Engineering Plans\Canstmctioe D000ments\220124-01-004-DDO.dwg C It) H4u 8gj PO POST DEVELOPED �"201119 R4�602 " ON-SITE SIDEWALK POST—DEVELOPED TOTAL .v A7506 AREA z 0.19 AC � � ",NGBr oG<,o54 D „E7 \ R— A"°R °DIII°N�I� �ANNDaL DRAINAGE AREA 5.38 AC 6 1¢s 'N \\ �— 20 ANNUAL CHANCE N POST-DEVELOPED �,:;,,, (8,420 SF) �. ;o (cis, HAZARD 54, R GIB iit ON SITE PAVEMENT D�_; _ - v ` 9.3s',�€6,1.63' (234 269 SF) U > LINE -\ \ r 381.67 ,�25 \ �x ON LINE �— l— � A � RS /]/— AREA 0.58 AC �. .�8 ,-- — v 4, " . - \ \\\ \' .‘ ,.. \ 15'SANITARY EASEME (24,984SF) _ .‘ , 1 , i __,,,,,,._ PER CITY OF DUN PROJECT " \ N N, , \ 4,,„.____ CO __-- �\ \ / �/( \ \\ \ � 9 .......,, ,,;.__ __ _,__________.__ _____________:____, \ •, \ F461-03 AND E-461-IO 7 ,,,,, .,,,,, ,,,, \ ,„,,,,,,,,,,,,,„ ...,__. , , \„ ,, ,,, .. .. ... .. ... . .., -, - - ••• -- II�i ll li ,, II �,CNsJ 1 °tea ►. v v A v `� — ` ��� —� _ ___.......„___, _ ________ ......, ____,_ _....._ , _.;...,.......„___,,,, 1 „. \ \ 352.50'TOTAL \ W U r' ` _ -. --/— 111 ,7: _ 1 1-4 ./...., ,,, , , ,-,.- ,_.,:„,____.,' W j,,r_. -ti*.-`, " fl 9 PLAT CAB ca90 POST DEVELOPED ON SITE _ �,�� PLAT 7AC LOTSBUAAREAz1.13AC = � \ ' SN w 15'UTILITY IN#15 §EMEND RICHARD DALE ARNOLD& ' '� 1 \ 1 I\ 1 EAAT CAB.L� KAYLA LEA ARNOW CC I (49,41 0 SF) j I 1 ,- V SLIDE 127A DB 3943,PG 945 Q '`',� It\ " Y9 LOT 11,PLAT CAB C, .31 w POST DEVELOPED— .. w: � ��1 ', III vvv �3D6Za�RNOR DRIVE 0 D OFFSITE DRAINAGE ------ -�' ' 20'UTILITY s!I y. II 11 I I\ II ', EASEMENT CAB c, 0AREA 0.51 AC I 1 �' DE,27A9 1— _ EI o(22179 SF) 1 _ go �1 > / I - - -- ---- � 1 ___ _—__ o H z �, ai RFO Ci p I- cc • --- -� l / i I 18p� _ I I le l� '1s 731dzo5°E\ ( I IF j4 f II / II/ �s7sz'1 O I `: ` - �\\\ �\\dl \ JDB24184,PGS339C \ �. ' I�� I #II I%TT / 1 11 \ CA P II I` L Z PIN 1606 79 5869 ` 1010 I I r w Z LLJ r,,� \ / \ \\\ w - 'i lg1 RWIN ROAD ' v )�1 ZONI 'R-w nNOa-�e \\ _— —- �.^, i EIP N( v " PIN#507 0 7396 \ 10 z• - J�� �/{�/��- 1 7 Z O / CONCH I KAYLA J. HOEFT &NICHOLAS D 'V1 - ——— / a \183� \ : + ///� /\I T. HOEFT CO Q ��- a N. _ ..� DB 3683,PG 559 I ell.• _\ — POST DEVELOPED DT,3,PLATGABG, 0 - PIN#1506-79-8696_-____ eQ \ ,\ \ I fi J� s szzo'oa"E COLERIDGESLIDE,z7A CL MELODY Y.WEST moo? \ �. 5 #318 DRIVE 51.28'TIE DB 4,59,PG,G32 las \ ,gti9,.s° ONSITE DRAINAGE �`�, ZONING R-,G it #1406 f �� A J�— l£�9 ZONING R-10 _ o \s'lgs\ \ \ AREA 4.87 AC _ �� �v r1,v �� PIN (212,090 SF) "neon c�aNCE96 �� `O' #T 506-79-8959 ��� PIN JB 3201,PG 912 _' _ _ CYNDEE MUMFORD 1 z " 1 9 \ J\11 #1506-79-8966\ DB 3947,PG('. SOT 14,PLAT CAB C, \�' ��( [_____- \'� 1 11 PIN#1506-79-8874 ANNIE LEE MELNN pfl 7003.Pf SLIDE 127A Q\ 1 1 GERARDO GODOY BARRERA& DB 4154,PG 675 ,. N400 COLER DGE DRIVE ``''Q�PJ " NOTE. EA NOT SURVE>`�D ''.11 I1 RUTH MARTINEZ QUINTERO 1 pB 20#11 PG 4 ZONING R-,0 / G,V pF rySP / DUE IO NIMALS NO IN AN 11 DB 3469,PG 651 11 g115 " ' G't'O� j 1� ENCLaSUR�. 1� #111 70N�NC R-� ��Q���5 1 0 11 -p ZONING R-10 GQ yoQ S4 11 PIN#1506-79-869§ o �11 /� Q� PRELIMINARY T RESA JEAN MaauE N o 11� �111 o �� DO NOT '� oB nz5,Pc 406 ' " ' 07 gON DRIVE I ZONING R-10 z w CO OHN USE FOR Q 2 _ _ _ CONSTRUCTION F- o % o `S�PUBLPB SIPGTF.W AY QQrZz l A a_ F. PLAN STATUS -/-/23 GRAPHIC SCALE DATE DESCRIPTION ML RG XXX 50 25 50 200 DESIGN DRAWN 50 CHKD C`7 SCALE H. ( IN FEET) JOB No. 22 01 2 4-01-0 06 1 inch= 50 ft. DATE Dec 11, 2023 FILE No. SHEET Cad file name:V:\220124-Ben Stout Construction\220124-01-004(ENG)-Erwin Rood,Dunn,NC\Engineering\Engineering Plons\Construction Documents\220124-01-004-0DP.dwg RO EAH D4WN 1792 OB 3g8 Nh'A(/SER ZON . Ih602 c Z/ ` \ \ /'/ L_� \AND R-20 '� \\\\ Pl BR 7$ I `-980 \ os_ PN _ s2s, ANF _ 111111 /i 'Lg.: G4RY, Og_ \__ \_ ZO _l6 PG 054 i MAC 29_26 NING R- 04 FUTURE l e/ Og/46p ACT&CARRE `mac \\\ '0 AND R_20 ANNUALICONDITIONS 1%AN ANNUAL LOOD \ / �- FLOOD HAZARD ZONlN6 RIllBpO 4)q 7 S( __1 1 \ \ \ \\ NNE\ SSL10 �_, (GIS) HAZARD(GIS) �� s� �`- P `__ RAND R-20 / .. 1 a \- N \ \ \ �, I IN 1l1506, \ _ /� - _. I 1, :.00 ` 'c 939'1�"E.,611.63'TOTAL PIN p1506-79-3508 / N4Nc'WJONN9pN 5S8\--��*" oN UNE 1— �i, — �- \ IN. +r ///\' PIN#1507-70-0683 DONALD L JOHNSON 0g „ & ( \ f _-- 38163' I JEAN R WELLONS FARM,LLC DB 844,PG 739 92I PC HNSpN �� \ \ \ \\ \\y' / DB 3366,PG 149 µ1508 1/ Zp'�I570 6� .f T \ i - - v V A v � 15'SANITARY SEER EASEME/ ERWIN ROAD t PER CITY OF DUNN PROJECT: ZONING R-10 __ __ NEN R-l0- % > \ L i \ \ �\ \ \\'. 1777,.... , E-451-03 AND E-451-10 ZONING R-20 17 \ \ \ DB 687,PG 719 oit fV/ /O. \ v IR .1 \ / vv vvv v vv� I v ,:�__- ' I _� �� I .� 3-=� T. N Av - Ra s921'S1°E /1/t g ' \ \ - -' �;_ 35250 TOTALA ,-;(g...B,,,,, %.,,N, :°--° /, I� / i'l rI.ICI"--r-gand: 661 -04.0.\—_ .________( \- ---- i_iu -- 1 iii _ ' .- <P ', -,-: -' \ 12:1 / it,------ -........... -_ z m _ m m t Geo63�9 21 \\ $ �, m \ l `` "�,40 t ,\I \\ , ' 5. z °a° n w v 3 z ��"9 I1� I . A IRF •3)vv , v/v - t��� I 1 I 3 ' ¢ a v� �1 I�a-� .: ,.. new.,.,.��R�e......4) / / \ ilir I II 11 , Ea REAP)DALL Aallo,D m m •'' w ArI V• (45 \PIN#1506-79-5448 / / 1 1 I ""�BLAT cn8.cam, KAYLA LEA ARNOLD / \ PIES&RALPH D.LUCAS \ / , \\ - \— SLIDE I27A DB 3943,PG 945 \ I LOT 11,PLAT CAB C, �' \ DB 4084,PG 373 Y \ \ , SLIDE 127A »° •�� 4 €RVNPL ROAD ' / / �\ \ \ I I p3O8 THORNDA �.� " �� \ ZONING R-,5--/ / _ I 1 zoNlNc• Q CAP ELEVATION-18100 u 1 11•4. d /. ;• I I I I W II 3 14 BENCHMARK q,00 1 IRON REBAR SET MTH T/ 1 $h ®- - ,II /v / ��- v I I Q 1�`t , --/--___._ .. -,.. .7.7----__„,,, �+. -..,LION IRS(,: �j / I�� --ne----- ---� �/ I I I I ,.. — } PIN g15o6-79-Sa v "' p0 I / I 1 / 1 1 I I iI H DARE.a ;4Iw1 �� / �, i. I r Q �/] DB 4084,PG 373`� �� ___ / / ' I 12F(.g4 60 gi soo I�q / I rxBB_ \ II I 11 W O ZONING R-10 . �°r \ III A� ' i f I -� �I K A c I • o i \BZ� PIN#1.06-79-5869 \ ' I I I IRi 'H=' s�� , I =r' - J2M2 oLDINGS.LLC I I I F (FULL OF DEBRIS) e/ J I N.y \ \ L l - 1717 -\DB 4184, G 339 (n il.l BBB \ 1 RMN ROAD S CC Z CB#1152 I 1 v A - - �' �BZv v ZONI-R-10 AND-R-20 0 GR:18645 / Si1 1 \ \ .l.• --� ^\ A•EA.9.04 ACRES H CC BOTTOM IE 184-63 i IIII 7r� \ \ _ 3 6� 3� --- --- I \\ \ K } 0 y / \ ally\'+day., �t- \ -=_ i 1 \ \/NJ \\ . \\ .,, ✓,r.�• ^, �� CO U 2 1 = m 5 Y1� t�'�.,,, PIN#1W�79-8698______ \'��\ �\ \\ I / / / J S52'2004 E� 318 GOLSLIUERIDGEADRIVE II i1 p.l _ MELODY Y.WEST \� \ \ / / r p O D .�n \ t l / 61,PD'TIE • (K;[g�\5 DB 4159,PG 1032 By \ \ / ZONING R-10 1 / �I,U11orM till ZONING R 10 \l86\2 \ ��\ I / / / = O z m _ y � ` - �1 RN#LE JOHN 0 8049 tip Z v •. A ^SCAR DALE JOHN70 �I_ _ r\ \ =i '� KAY JOIIN" > Z -�� v �', A \ PIN DB 1718,E PIN#1507-70-7396 L.L1 _ \ I #1506-79 "11` RICHARD D.CHANCE PIN CYNDEE EMI 'DING R DB 3201,PG 912 CI m I '_!-�I I 1 Z _ -. /I -7- \ II #1506-79-89.. I pB 3947,PG iT 14,PLAT CAB C, I i..- 'I PIN#1506-79-8874 ANNIE LEE MEAN I PB 2003,Pc SLIDE+27A �� Q. r^ DB 4154,PG 675 I 117 Q v J I-"-� I !� ''-p III IJ GERARDO GODOY BARRERA& I pB 2003,PG 421 ZONING R- / �/OF�ry�P m NOTE EA NOT SURVE D Z I RU111 MARIINEZ QUINTERO 175 G' 'S O DUE TO-AANIMALS NOT IN AN yt I DB 3469,PG 651 N �Q O�C ^ II I ELIGI SURV.o o 1 5,1 A I \ #111 \ ZONING R-1: / `,Q`�QO. TII ZONING R-10 Q\<QJt OP0 I..L II PIN#1506-79-869§k II%z�,'So z 'I G .A_,t TERESA JEAN A/QUEEN III POST-DEVELOPED BYPASS II I DB 1125,PG 406 3 I - I =--- ___-� I g107 � �� � W II ZONING R-10 Z I S01,1 pFWE I I °`3�° 40I00506481 DRAINAGE AREA 3.56 AC (154,841 SF) PRELIMINARY LLI IF, -- DO NOT __ -'--- USE FOR CONSTRUCTION PLAN STATUS _/_/23 GRAPHIC SCALE DATE DESCRIPTION ML RG XXX 50 15 50 100 300 - J DESIGN H 50RAWN CHKD 9II ll SCALE V. IMI ( INFEET) JOB No. 220124-01-006 1 inch= 50 ft. DATE Dec 11, 2023 FILE No. SHEET Cad file name:N\220124-Ben Stout Construction\220124-01-004(ENG)-Erwin Rood,Dunn,NC\Engineering\Engineering Plans\Construction Documents\220124-01-004-DDP.dwg 1LV I•N'1IJ11JYN n' U.S. Fish and Wildlife Service National Wetlands Inventor Wetlands Inventory Map - ''' "iir, t %, 77 1 ii , .,_,,.. 1 t,,.! ....4 •.•• . ,,... \ ,...4., ,, ..,-. f 1 ... I " 1 '', Ikt.j .' Ali':. •- :: 0 .-- '''''i# ..Y..• % te. , ,, .,,,, ., .•, 4, .44, . t , „:. J. .• .2.A f 4 1 — y14' -'.ram �'*A-t.t• }}, r. 1 4 • war <_ V's'i .f *, 1 • -i 1 "IT 1_1. 104. V 4-•-i,„ . -,• - i PF01C PFO1A f 3101 .c 13�'� 1 t. ..- w ; Vaigult 1,._ 41. 4 i 1 •tt.iiit4 -%. .' -'. f s , t i t-' ; • -. -' ‘4‘ ii4 Le-ei-i'd; '2%. ‘ 1$ ,T'..., '19.16'.. ��� ` • • p J ' _, .. 4`, . t i v•s (4(40.44 ' .�« • J • iti.. ..--;•• • . '. "jk 1 O. I 14ir:"' yllr - . 7-.4, . ;41., ,... ....... .lii 4 . 1 14 . it 0r ... , , -...4 4 l 1, ' . i• ji, s-.. li ._,, . ____ 0 0.03 0.06 0.12 mi4 . . to - �n • • - 1 S S I, I i U.S.Fish and WildlifeService,National Standards and Support Team, 0 0.05 0.1 0.2 km i• Ill ' wetlands team@fws.g_y y+t 101. July1 0, 2023 This map is for general reference only.The US Fish and Wildlife Service is not responsible for the accuracy or currentness of the Wetlands base data shown on this map.All wetlands related data should Freshwater Emergent Wetland Lake be used in accordance with the layer metadata found on the Wetlands Mapper web site. Estuarine and Marine Deepwater Freshwater Forested/Shrub Wetland n Other Estuarine and Marine Wetland I Freshwater Pond n Riverine I National Wetlands Inventory(NWI) This page was produced by the NWI mapper Bowman [Von7Fl .9 kTUL!NA APPENDIX B Stormwater Wetlands Calculations CN Values Time of Concentration Calculations Wet Pond Design, Hydrographs, and Details Grass Channels Spread Calculations Erwin Road Residential—Dunn, NC 9 I P a g e Bowman North Carolina, Ltd. Curve Number Calculation (CN) Pre-Developed Conditions(Overall Site) Drainage Area(acres): 8.74 Existing Soil Groups: Soil Group Map Symbol Soil Description Acres Percent of DA A/D Bb Bibb soils 1.18 14% A NoB Norfolk loamy sand 5.16 59% A NoC Norfolk loamy sand 2.40 27% Existing Land Uses: Land Use Description Existing Soil Group Acres Curve# Weighted CN Open Space- Fair A 1.00 52 5.9 Open Space-Good A 0.35 55 2.2 Wooded -Good A 7.32 53 44.4 Impervious A 0.07 98 0.8 Cumulative Curve#= 53.3 Bowman North Carolina, Ltd. Curve Number Calculation (CN) Post-Developed Conditions(Wet Pond) Drainage Area(acres); 5.38 Existing Soil Groups: Soil Group Map Symbol Soil Description Acres Percent of DA A/D Bb Bibb soils 0.74 14% A NoB Norfolk loamy sand 3.66 68% A NoC Norfolk loamy sand 0.98 18% Proposed Land Uses: Land Use Description Existing Soil Group Acres Curve# Weighted CN Impervious A 2.41 98 43.9 Open Space-Good A 2.97 55 30.4 Cumulative Curve#= 74.3 Bowman North Carolina, Ltd. Curve Number Calculation (CN) Post-Developed Bypass Conditions(Wet Pond) Drainage Area(acres): 3.56 Existing Soil Groups: Soil Group Map Symbol Soil Description Acres Percent of DA A/D Bb Bibb soils 0.45 13% A NoB Norfolk loamy sand 1.69 47% A NoC Norfolk loamy sand 1.42 40% Proposed Land Uses: Land Use Description Existing Soil Group Acres Curve# Weighted CN Open Space-Good A 1.08 55 16.7 Wooded -Good A 2.48 53 36.9 Cumulative Curve#= 53.6 IMPERVIOUS SUMMARY TABLE ON-SITE AREA = 393,826 SF (9.04 ACRES) LOTS 49,410 SF 1.13 ACRE(S) 12.55% OF AREA PAVEMENT 24,984 SF 0.58 ACRE(S) 6.34% OF AREA SIDEWALK 8,420 SF 0.19 ACRE(S) 2.14% OF AREA EXISTING IMPERVIOUS AREA 0 SF 0 ACRE(S) 0% OF AREA TOTAL IMPERVIOUS AREA 82,814 SF 1.90 ACRE(S) 21.03% OF AREA GREEN/OPEN SPACE 311,012 SF 7.14 ACRE(S) 78.97% OF AREA INCREASE IN IMPERVIOUS AREA 82,814 SF 1.90 ACRE(S) 21.03% OF AREA TIME OF CONCENTRATION Existing Conditions SCS Methodology OPEN CHANNEL SHALLOW CONC FLOW: FLOW: TOTAL SHEET FLOW: SEGMENT 1 SEGMENT 1 Manning's Equation: Tc=(0.007(nL)^0.8)/(P2^0.5)(s^0.4) 2-year/24-hr Tc=L/60'V V=1.49Rv'aS'n/n Basin Comments Length Elevt Elev2 Slope Rainfall Depth Manning's T, Length Elev2 Elev3 Slope Condition Vavg Teo Cross Sectional Wetted Perimeter Hydraulic Radius Length Elev3 Elev4 Slope Manning's V Tv TcTOTeL Tc(minimum) Tlag Basin (ft) (fl/ft) TP-40(in) "n" (min) (fl) (fUB) TR-55 Fig.3-1 (ft/sec) (min) Flow Area(fl^2) (ft) (ft) (ft) (ft/ft) "n" (fps) ((nin) (min) (10 min) 0.6*Tc(hrs) 1 Stream 100 189.19 186.18 0.030 3.71 0.24 11.25 637 186.2 164.95 0.03333 Unpaved 2.95 3.60 14.85 14.85 0.15 1 7/720234:00 PM G:WYORO5rojects\TlmeConapunn Erwin Rd.Ss Proposed Wet Pond Project Information Project Name: Erwin Road Residential Project#: Designed by: RG Date: 8/18/2023 Revised by: RG Date: 12/18/2023 Checked by: Date: Site Information Sub Area Location: Drainage To Proposed Wet Pond Drainage Area (DA) = 5.38 Acres 234,269 sf Impervious Area (IA) = 2.41 Acres 104,993 sf Percent Impervious (I) = % 44.82 °A) Required Surface Area Permament Pool Depth: 3.92 ft Non-Coastal County SA/DA= 1.39 Min Req'd Surface Area = 3,258 sf(at Permanent Pool) Required WQv Storage Volume Design Storm = 1 inch Non-Coastal County Determine Rv Value = 0.05 + .009 (I) = 0.453 in/in Storage Volume Required = 8,854 cf(above Permanent Pool) Elevations Top of Pond Elevation = 174.60 ft Temporary Pool Elevation = 172.20 ft Permanent Pool Elevation = 170.10 ft Shelf Begining Elevation = 169.60 ft Forebay Weir= 169.00 ft Shelf Ending Elevation = 170.60 ft Bottom Elevation = 164.60 ft Permanent Pool Area Area @ Top of Permanent Pool = 4,370 sf Volume of Temporary Storage = 17,138 cf Is Permenant Pool Surface Area Sufficient(yes/no)? Yes ( 4370 > 3258 ) sf Volume of Storage for Design Storm = 17,138 Yes ( 17138 > 8854 ) cf Incremental Drawdown Time STORMWATER POND INCREMENTAL DRAWDOWN METHOD-Water Quality Volume Project Information Project Name: Erwin Road Residential Project#: Designed by: RG Date: 8/18/2023 Revised by: RG Date: 1/2/2024 Water Quality Orifice Incremental Determination of Water Quality Volume Drawdown Time I Zone 3 Q3=0.0437 CD*D2(Z-D/24-Ei)^(112) Jr Zone 2 Z 0 Q2=0.372 CD*D*(Z-Ei)^)3/2) I Zone 1 Q1=0 1 Orifice Diameter(D)= 1.3 in Cd= 0.6 Ei= 170.1 Orifice Inv. Zone 1 Range= 0.00 to 170.1 Zone 2 Range= 170.1 to 170.2 Zone 3 Range= 170.2 to 172.2 Incremental Drawdown Method Contour Incremental Drawdown Countour Area Volume Stage,Z Zone Q Time sq ft cu ft ft cfs min 170.10 6,140 0 0.00 2.00 0.000 -- 170.60 7425 3,391 0.50 3.00 0.030 1,910 171.00 7960 3,077 0.40 3.00 0.041 1,258 172.00 9520 8,740 1.00 3.00 0.060 2,420 172.20 9780 1,930 0.20 3.00 0.063 508 Total -- 17,138 -- -- -- 6,096 Drawdown Time=Incremental Volume/Q/60sec/min Summary Total Volume= 17,138 cf Total Time= 6,096 min Total Time= 4.23 days Between 2&5 1/2/2024 Wet Pond-new design-Dunn Erwin.xls 1 of 1 Project: Pond #1 Date: 8/18/2023 Main-Pond Contours-Volumes Elevation Main-Pond Incremental Vol. Accumulated Vol. Description 170.1 4,370 1,995 14,336 A2 (Perm_Pool) 169.6 3,610 2,079 12,341 Al (Bottom_Shelf) 169 3,320 3,078 10,262 168 2,835 2,615 7,184 167 2,395 2,185 4,569 166 1,975 1,780 2,384 165 1,585 604 604 164.6 1,435 0 0 A3 (Bottom_Pond) Forebay Contours-Volumes Elevation FB1 FB2 FB3 Total-Areas Incremental Vol. Accumulated Vol. 170.1 1,620 1,620 724 2,411 169.6 1,275 1,275 718 1,687 169 1,120 1,120 401 969 168.6 885 885 568 568 167.6 250 250 0 0 Forebay Volume 16.8% *Between 15% &20% Average Depth (Option 1) 3.42 *At least 3' average depth Average Depth Calculation (Option 2) Vpp 14,336 permeter of shelf 267 Length of PPE at main pond only width of shelf 3 Al (Bottom_Shelf): 3,610 Average Depth = 3.92 Proposed Wet Pond #1 Project Information Project Name: Erwin Road Residential Project#: Designed by: RG Date: 8/8/2023 Revised by: RG Date: 1/2/2024 Checked by: Date: Site Information Sub Area Location: Drainage to Proposed Pond Drainage Area (DA) = 5.38 Acres Impervious Area (IA) = 2.41 Acres Percent Impervious (I) = 44.82 % (Drainage Area) Orifice Sizing Orifice Size = 1.30 in (Diameter) Drawdown Time = 4.23 days (Incremental Draw Down Method) less than 5 days (yes/no) ? yes greater than 2 day(yes/no) ? yes Anti-Flotation Device 4' x 4' Outlet Structure Area: 16.0 sf Volume: 160.0 cf (Water Displaced -Top of Pond to Bottom of Pond) Weight: 9984 lbs Factor of Safety 1.20 WT Req'd of Anti-Flotation Device: 11,981 lbs Volume of Concrete Req'd: 79.9 cf (Unit WT of Concrete = 150 pcf) Volume Provided: 86.0 cf (4'x4' riser x 2' =32cf, 6'x6'footing x 1.5' =54cf) STAGE/STORAGE TABLE STAGE(FT) ELEVATION (FT) CONTOUR AREA INCREMENTAL TOTAL STORAGE (SF) STORAGE(CF) (CF) 0.0 170.1 6140 0 0 0.5 170.6 7425 3391 3391 0.9 171.0 7960 3077 6468 1.9 172.0 9520 8740 15208 2.1 172.2 9780 1930 17138(WQV) 2.9 173.0 10835 8246 25384 3.9 174.0 12210 11523 36907 4.5 174.6 13060 7581 44488 iSTORMWATER MANAGEMENT DESIGN WET DETENTION POND: RIVER BASIN: CAPE FEAR RECEIVING STREAM: BLACK RIVER STREAM INDEX: 18-68-12-1 STREAM CLASS: C;Sw HUC: 0303000601 PROJECT COORDINATES: 35.314454N, -78.6398901N POND DESIGN SUMMARY DRAINAGE AREA TO POND: 5.38 ACRES SITE IMPERVIOUS AREA TO POND: 1.90 ACRES OFF-SITE DESIGN IMPERVIOUS AREA TO POND: 0.51 ACRES TOTAL DESIGN IMPERVIOUS AREA TO POND: 2.41 ACRES PRE-DEVELOPED POST-DEVELOPED POST DEVELOPED POST DEVELOPED POST DEVELOPED TO POND TO POND THROUGH POND BYPASS COMBINED DRAINAGE AREA: 8.74 AC 5.38 AC 3.56 AC CURVE NUMBER: 53.3 74.3 53.6 TIME OF CONCENTRATION: 14.9 MIN 5 MIN 10 MIN 1.0" STORM EVENT: 0.055 CFS 0.005 CFS 1-YEAR STORM EVENT: 0.396 CFS 8.720 CFS 0.060 CFS 0.205 CFS 0.265 CFS 2-YEAR STORM EVENT: 1.968 CFS 12.88 CFS 0.267 CFS 1.004 CFS 1.271 CFS 10-YEAR STORM EVENT: 11.08 CFS 26.01 CFS 4.735 CFS 5.399 CFS 10.13 CFS �100-YEAR STORM EVENT: 33.28 CFS 50.22 CFS 16.38 CFS 15.88 CFS 32.26 CFS j 1 `�\\ \ \S$B�RIe`RA� j6J ' — \ �AY iGEiR \ \ RIP-RAP APRON## \ y \\ Toe OE#18AN RIP-RAT2--- REFER TO DETAIL ON / \\\ •`-\ \ �V=1�4,6REFER ON SHEET C6.1 fOR / \\\ \ \ 5 1EN(NCESHEETCONSTRUCTION // �� - \�\ �� \\ ——— ——-� CONSTREQUIREMENTS / // // 1 ; \\\ \\\ �� EQUI / // // / / 1 i�A y \�9' 1\ TROL iiir . \STR T REN REFER TO 5 _17 / // ��1 / /�,// ::.:..,••�\\\ 7 3,�\ \� ��QILS 1FH�,S�HEET INLET PIPE WITH I T-4 • ire..- � � 2:..\.�- \a•` \.%ii; \sue s /,— RIP-RAP APRON �� A�,y,:.zis{yy-9? \ '6 _ \ --- RIP-RAP ri s.� \ 6 1 \ _ _ Or ---4„.*Ac .... A\--,_. ... ...--- , . 0 i it. ,..._ \ .:0 . " . , ,, . , ,!/ e:„„.irsiif --- Al _ v__ . ..___ ......,.. _ ...... _, \, ...„ _ ,c,'Iii, si. .$,\,,.. , tio.,„„,.._ \ ‘ , .0, , , `,,,,--\ ,t. i, ,,, _ _ _ .,. - / N �/ %� L.:�j\ °':: °: N. o,/ / i/\ 1Re OUTLET PIPE 1 . REFER p \ \ i ____ . ,,,,, . i � \17. 173 �� � ..- o°j/ /' � GRADING PLAN \ t \% N� • 1 ., . S0� AREA AdpVE \ t \1 -al .. . `� NORMAL POOL \ -` 411101rA �� I ELE TION ' 1 ! V LITORAL SHELF AREA `m,,, 1 v 1 ` ? (SHALLOW WATER)=730 SF, � LITORA.SHELF AREA : ro (TEMPOR•:Y INUNDATION)=796 , " \ I\ REFER TO DETAIL ON THIS ; 1 A MAIN POND SF, REFER DETAIL ON THIS \SHEET FOR PLANTINGS N SHEET FOR P •NTINGS v 1 1 til; 1\ i1 \ 1 1 1 \ I I I t•1 /' 2 , \ ' I PLAN VIEW GRAPHIC SCALE 30 0 15 30 60 120 ( IN FEET ) 1 inch = 30 ft. 5' EMBANKMENT WIDTH 6'TOPSOIL FOR AU. AREAS ABOVE THE TRASH RACK NORMAL POND ELEVATION REFER TO DETAIL THIS SHEET Q 5 , >VXV//// 8'HDPE WITH WATER TIGHT SEAL IPE TO BE BEDDED TOP OF EMBANKMENT ELEVA110N=174.6 ER DIRECTION OF 6'TOPSOIL ABOVENGINEER 3 6"CLAY LINER REFER TO DETAIL 100 YEAR STORM ELEVATION=174.52 6'CLAY SOIL ON LITTORAL SHELF INFOR CREMENTAL 1 LINER ON INSIDE 3 HEI FACE OF 10 YEAR STORM ELEVATION=17294 EMBANKMENT - 1 6 CON PRECAST IS a 6FT LITTORAL 1 f CONCRETE RISER 2 YEAR STORM ELEVATION=172.33 SHELF _ (INSTALL STEPS AS NECESSARY) 1 YEAR STORM ELEVATION=171.98 NV.1699 r 1.0-IRON STORM ELEVATION=170.17 �� fJ 0 NORMAL POND ELEVATION=170.1 '' . y L- PVC ELBOW 3'MIN !. ,.:•.• SEE DETAIL \1 ELEV=167.9 2 NOTE: PUMPS SHALL BE USED TO DRAIN - 1 THE POND WHEN NECESSARY. REFER TO DETAIL 1 L. -- w _ THIS SHEET FOR DEWATERING REQUIREMENTS. -° 4'NIN. I ASTM C-923 SEAL — KEY BETWEEN BARREL&RISER. CUTOFF TRENCH RISER BASE TO BE FILLED BOTTOM OF POND(TOP OF SEDIMENT STORAGE)=164.6 PATH CONC.TO INVERT OF ) APPROXIMATE SIZE BARREL CONCRETE SHALL BE PLACED IN RISER AFTER EXCAVATE AND BACKFILL 8'BASE.PRONDEG ANGLE(A7T.REQUIRED) RISER AND ANGLES ARE SECURED —I N`I� (BOTTOM OF SEDIMENT STORAGE)=163.6 IWTH COMPACTEDTO BASE AND RISER. ..1.....4.12.... -- -- -- -- -- - STRUCTURAL FILL AS 2-A307 'J'HOOKS 3/4"DIA.X 12'LONG FROM ANGLE TO BASE a` ./ ANGLE TO BE FIELD COATED NTH ZINC RICH PAINT AFTER - -- -- -- -- / DIRECTED BY GEOTECHNICAL CONSTRUCTION.'J'HOOKS TO BE PLACED UNDER LONER REINFORCING ENGINEER STEEL 6'CLAY SOIL e'xrx1.5 CONC.BASE REINFORCE WITH/4 BARS AT 12'O.C.TOP UNER AND BOTTOM OF EACH DIRECTION PROVIDE 3'MIN.CLEARANCE MAIN P00L _ 62'-18'HDPE 0 0.655 BETWEEN EDGE OF CONC.AND STEEL REINFORCING. PROFILE OF WET POND DETENTION SYSTEM SCALE: N.T.S. 6"TOPSOIL FOR ALL AREAS ABOVE THE NORMAL POND ELEVATION FOREBAY BERM FOREBAY TOP ELEV=171.6 WIDTH AT TOP=2.0 FT 6"TOPSOIL ABOVE 6"CLAY LINER 3:1 / NOTE:PUMPS SHALL BE USED TO DRAIN EXISTING GRADE=175.Of ON LITTORAL SHELF -/�1/��'''' ' SEDIMENT STORAGEOP THIS SHEET FOR DEWATERING REQUIREMENTS.THE FOREBAY MEN NECESSARY. REFER DETAIL , 6FT LITTORAL 6:1 / -I '��,, FOREBELEV BOTTOM 6 3 //�i SHELF / I ''� NORMAL POND ELEVATION // 2 -- /A., -I ,1� BOTTOM LITTORAL SHELF ELEV. tl ASS B RIP-RAP OVER FILTER _ FABRIC MIN.4'FOREBAY - WEIR AT ELEV=169.0 -4111*4k11#'-" lirr,' - 711 . 6"TOPSOIL FOIL ALL FOREBAY ENTRANCE SHALL BE AREAS ABOVE DIE DEEPER THAN FOREBAY EXIT NORMAL POND ELEVATION L BOTTOM OF SEDIMENT STORAGE/EXIT BOTTOM OF SEDIMENT ELEV=167.1 STORAGE/ENTRANCE ELEV=166.6 FOREBAY ENTRANCE SHALL BE FOREBAY DEEPER THAN FOREBAY EXIT REMOVABLE TRASH RACK 4"PVC SCREW CAP RISER STRUCTURE EMERGENCY WEIR `�„` FOR CLEANING ACCESS ELEV=172.8 INTERMEDIATE WEIR INII ■ ELEV=172.2 12"MIN. EXTEND 4" PVC THROUGH hiik. RISER STRUCTURE 4"x4"PVC TEE PERM.POND ELEV.170.1 7fINSTALL 4"PVC SCREW CAP AT END OF TE 4"OPENING CORED INTO AND DRILL 1.3'DIA. SIDE OF PRECAST HOLE INTO PVC CAPE STRUCTURE AT ELEV=170.1 INV=170.1 OUTLET PIPE 12"MIN. INV=169.9 4'DIA.OPENING SECTION B—B PVC DRAIN OUTLET SCALE: N.T.S. TOP OF STRUCTURE NOT SHOWN FOR CLARITY Top OF 8t7R` (REMOVABLE TRASH RACK) /1?B Spop. MFDIq KFIR`1722 OUTLET CONTROL STRUCTURE-INCREMENTAL WEIR SCALE: N.T.S. 1 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 0.396 2 732 5,177 BMP Pre-Developed 2 SCS Runoff 8.720 2 718 17,503 BMP Post-Developed 3 Reservoir 0.060 2 1444 14,146 2 171.98 15,058 Post Through Pond 4 SCS Runoff 0.205 2 728 2,323 Post Developed-Pond Bypass 6 SCS Runoff 0.055 2 360 462 BMP Post-Developed 7 Reservoir 0.005 2 366 357 6 170.17 441 1.0-in Storm Thru Pond Wet Pond-Dunn Erwin.gpw Return Period: 1 Year Tuesday, 01 /2/2024 2 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,01 /2/2024 Hyd. No. 1 BMP Pre-Developed Hydrograph type = SCS Runoff Peak discharge = 0.396 cfs Storm frequency = 1 yrs Time to peak = 732 min Time interval = 2 min Hyd. volume = 5,177 cuft Drainage area = 8.740 ac Curve number = 53.3 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 14.90 min Total precip. = 3.05 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Pre-Developed Q (cfs) Hyd. No. 1 -- 1 Year Q (cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 ' 0.30 ■ I 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 111.111111 0.05 0.05 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,01 /2/2024 Hyd. No. 2 BMP Post-Developed Hydrograph type = SCS Runoff Peak discharge = 8.720 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 17,503 cuft Drainage area = 5.380 ac Curve number = 74.3 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.05 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Post-Developed Q (cfs) Hyd. No. 2 -- 1 Year Q (cfs) 10.00 - 10.00 8.00 8.00 6.00 I 6.00 4.00 - 4.00 2.00 I 2.00 I . 0.00 - ► '- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,01 /2/2024 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 0.060 cfs Storm frequency = 1 yrs Time to peak = 1444 min Time interval = 2 min Hyd. volume = 14,146 cuft Inflow hyd. No. = 2 - BMP Post-Developed Max. Elevation = 171.98 ft Reservoir name = BMP Pond Max. Storage = 15,058 cuft Storage Indication method used. Post Through Pond Q (cfs) Hyd. No. 3 -- 1 Year Q (cfs) 10.00 — 10.00 8.00 8.00 6.00 6.00 4.00 - 4.00 2.00 2.00 0.00 —. Ilt - 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 3 Hyd No. 2 111111111 Total storage used = 15,058 cuft Pond Report 5 Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,01 /2/2024 Pond No. 1 - BMP Pond Pond Data Contours-User-defined contour areas.Average end area method used for volume calculation. Begining Elevation= 170.10 ft Stage/Storage Table Stage(ft) Elevation(ft) Contour area(sqft) Incr.Storage(cuft) Total storage(cuft) 0.00 170.10 6,140 0 0 0.50 170.60 7,425 3,391 3,391 0.90 171.00 7,960 3,077 6,468 1.90 172.00 9,520 8,740 15,208 2.10 172.20 9,780 1,930 17,138 2.90 173.00 10,835 8,246 25,384 3.90 174.00 12,210 11,522 36,907 4.50 174.60 13,060 7,581 44,488 Culvert/Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise(in) = 18.00 1.30 0.00 0.00 Crest Len(ft) = 1.30 14.70 0.00 0.00 Span(in) = 18.00 1.30 0.00 0.00 Crest El.(ft) = 172.20 172.80 0.00 0.00 No.Barrels = 1 1 0 0 Weir Coeff. = 3.33 2.60 3.33 3.33 Invert El.(ft) = 169.90 170.10 0.00 0.00 Weir Type = Rect Broad --- --- Length(ft) = 62.00 0.50 0.00 0.00 Multi-Stage = Yes Yes No No Slope(%) = 0.65 1.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000(by Contour) Multi-Stage = n/a Yes No No TW Elev.(ft) = 0.00 Note:Culvert/Orifice outflows are analyzed under inlet(ic)and outlet(oc)control. Weir risers checked for orifice conditions(ic)and submergence(s). Stage(ft) Stage/ Discharge Elev(ft) 5.00 175.10 4.00 ....0"....°7 174.10 3.00 �- 173.10 2.00 172.10 1.00 171.10 0.00 170.10 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 Total Q Discharge(cfs) 6 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,01 /2/2024 Hyd. No. 4 Post Developed - Pond Bypass Hydrograph type = SCS Runoff Peak discharge = 0.205 cfs Storm frequency = 1 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 2,323 cuft Drainage area = 3.560 ac Curve number = 53.6 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 3.05 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Developed - Pond Bypass Q (cfs) Hyd. No. 4 -- 1 Year Q (cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 1 0.20 0.15 - 0.15 0.10 0.10 0.05 0.05 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) 7 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,01 /2/2024 Hyd. No. 6 BMP Post-Developed Hydrograph type = SCS Runoff Peak discharge = 0.055 cfs Storm frequency = 1 yrs Time to peak = 360 min Time interval = 2 min Hyd. volume = 462 cuft Drainage area = 5.380 ac Curve number = 74.3 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 1.00 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 BMP Post-Developed Q (cfs) Hyd. No. 6 -- 1 Year Q (cfs) 0.10 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 1 - 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 — I ,— 0.00 0 60 120 180 240 300 360 420 Hyd No. 6 Time (min) 8 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,01 /2/2024 Hyd. No. 7 1.0-in Storm Thru Pond Hydrograph type = Reservoir Peak discharge = 0.005 cfs Storm frequency = 1 yrs Time to peak = 366 min Time interval = 2 min Hyd. volume = 357 cuft Inflow hyd. No. = 6 - BMP Post-Developed Max. Elevation = 170.17 ft Reservoir name = BMP Pond Max. Storage = 441 cuft Storage Indication method used. 1.0-in Storm Thru Pond Q (cfs) Hyd. No. 7 -- 1 Year Q (cfs) 0.10 0.10 0.09 0.09 0.08 0.08 0.07 0.07 — Z 0.06 - 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 — ' - 0.00 0 240 480 720 960 1200 1440 1680 1920 2160 2400 2640 2880 Time (min) Hyd No. 7 Hyd No. 6 111111111 Total storage used =441 cuft Pond Report 9 Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,01 /2/2024 Pond No. 1 - BMP Pond Pond Data Contours-User-defined contour areas.Average end area method used for volume calculation. Begining Elevation= 170.10 ft Stage/Storage Table Stage(ft) Elevation(ft) Contour area(sqft) Incr.Storage(cuft) Total storage(cuft) 0.00 170.10 6,140 0 0 0.50 170.60 7,425 3,391 3,391 0.90 171.00 7,960 3,077 6,468 1.90 172.00 9,520 8,740 15,208 2.10 172.20 9,780 1,930 17,138 2.90 173.00 10,835 8,246 25,384 3.90 174.00 12,210 11,522 36,907 4.50 174.60 13,060 7,581 44,488 Culvert/Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise(in) = 18.00 1.30 0.00 0.00 Crest Len(ft) = 1.30 14.70 0.00 0.00 Span(in) = 18.00 1.30 0.00 0.00 Crest El.(ft) = 172.20 172.80 0.00 0.00 No.Barrels = 1 1 0 0 Weir Coeff. = 3.33 2.60 3.33 3.33 Invert El.(ft) = 169.90 170.10 0.00 0.00 Weir Type = Rect Broad --- --- Length(ft) = 62.00 0.50 0.00 0.00 Multi-Stage = Yes Yes No No Slope(%) = 0.65 1.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000(by Contour) Multi-Stage = n/a Yes No No TW Elev.(ft) = 0.00 Note:Culvert/Orifice outflows are analyzed under inlet(ic)and outlet(oc)control. Weir risers checked for orifice conditions(ic)and submergence(s). Stage(ft) Stage/ Discharge Elev(ft) 5.00 175.10 4.00 ....0"....°7 174.10 3.00 �- 173.10 2.00 172.10 1.00 171.10 0.00 170.10 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 Total Q Discharge(cfs) 10 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 1.968 2 726 11,059 BMP Pre-Developed 2 SCS Runoff 12.88 2 718 25,750 BMP Post-Developed 3 Reservoir 0.267 2 1014 21,068 2 172.33 18,441 Post Through Pond 4 SCS Runoff 1.004 2 724 4,906 Post Developed-Pond Bypass 6 SCS Runoff 0.000 2 n/a 0 BMP Post-Developed 7 Reservoir 0.000 2 n/a 0 6 170.10 0.000 1.0-in Storm Thru Pond Wet Pond-Dunn Erwin.gpw Return Period: 2 Year Tuesday, 01 /2/2024 11 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,01 /2/2024 Hyd. No. 1 BMP Pre-Developed Hydrograph type = SCS Runoff Peak discharge = 1.968 cfs Storm frequency = 2 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 11,059 cuft Drainage area = 8.740 ac Curve number = 53.3 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 14.90 min Total precip. = 3.71 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Pre-Developed Q (cfs) Hyd. No. 1 -- 2 Year Q (cfs) 2.00 - 2.00 • • 1.00 - • 1.00 • • 0.00 - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 12 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,01 /2/2024 Hyd. No. 2 BMP Post-Developed Hydrograph type = SCS Runoff Peak discharge = 12.88 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 25,750 cuft Drainage area = 5.380 ac Curve number = 74.3 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.71 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Post-Developed Q (cfs) Hyd. No. 2 -- 2 Year Q (cfs) 14.00 14.00 12.00 12.00 10.00 10.00 8.00 8.00 6.00 — 6.00 4.00 4.00 2.00 2.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 13 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,01 /2/2024 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 0.267 cfs Storm frequency = 2 yrs Time to peak = 1014 min Time interval = 2 min Hyd. volume = 21,068 cuft Inflow hyd. No. = 2 - BMP Post-Developed Max. Elevation = 172.33 ft Reservoir name = BMP Pond Max. Storage = 18,441 cuft Storage Indication method used. Post Through Pond Q (cfs) Hyd. No. 3 -- 2 Year Q (cfs) 14.00 - 14.00 12.00 I 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 J16.-""' 0.00 - 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 3 Hyd No. 2 I Total storage used = 18,441 cuft 14 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,01 /2/2024 Hyd. No. 4 Post Developed - Pond Bypass Hydrograph type = SCS Runoff Peak discharge = 1.004 cfs Storm frequency = 2 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 4,906 cuft Drainage area = 3.560 ac Curve number = 53.6 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 3.71 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Developed - Pond Bypass Q (cfs) Hyd. No. 4 -- 2 Year Q (cfs) 2.00 - 2.00 1.00 1.00 0.00 - I , 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) 15 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,01 /2/2024 Hyd. No. 6 BMP Post-Developed Hydrograph type = SCS Runoff Peak discharge = 0.000 cfs Storm frequency = 2 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Drainage area = 5.380 ac Curve number = 74.3 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 0.00 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 BMP Post-Developed Q (cfs) Hyd. No. 6 -- 2 Year Q (cfs) 0.10 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 - 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 — — 0.00 0 20 40 60 80 100 120 Hyd No. 6 Time (min) 16 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,01 /2/2024 Hyd. No. 7 1.0-in Storm Thru Pond Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 2 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 6 - BMP Post-Developed Max. Elevation = 170.10 ft Reservoir name = BMP Pond Max. Storage = 0 cuft Storage Indication method used. 1.0-in Storm Thru Pond Q (cfs) Hyd. No. 7 -- 2 Year Q (cfs) 0.10 - 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 - 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 7 Hyd No. 6 I I Total storage used = 0 cuft 17 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 11.08 2 724 36,153 BMP Pre-Developed 2 SCS Runoff 26.01 2 716 52,563 BMP Post-Developed 3 Reservoir 4.735 2 726 47,791 2 172.94 24,719 Post Through Pond 4 SCS Runoff 5.399 2 722 15,854 Post Developed-Pond Bypass 6 SCS Runoff 0.000 2 n/a 0 BMP Post-Developed 7 Reservoir 0.000 2 n/a 0 6 170.10 0.000 1.0-in Storm Thru Pond Wet Pond-Dunn Erwin.gpw Return Period: 10 Year Tuesday, 01 /2/2024 18 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,01 /2/2024 Hyd. No. 1 BMP Pre-Developed Hydrograph type = SCS Runoff Peak discharge = 11.08 cfs Storm frequency = 10 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 36,153 cuft Drainage area = 8.740 ac Curve number = 53.3 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 14.90 min Total precip. = 5.59 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Pre-Developed Q (cfs) Hyd. No. 1 -- 10 Year Q (cfs) 12.00 - 12.00 10.00 - i 10.00 8.00 - 8.00 6.00 - 6.00 4.00 4.00 2.00 2.00 0.00 - ‘-- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 19 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,01 /2/2024 Hyd. No. 2 BMP Post-Developed Hydrograph type = SCS Runoff Peak discharge = 26.01 cfs Storm frequency = 10 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 52,563 cuft Drainage area = 5.380 ac Curve number = 74.3 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.59 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Post-Developed Q (cfs) Hyd. No. 2 -- 10 Year Q (cfs) 28.00 28.00 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 J ' 0.00 — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 2 Time (min) 20 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,01 /2/2024 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 4.735 cfs Storm frequency = 10 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 47,791 cuft Inflow hyd. No. = 2 - BMP Post-Developed Max. Elevation = 172.94 ft Reservoir name = BMP Pond Max. Storage = 24,719 cuft Storage Indication method used. Post Through Pond Q (cfs) Hyd. No. 3 -- 10 Year Q (cfs) 28.00 28.00 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 - J� � - •- 0.00 0 360 720 1080 1440 1800 2160 2520 2880 3240 3600 3960 4320 Time (min) Hyd No. 3 Hyd No. 2 II II Total storage used = 24,719 cuft 21 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,01 /2/2024 Hyd. No. 4 Post Developed - Pond Bypass Hydrograph type = SCS Runoff Peak discharge = 5.399 cfs Storm frequency = 10 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 15,854 cuft Drainage area = 3.560 ac Curve number = 53.6 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 5.59 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Developed - Pond Bypass Q (cfs) Hyd. No. 4 -- 10 Year Q (cfs) 6.00 6.00 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) 22 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,01 /2/2024 Hyd. No. 6 BMP Post-Developed Hydrograph type = SCS Runoff Peak discharge = 0.000 cfs Storm frequency = 10 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Drainage area = 5.380 ac Curve number = 74.3 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 0.00 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 BMP Post-Developed Q (cfs) Hyd. No. 6 -- 10 Year Q (cfs) 0.10 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 - 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 — — 0.00 0 20 40 60 80 100 120 Hyd No. 6 Time (min) 23 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,01 /2/2024 Hyd. No. 7 1.0-in Storm Thru Pond Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 10 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 6 - BMP Post-Developed Max. Elevation = 170.10 ft Reservoir name = BMP Pond Max. Storage = 0 cuft Storage Indication method used. 1.0-in Storm Thru Pond Q (cfs) Hyd. No. 7 -- 10 Year Q (cfs) 0.10 - 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 - 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 7 Hyd No. 6 I I Total storage used = 0 cuft 24 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 33.28 2 724 96,328 BMP Pre-Developed 2 SCS Runoff 50.22 2 716 103,393 BMP Post-Developed 3 Reservoir 16.38 2 724 98,548 2 174.52 43,526 Post Through Pond 4 SCS Runoff 15.88 2 722 41,973 Post Developed-Pond Bypass 6 SCS Runoff 0.000 2 n/a 0 BMP Post-Developed 7 Reservoir 0.000 2 n/a 0 6 170.10 0.000 1.0-in Storm Thru Pond Wet Pond-Dunn Erwin.gpw Return Period: 100 Year Tuesday, 01 /2/2024 25 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,01 /2/2024 Hyd. No. 1 BMP Pre-Developed Hydrograph type = SCS Runoff Peak discharge = 33.28 cfs Storm frequency = 100 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 96,328 cuft Drainage area = 8.740 ac Curve number = 53.3 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 14.90 min Total precip. = 8.76 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Pre-Developed Q (cfs) Hyd. No. 1 -- 100 Year Q (cfs) 35.00 35.00 30.00 30.00 25.00 25.00 • 20.00 20.00 I 15.00 15.00 10.00 10.00 5.00 5.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 26 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,01 /2/2024 Hyd. No. 2 BMP Post-Developed Hydrograph type = SCS Runoff Peak discharge = 50.22 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 103,393 cuft Drainage area = 5.380 ac Curve number = 74.3 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 8.76 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Post-Developed Q (cfs) Hyd. No. 2 -- 100 Year Q (cfs) 60.00 60.00 50.00 50.00 40.00 40.00 _ 1 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 2 Time (min) 27 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,01 /2/2024 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 16.38 cfs Storm frequency = 100 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 98,548 cuft Inflow hyd. No. = 2 - BMP Post-Developed Max. Elevation = 174.52 ft Reservoir name = BMP Pond Max. Storage = 43,526 cuft Storage Indication method used. Post Through Pond Q (cfs) Hyd. No. 3-- 100 Year Q (cfs) 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00IIII 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 3 Hyd No. 2 111111111 Total storage used =43,526 cuft 28 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,01 /2/2024 Hyd. No. 4 Post Developed - Pond Bypass Hydrograph type = SCS Runoff Peak discharge = 15.88 cfs Storm frequency = 100 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 41,973 cuft Drainage area = 3.560 ac Curve number = 53.6 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 8.76 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Developed - Pond Bypass Q (cfs) Hyd. No. 4 -- 100 Year Q (cfs) 18.00 - - 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) 29 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,01 /2/2024 Hyd. No. 6 BMP Post-Developed Hydrograph type = SCS Runoff Peak discharge = 0.000 cfs Storm frequency = 100 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Drainage area = 5.380 ac Curve number = 74.3 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 0.00 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 BMP Post-Developed Q (cfs) Hyd. No. 6-- 100 Year Q (cfs) 0.10 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 - 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 — — 0.00 0 20 40 60 80 100 120 Hyd No. 6 Time (min) 30 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,01 /2/2024 Hyd. No. 7 1.0-in Storm Thru Pond Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 100 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 6 - BMP Post-Developed Max. Elevation = 170.10 ft Reservoir name = BMP Pond Max. Storage = 0 cuft Storage Indication method used. 1.0-in Storm Thru Pond Q (cfs) Hyd. No. 7-- 100 Year Q (cfs) 0.10 - 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 - 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 7 Hyd No. 6 I I Total storage used = 0 cuft NORTH North American Green AMERICAN 5401 St. Wendel-Cynthiana Rd. Poseyville, Indiana 47633 GREEN Tel. 800.772.2040 >Fax 812.867.0247 www.nagreen.com ECMDS v7.0 CHANNEL ANALYSIS >>>Grass Channel#1 Name Grass Channel#1 Discharge 13.4 Channel Slope 0.0111 Channel Bottom Width 3 Left Side Slope 2 Right Side Slope 2 Low Flow Liner Retardence Class C 6-12 in Vegetation Type Mix(Sod and Bunch) Vegetation Density Good 65-79% Soil Type Sandy Loam(GM) Unreinforced Vegetation Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Mannings N Remarks Depth Shear Stress Shear Stress Factor Pattern Unreinforced Straight 13.4 cfs 2.15 ft/s 1.17 ft 0.061 4 Ibs/ft2 0.81 Ibs/ft2 4.94 STABLE -- Vegetation Underlying Straight 13.4 cfs 2.15 ft/s 1.17 ft 0.061 4 Ibs/ft2 0.53 Ibs/ft2 7.62 STABLE -- Substrate DS75 Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Remarks Depth Mannings N Shear Stress Shear Stress Factor Pattern DS75 Straight 13.4 cfs 3.28 ft/s 0.86 ft 0.034 1.6 Ibs/ft2 0.6 lbs/ft2 2.67 STABLE D Unvegetated Underlying Straight 13.4 cfs 3.28 ft/s 0.86 ft 0.034 1.51 lbs/ft2 0.41 Ibs/ft2 3.67 STABLE D Substrate 741 NORTH North American Green AMERICAN 5401 St. Wendel-Cynthiana Rd. Poseyville, Indiana 47633 GREEN Tel. 800.772.2040 >Fax 812.867.0247 www.nagreen.com ECMDS v7.0 CHANNEL ANALYSIS >>>Grass Channel#2 Name Grass Channel#2 Discharge 3.11 Channel Slope 0.005 Channel Bottom Width 3 Left Side Slope 2 Right Side Slope 2 Low Flow Liner Retardence Class C 6-12 in Vegetation Type Mix(Sod and Bunch) Vegetation Density Very Good 80-95% Soil Type Sandy Loam(GM) C125 Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Remarks Depth Mannings N Shear Stress Shear Stress Factor Pattern C125 Straight 3.11 cfs 1.71 ft/s 0.46 ft 0.031 2.3 lbs/ft2 0.14 lbs/ft2 15.92 STABLE D Unvegetated Underlying Straight 3.11 cfs 1.71 ft/s 0.46 ft 0.031 2.18 lbs/ft2 0.11 Ibs/ft2 19.47 STABLE D Substrate Unreinforced Vegetation Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Mannings N Remarks Depth Shear Stress Shear Stress Factor Pattern Unreinforced Straight 3.11 cfs 0.79 ft/s 0.84 ft 0.093 4 lbs/ft2 0.26 lbs/ft2 15.25 STABLE -- Vegetation Underlying Straight 3.11 cfs 0.79 ft/s 0.84 ft 0.093 4 lbs/ft2 0.18 lbs/ft2 22.02 STABLE -- Substrate NORTH North American Green AMERICAN 5401 St. Wendel-Cynthiana Rd. Poseyville, Indiana 47633 GREEN Tel. 800.772.2040 >Fax 812.867.0247 www.nagreen.com ECMDS v7.0 CHANNEL ANALYSIS > > > Grass Channel #3 Name Grass Channel #3 Discharge 8.68 Channel Slope 0.0316 Channel Bottom Width 1 Left Side Slope 2 Right Side Slope 2 Low Flow Liner Retardence Class C 6-12 in Vegetation Type Sod Former Vegetation Density Good 65-79% Soil Type Sandy Loam (GM) Unreinforced Vegetation Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Mannings N Remarks Depth Shear Stress Shear Stress Factor Pattern Unreinforced Straight 8.68 cfs 3.51 ft/s 0.89 ft 0.047 4 lbs/ft2 1.76 lbs/ft2 2.28 STABLE -- Vegetation Underlying Straight 8.68 cfs 3.51 ft/s 0.89 ft 0.047 4 lbs/ft2 0.98 lbs/ft2 4.08 STABLE -- Substrate DS75 Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Mannings N Remarks Depth Shear Stress Shear Stress Factor Pattern DS75 Straight 8.68 cfs 4.83 ft/s 0.73 ft 0.031 1.6 lbs/ft2 1.44 Ibs/ft2 1.11 STABLE D Unvegetated Underlying Straight 8.68 cfs 4.83 ft/s 0.73 ft 0.031 1.51 lbs/ft2 0.83 lbs/ft2 1.82 STABLE D Substrate Bowman North Carolina,Ltd. Erwin Road Residential Dunn,NC-Storm Drain"C"calculations Rational Runoff Coefficient"C" Grass Channel#1 Drainage Area(acres): 4.29 Proposed Land Uses: Land Use Description Acres %Site Runoff"C" "C" Roofs 0.86 20% 0.95 0.19 Asphalt/Concrete Pavement 0.00 0% 0.95 0.00 Lawn 1.95 45% 0.3 0.14 Wooded 1.49 35% 0.2 0.07 Total Area= 4.29 Cumulative"C"= 0.39 i i o= 7.92 Qi o= 13.43 Grass Channel#2 Drainage Area(acres): 0.82 Proposed Land Uses: Land Use Description Acres %Site Runoff"C" "C" Roofs 0.23 28% 0.95 0.26 Asphalt/Concrete Pavement 0.00 0% 0.95 0.00 Lawn 0.59 72% 0.3 0.22 Wooded 0.00 0% 0.2 0.00 Total Area= 0.82 Cumulative"C"= 0.48 iio= 7.92 Qio= 3.11 Grass Channel#3 Drainage Area(acres): 1.86 Proposed Land Uses: Land Use Description Acres %Site Runoff"C" Roofs 0.83 44% 0.95 0.42 Asphalt/Concrete Pavement 0.00 0% 0.95 0.00 Lawn 1.03 56% 0.3 0.17 Wooded 0.00 0% 0.2 0.00 Total Area= 1.86 Cumulative"C"= 0.59 i i o= 7.92 Qi o= 8.68 Erwin Road Residential Spread Calculations Bowman North Carolina, Ltd. 919-553-6570 Inlet Capacity Chart Rainfall Intensity = 7.92 in/hr Single Sump (Type E grate, P = 6.94ft) Maximum Spread = 7 feet Double Sump (Type E grate, P = 9.92ft) Inlet # Inlet Q Surface Q Slope K or P Inlet Qcap Spread Bypass Remarks Drainage Area C Sub. Bypass Total Long. Trans. Q To Inlet # - CB-108 0.18 0.88 1.25 0.00 1.25 0.021 0.034 23 1.16 4.90 0.09 CB-106 CB-106 0.22 0.46 0.80 0.09 0.90 0.017 0.02 26 0.81 6.26 0.08 CB-105 - CB-105 1.49 0.44 5.19 0.08 5.27 0.013 0.022 6.94 0.76 12.06 4.51 CB-104 - CB-104 0.19 0.82 1.25 4.51 5.77 0.0102 0.022 6.94 0.87 13.05 4.90 CB-103 - CB-103 0.63 0.53 2.64 4.90 7.54 0.0102 0.022 6.94 1.03 14.44 6.52 CB-102 - CB-102 0.13 0.82 0.84 6.52 7.36 0.015 0.022 6.94 0.90 13.31 6.47 CB-101 CB-107 0.88 0.56 3.90 0.00 3.90 0.015 0.022 6.94 0.60 10.49 3.30 CB-101 CB-101 0.15 0.62 0.74 9.77 10.50 0.015 0.022 6.94 1.12 15.20 9.38 Bowman NORTH C AROL 1 N A APPENDIX C Storm Drainage System Calculations 100-System Erwin Road Residential—Dunn, NC 10 C / / — ---- —_ I I111111 � —__ sMH N1361 —__ ---------__ RIM-169.47 \ PIN J(750-7g_17 --__ ( IN ta"DIP lE:16t o7 J/ 06-79- --_-- 6 -- OUT 18"DIP IE'.161 02 PIN 15 _ I I 92 ---- DRENT S G 1980 ----_- \ LEAH DAWN \\ D6 629, BANE �\ I D@03 BNHp9S9 R1 - - ZONING R j9 4G R. CONDITIONS 17 GN ANC,EL000 RE I ZONING 7116'02 - AND q_20 ANNUAL CHANCE \ =1NG R-70 AND R-20 � 4\\�-- FLOOD HAZARD HAZARD(G�) SMH gt5t1 L,, __— (GIs) PIN WEI RIM:176,96 _ /\ JEAN B 33B PIN _ 58L10 / DB 33 I GARY MAiC 06 7g-267 \ _ __— - / ERV SMH#1564 itEST g GAR Z ��� _ I \\ \\ \ `, 9'39'1�°♦`611 6J'TOTAL \ / NM RIM:176.48 D8 I4 NBjM RIE ( -_ \ \ \ _ 381 63' J - -'IIE-51 87 7SANITARY SNNO EC.ER CITY OF 451 1908 'q 3 ANDVM#i351 sMH pt3za PG / oit i 6"Ina® PIN y1506-7g- --- ,_^oN LINE ( tI _I DONALD 1.JOHN 2558 \ ,� \ \\\ ' RIM'17122RIM16991 /NANCYW SON& n \ \ 161,07 DB 92I JOHNSON g \ 3' _ IN 18"DIP I'IE: IN 18°DIP IE'.161.51 / J 3508 Oi 622 \ OUT 18"DIl'IE 161.07 DIP IE 1fi1 47 _ N 89'2151"E PIN#150fi-79- �1510 0 \ \\ \ \��� _�� OUT 18" 352.50 TOTAL DONAID L JOHNSON ZONING R_10 I\ \ \ \ I ` DB 844,PG739 1�I --_ 'L 9\ \ \\ / \ �I \ -�� -�/ \ ZONING R-10 I I - \ 12:1 i � _ - _ T;. r _ _-BO - \ _� - sMH µ13zs wr I/I •Po� \I N 09'3941'._ 70' :: s l \ _ _� \\\ �_ IP IE 75 s�� RIM'. B7RVC IE 1625 �_ (B)IN818 D 1615 7 \� - 21 ROP��� � _ \_ OUT �_ sMN#1003 Vl�I �p� ;, A A\ 1 l 1---- ---- / _ �, � '`, �ssu�- - m ^ m RIM. E \ \ -- _ _ 17875 1 \ \o CB-104 — 1 I r'�--, - __�� uts I D 1 IN 8'PVC IE 17117 I y I \ N \ _ r _ ��` ` _ y _ _ VER PVC IE 171,14 11 $ \ N {— \ _ ) OUT 8' m , -,,,, lk, \. i I 1 1/48asz'1/4.. 2 II\ ���- ii —• 1 ., A i i� CB 101 \ / pAs E v ° E )RN I` ��� _ _ 1 \ \ U a 3 r:11 \:- � Po� � A 1 \ 15'unutt m� i 1— �i'—l�--�_ __ _ _ i�► \ \ EAR ���uwe�a��a", _��`"'� - \ \\ \ LS8 CAB. SMH#1052 _ ;, - A V I CB-105127 ---. - -----_- �' \ RIM'.182.51 r 1 1 l II \ \Iw s"Pvc le ns.o6 v v,4 CB-10315 a'Pvcoone.n5ol CB-106 1 vI I� � � A A IRE ..3) v I 1 vv --_ _____i/ -.� CB-1 07] _,, \V \ \ I \\ o !lillhsi9� \ I AN#1506 79 5448E. 1 - \ - \ j;, ES&RALPN D LUCAS \ I I 1.11111/- �'.. \ \I \ )1:' e }} t z ` �`,v a984 Pc 373 lg, -• --. i - �-- \V A\ �\ 1 # W ZD DB ROAD __'\I I ' •—��-_ I ill .[[_c ZONING IL\ I 1 ;i• I I - -�- / 1 \ \ �� +!' ',(1., S 7316205 \.J O \ I i�i '_'4. -_ - _ i \I� r \\ --- - - �� + 1 \\ / ' 'I III 67 92\ ¢ Q F I l — — IR'S(#5),� H 0 Z ITN I .='t �-- v 1 / I ,- — — CC \ i.�(Ila)'' CC Q ,ta .` ) `IRs('' l� / I �7eo� _ *14 A� / �.: • /1 a 2 1 CB-108 - -.-1a N P ; io'�g. • - 1 t. / I E� PIN#1.06 79-sase 4 _ "'6j`� coN� Z e101 I ,��. �,,ra/- I ( / I / -(a ` -7a1_ J2Mz olomcs,uc I l / s' 3361, 1 _ _ I I / T- \ --_ DB 4184.PG 339 1 \� O a 79-54 � I \ - '\-I 4 \ -_ RWIN ROAD E 1 1 !Vr PIN#150fi OARS.,% _\ I i ` / 38 i i �, �187�\ ZONt �'�44'IDRE-R-�O r ^ I 5 52'20 04" �� E-I (� DB 4084,PG 373` 1 I \ I / \` A'EA'.90 �;I\ _4.7 ../ � ' ^ / ' I 1 5128 ilE z Ii \ L .. rn ro\ �783\ _ \ / / J /r7 Z : � SL - _ — / o \y� �78g _ A`S / / 70-8049 �" / La ' wV / N1507- PIN JOHNSON&TAMMY /m� PIN#1507-7�- __ 8696 \ I oscAR DALE cHnn I I - - -- \\\ 78 \\ ''\ AY JOHNSON "' RICHARD D 79- \ 1 840 w DB 320 / / 1 _—-_PIN 4 0L000 Y.WEST —786\ / � \ DB 171 119G �. PLAT CAS / PG 1032 11\ 1 / LOT 14, a PIN I - _ --— DB 411406 ,/ 10 �� \ 9 ZONING R-10 "> SLIDE 127A X \ \ 0506-79-8959 gaoo coLERIDGE ZONING R-10 / ZONING R-11 / \ 5\ \ PIN DB 394DEE,PG 0/D � \ ,/� � - 1 )l150679-8966\ DB 3947.PGO21 \ , ' / /, \ PB 2010 \ NNP q 1\ ANNIE lEE MELVIN 1i' V\ /�/ V 'ro - V �= PIN#1506-79-8874 DR 4154,PG 67s `\ zoNwc R-10 �` U / 1 PB 2003,PG 421 ,, /,- 111'.1 ,,,,,. 4 I / Z 1 \� GERARDO GODOY BARRERA& #115 / / \ \ \ /' �'( 1 J',q 1 RU1H MARTIN,PGU651 ERO \ ZONING R-10 =t /, a � � I CP z I p� / I ,/ �� N01,. EA NO1 SURV069 #111 ' IN AN 1 \ ZONING R-10 _ / / DUE iO�NIMALS NO a _ \ ENCL SUR�I o Po" �� PRELIMINARY DO NOT USE FOR CONSTRUCTION PLAN STATUS _/_/23 DATE DESCRIPTION ML RG XXX DESIGN DRAWN CHKD SCALE H:1 50' V: GRAPHIC SCALEJOB No. 220124-01-006 so xs so PW DATE Dec 11, 2023 FILE No. ( IN FEET) 1 inch= 50 ft. SHEET #### Cad file name:N\220124-Ben Stout Construction\220124-01-004(ENG)-Erwin Rood,Dunn,NC\Engineering\Engineering Plans\construction Documents\220124-01-004-DDP(Inlets).dwg Bowman North Carolina,Ltd. Erwin Road Residential Dunn,NC-Storm Drain"C"calculations Rational Runoff Coefficient"C" Catch Basin #101 Drainage Area(acres): 0.151 Proposed Land Uses: Land Use Description Acres %Site Runoff"C" "C" Roofs 0.03 19% 0.95 0.18 Asphalt/Concrete Pavement 0.05 31% 0.95 0.30 Lawn 0.08 50% 0.3 0.15 Wooded 0.00 0% 0.2 0.00 Total Area= 0.15 Cumulative"C"= 0.62 i i o= 7.92 Qio= 0.75 Catch Basin #102 Drainage Area(acres): 0.133 Proposed Land Uses: Land Use Description Acres %Site Runoff"C" "C" Roofs 0.00 0% 0.95 0.00 Asphalt/Concrete Pavement 0.11 80% 0.95 0.76 Lawn 0.03 20% 0.3 0.06 Wooded 0.00 0% 0.2 0.00 Total Area= 0.13 Cumulative"C"= 0.82 i i o= 7.92 Qio= 0.86 Catch Basin #103 Drainage Area(acres): 0.629 Proposed Land Uses: Land Use Description Acres %Site Runoff"C" "C" Roofs 0.11 18% 0.95 0.17 Asphalt/Concrete Pavement 0.11 17% 0.95 0.16 Lawn 0.41 65% 0.3 0.20 Wooded 0.00 0% 0.2 0.00 Total Area= 0.63 Cumulative"C"= 0.53 iio= 7.92 Qio= 2.62 Catch Basin #104 Drainage Area(acres): 0.193 Proposed Land Uses: Land Use Description Acres %Site Runoff"C" "C" Roofs 0.00 0% 0.95 0.00 Asphalt/Concrete Pavement 0.15 80% 0.95 0.76 Lawn 0.04 20% 0.3 0.06 Wooded 0.00 0% 0.2 0.00 Total Area= 0.19 Cumulative"C"= 0.82 i i o= 7.92 Qio= 1.25 Catch Basin #105 Drainage Area(acres): 1.493 Proposed Land Uses: Land Use Description Acres %Site Runoff"C" "C" Roofs 0.20 14% 0.95 0.13 Asphalt/Concrete Pavement 0.16 10% 0.95 0.10 Lawn 0.97 65% 0.3 0.19 Wooded 0.17 11% 0.2 0.02 Total Area= 1.49 Cumulative"C"= 0.44 i 1 o= 7.92 Qio= 5.26 Catch Basin #106 Drainage Area(acres): 0.215 Proposed Land Uses: Land Use Description Acres %Site Runoff"C" Roofs 0.03 13% 0.95 0.13 Asphalt/Concrete Pavement 0.03 12% 0.95 0.12 Lawn 0.15 70% 0.3 0.21 Wooded 0.01 5% 0.2 0.01 Total Area= 0.21 Cumulative"C"= 0.46 iio= 7.92 Q1o= 0.78 Catch Basin #107 Drainage Area(acres): 0.879 Proposed Land Uses: Land Use Description Acres %Site Runoff"C" "C" Roofs 0.17 19% 0.95 0.18 Asphalt/Concrete Pavement 0.18 20% 0.95 0.19 Lawn 0.53 61% 0.3 0.18 Wooded 0.00 0% 0.2 0.00 Total Area= 0.88 Cumulative"C"= 0.56 iio= 7.92 Q1o= 3.86 Catch Basin #108 Drainage Area(acres): 0.180 Proposed Land Uses: Land Use Description Acres %Site Runoff"C" "C" Roofs 0.00 0% 0.95 0.00 Asphalt/Concrete Pavement 0.16 90% 0.95 0.85 Lawn 0.02 10% 0.3 0.03 Wooded 0.00 0% 0.2 0.00 Total Area= 0.18 Cumulative"C"= 0.88 iio= 7.92 Q1o= 1.26 Hydraflow Storm Sewers Extension for Autodesk® Civil 3D® Plan CB#107 OUTFALL , 7 46 CB#101 2v CB#102 8 45 CB#103 3 CB#104 43 CB#105 5'b CB#106 -6 CB#108 Project File: 100 System-V2.0.stm Number of lines:8 Date: 11/20/2023 Storm Sewers v2022.00 Storm Sewer Inventory Report Pagel Line Alignment Flow Data Physical Data Line ID No. Dnstr Line Defl Junc Known Drng Runoff Inlet Invert Line Invert Line Line N J-Loss Inlet/ Line Length angle Type Q Area Coeff Time El Dn Slope El Up Size Shape Value Coeff Rim El No. (ft) (deg) (cfs) (ac) (C) (min) (ft) (%) (ft) (in) (n) (K) (ft) 1 End 50.844 25.602 Genr 0.75 0.00 0.00 0.0 169.50 0.59 169.80 24 Cir 0.012 1.50 176.51 46 2 1 120.664 84.626 Genr 0.86 0.00 0.00 0.0 170.00 0.58 170.70 I 24 Cir 0.012 1.50 175.60 42 3 2 200.183 -1.274 Genr 1.25 I 0.00 0.00 0.0 170.80 0.55 171.90 18 Cir 0.012 1.50 176.23 44 4 3 29.723 -86.632 Genr 5.26 0.00 0.00 0.0 172.60 1.01 172.90 15 Cir 0.012 1.47 176.30 43 5 4 175.129 77.338 Genr 0.78 0.00 0.00 0.0 173.10 0.57 174.10 15 Cir 0.012 0.50 179.68 85 6 5 96.092 -14.489 Genr 1.26 0.00 0.00 0.0 176.20 1.04 177.20 15 Cir 0.012 1.00 181.15 197 7 1 86.290 -95.385 Genr 3.86 0.00 0.00 0.0 172.50 0.58 173.00 15 Cir 0.012 1.00 175.70 48 8 2 29.014 -88.216 Genr 2.62 0.00 0.00 0.0 171.60 0.69 171.80 15 Cir 0.012 1.00 175.59 45 Project File: 100 System-V2.0.stm I Number of lines:8 Date: 11/20/2023 Storm Sewers v2022.00 Storm Sewer Summary Report Pagel Line Line ID Flow Line Line Line Invert Invert Line HGL HGL Minor HGL Dns Junction No. rate Size shape length EL Dn EL Up Slope Down Up loss Junct Line Type (cfs) (in) (ft) (ft) (ft) (%) (ft) (ft) (ft) (ft) No. 1 46 16.64 24 Cir 50.844 169.50 169.80 0.590 170.96 171.27 1.06 171.27 End Generic 2 42 12.03 24 Cir 120.664 170.00 170.70 0.580 171.27 171.95 n/a 171.95 j 1 Generic 3 44 8.55 18 Cir 200.183 170.80 171.90 0.549 172.05 173.15 0.69 173.84 2 Generic 4 43 7.30 15 Cir 29.723 172.60 172.90 1.009 173.84 173.98 n/a 173.98 3 Generic 5 85 2.04 15 Cir 175.129 173.10 174.10 0.571 173.98 174.67 n/a 174.67 j 4 Generic 6 197 1.26 15 Cir 96.092 176.20 177.20 1.041 176.56 177.64 n/a 177.64 5 Generic 7 48 3.86 15 Cir 86.290 172.50 173.00 0.579 173.29 173.79 n/a 173.79 1 Generic 8 45 2.62 15 Cir 29.014 171.60 171.80 0.689 172.19 172.45 n/a 172.45 2 Generic Project File: 100 System-V2.0.stm Number of lines:8 Run Date: 11/20/2023 NOTES: Return period=10 Yrs. ;j-Line contains hyd.jump. Storm Sewers v2022.00 Storm Sewer Tabulation Pagel Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd/Rim Elev Line ID coeff (I) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft/s) (in) (%) (ft) (ft) (ft) (ft) (ft) (ft) 1 End 50.844 0.00 0.00 0.00 0.00 0.00 0.0 4.6 0.0 16.64 18.82 6.74 24 0.59 169.50 169.80 170.96 171.27 171.68 176.51 46 2 1 120.664 0.00 0.00 0.00 0.00 0.00 0.0 4.1 0.0 12.03 18.66 5.79 24 0.58 170.00 170.70 171.27 171.95 176.51 175.60 42 3 2 200.183 0.00 0.00 0.00 0.00 0.00 0.0 3.4 0.0 8.55 8.43 5.44 18 0.55 170.80 171.90 172.05 173.15 175.60 176.23 44 4 3 29.723 0.00 0.00 0.00 0.00 0.00 0.0 3.3 0.0 7.30 7.03 6.22 15 1.01 172.60 172.90 173.84 173.98 176.23 176.30 43 5 4 175.129 0.00 0.00 0.00 0.00 0.00 0.0 1.6 0.0 2.04 5.29 2.99 15 0.57 173.10 174.10 173.98 174.67 176.30 179.68 85 6 5 96.092 0.00 0.00 0.00 0.00 0.00 0.0 0.0 0.0 1.26 7.14 3.81 15 1.04 176.20 177.20 176.56 177.64 179.68 181.15 197 7 1 86.290 0.00 0.00 0.00 0.00 0.00 0.0 0.0 0.0 3.86 5.33 4.71 15 0.58 172.50 173.00 173.29 173.79 176.51 175.70 48 8 2 29.014 0.00 0.00 0.00 0.00 0.00 0.0 0.0 0.0 2.62 5.81 4.34 15 0.69 171.60 171.80 172.19 172.45 175.60 175.59 45 Project File: 100 System-V2.0.stm Number of lines:8 Run Date: 11/20/2023 NOTES:Intensity=88.24/(Inlet time+15.50)A 0.83; Return period=Yrs. 10 ; c=cir e=ellip b=box Storm Sewers v2022.00 Hydraulic Grade Line Computations Page 1 Line Size Q Downstream Len Upstream Check JL Minor coeff loss Invert HGL Depth Area Vel Vel EGL Sf Invert HGL Depth Area Vel Vel EGL Sf Ave Enrgy elev elev head elev elev elev head elev Sf loss (in) (cfs) (ft) (ft) (ft) (sgft) (ft/s) (ft) (ft) (%) (ft) (ft) (ft) (ft) (sgft) (ft/s) (ft) (ft) (%) (%) (ft) (K) (ft) 1 24 16.64 169.50 170.96 1.46 2.46 6.76 0.70 171.67 0.000 50.844 169.80 171.27 1.47** 2.47 6.73 0.70 171.97 0.000 0.000 n/a 1.50 1.06 2 24 12.03 170.00 171.27 1.27 2.06 5.72 0.53 171.80 0.000 120.664170.70 171.95 j 1.25** 2.06 5.85 0.53 172.48 0.000 0.000 n/a 1.50 n/a 3 18 8.55 170.80 172.05 1.25* 1.57 5.44 0.46 172.51 0.549 200.183171.90 173.15 1.25 1.57 5.44 0.46 173.61 0.549 0.549 1.100 1.50 0.69 4 15 7.30 172.60 173.84 1.24 1.12 5.96 0.65 174.49 0.000 29.723 172.90 173.98 1.08** 1.12 6.49 0.65 174.63 0.000 0.000 n/a 1.47 n/a 5 15 2.04 173.10 173.98 0.88 0.54 2.22 0.22 174.20 0.000 175.129174.10 174.67 j 0.57** 0.54 3.76 0.22 174.89 0.000 0.000 n/a 0.50 0.11 6 15 1.26 176.20 176.56 0.36* 0.29 4.38 0.16 176.72 0.000 96.092 177.20 177.64 0.44** 0.39 3.24 0.16 177.81 0.000 0.000 n/a 1.00 n/a 7 15 3.86 172.50 173.29 0.79* 0.82 4.73 0.34 173.63 0.000 86.290 173.00 173.79 0.79** 0.82 4.70 0.34 174.14 0.000 0.000 n/a 1.00 n/a 8 15 2.62 171.60 172.19 0.59* 0.57 4.61 0.26 172.45 0.000 29.014 171.80 172.45 0.65** 0.64 4.08 0.26 172.71 0.000 0.000 n/a 1.00 n/a Project File: 100 System-V2.0.stm Number of lines:8 Run Date: 11/20/2023 Notes:* depth assumed;**Critical depth.;j-Line contains hyd.jump ; c=cir e=ellip b=box Storm Sewers v2022.00 Storm Sewer Profile Proj. file: 100 System-V2.0.stm Q O N 71- Ln co CO I— LL 0 O.— It 0 0 0 0 D eak O U COCU CU 0 m 0 0 U N N CO Lo coer 7 C 7 C 7 C 5 C 7 C 7 °0 C J C J C J C J C J C J O ' 00 ' 000 MOO ' 000 ' 000 ' LoO 0 "') Q �00•0 00 °�O O N CO CI a),- ��N CO 7N p0 co • ��O • ^00 CO �f`� V ^� • �nti co. Wn Elev. (ft) 0 w r n II o n ,, o• � W O WWW WWW M WWW v WWW WWW co EH :° E > w E » co E » ;g E» co E » asE » :g E > fn 0fn co cn = in to REEcn Ft c 195.00 195.00 • • • • 189.00 • - - 189.00 • • 183.00 183.00 • • • • 177.00 K/ ....._....____. 177.00 - }�5.129Lf-1 E"a0.577% ��00.103Lf 18"Q � 171.00 — — 913.092Lt-15" ch711.&P/° I • — 120 664Lf-24"a 0 58% — 28.723Lf 16"@ 1.014! — &0.044L1-24"@ 0.59% 165.00 165.00 0 50 100 150 200 250 300 350 400 450 500 550 600 650 700 Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: 100 System-V2.0.stm N C') O O INT m m U U O E. -J 0 c co. onm v �oo Elev. (ft) o O N O W W W O W W E > > co E> 184.00 184.00 • 181.00 - . 181.00 • 178.00 178.00 175.00 175.00 172.00 29.014Lf-15"(cil %U.69 172.00 169.00 169.00 0 10 20 30 40 50 60 70 80 90 100 Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: 100 System-V2.0.stm 0 o o ti 4.7 o m U- 0 U c N- c 0 CO pp C J OE J 0 V oc,co Lo 00 O O O 00� n r^ Elev. (ft) oW ( �, co o -6 w o www Ww m E > m E » co E > 0 0 E co ESE co Ft 186.00 186.00 • 182.00 - • - 182.00 178.00 178.00 • - 174.00 174.00 • ab.t901_1- 15"@ 3.58% • 50.844Lf-94"©0.59% 170.00 170.00 • 166.00 166.00 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 Reach (ft) Storm Sewers Bowman [Von7FlCAUL !!VA APPENDIX D Erosion and Sediment Control Calculations Rip-Rap Calculations Skimmer Basin Riser Temporary Diversion Ditches Erwin Road Residential—Dunn, NC 11 EROSION CONTROL CALCS (RIP-RAP CALCULATIONS) Project Information Project Name: Erwin Rd Dunn, NC Project#: 220124-01-004 Designed by: JA Date: 7/3/2023 Revised by: Date: Checked by: Date: Rip-Rap Apron#1 Pipe Diameter d= 24 Pipe Slope s= 0.59 % Manning's number n= 0.013 Flow Q= 12.93 cfs Velocity V= 4 ft/s Dissipator Dimensions* Zone= Stone Filling Class= A Entry Width(2 X Do)= 4.0 ft Length(4 X Do)= 8.O ft Width(La+Do)= 10.0 ft Min.Thickness= 12 inches Min.Stone Diameter= 3 inches 8.0 1 4.0 10.0 1 *All units are in feet **Dissipator pad designed for full flow of pipe RIP-RAP_ErwinRd.xlsx 7/19/2023 Page 1 of 5 Rip-Rap Apron#2 Pipe Diameter d= 18 in Pipe Slope s= 0.62 % Manning's number n= 0.013 Flow Q=� 4.601 cfs Velocity V= 2 ft/s Dissipator Dimensions* Zone=/ 1 Stone Filling Class= A Entry Width(2 X Do)= 3.0 ft Length(4 X Do)= 6.0 ft Width(La+Do)= 7.5 ft Min.Thickness= 12 inches Min.Stone Diameter= 3 inches 6.0 lk 3.0 7.5 Jr *All units are in feet **Dissipator pad designed for full flow of pipe RIP-RAP_ErwinRd.xlsx 7/19/2023 Page 2 of 5 EROSION CONTROL CALCULATIONS(Skimmer Basin) Project Information Project Name: Erwin Rd Dunn,NC Project#: 220124-01-004 Designed by: JA Date: 7/3/2023 Revised by: Date: Checked by: Date: Skimmer Basin#1 Drainage Area Total,AT= 6.54 Ac Disturbed,AR= 7.94 Ac 10-year Runoff(Q10) C= 0.50 T�= 5.00 min 110= 7.92 in/hr Q10= 25.9 cfs Surface Area Required SA= 325sf x Q10 SA= 8,422 sf Volume Required VR= 1800 cf/Ac x AD VR= 11,779 cf Sediment Trap Dimensions L= 167 ft (Spillway Length) W= 60 ft (Spillway Width) D= 2.0 ft (Depth of Storage) Side Slopes= 2:1 Lroo= Lrap= 175 ft Lbor= 159 ft Wrur Wrpr Wrap= 68 ft Lbor= Wbor= 52 ft L/W Ratio= 2.8:1(must be 2:1 to 6:1) Elevations Description Elevation Top of Berm 174.00 (allow 1ft freeboard above spillway flow height) Emergency Spillway 172.50 Sediment Storage 172.00 Cleanout Mark 171.00 (half of storage height) Bottom 170.00 Provided SAP= 10,020 sf > 8,422 VP= 18,288.0 cf > 11,779 Emergency Spillway-10 Year Storm 110= in/hr Q10= 25.91 cfs h= 0.5ft C,v= 3 Lw= 25 ft Calculate Skimmer Size Basin Volume in Cubic Feet 17,721 Cu.Ft Skimmer Size 2.5 Inch Days to Drain* 3 Days Orifice Radius 1.2 Inch[es] Orifice Diameter 2.4 Inch[es] *In NC assume 3 days to drain Estimate Volume of Basin Length Width Top of water surface in feet 167 60 Feet VOLUME 18288 Cu.Ft. Bottom dimensions in feet 159 52 Feet Depth in feet 2 Feet EROSION CONTROL CALCS (SKIMMER BASINS) Project Information Project Name: Erwin Rd Dunn,NC Project#: 220124-01-004 Designed by: JA Date: 7/3/2023 Revised by: Date: Checked by: Date: Anti-Flotation Device(Skimmer Basin#1) 4'x 4' Outlet Structure Area: 16.0 sf Top of Basin Elev.: 172.0 Bottom of Basin Elev.: 170.0 Volume: 32.0 cf (Water Displaced-Top of Pond to Bottom of Pond) Weight: 1997 lbs Factor of Safety 1.20 WT Req'd of Anti-Flotation Device: 2,396 lbs Volume of Concrete Req'd: 16.0 cf (Unit WT of Concrete=150 pcf) Volume Provided: 69.5 cf (4'x4'riser x 2.0'=32cf,5'x5'footing x 1.5'=37.5cf) EROSION CONTROL CALCS (TEMPORARY DITCH #1) Project Information Project Name: Erwin Rd Dunn, NC Project#: 220124-01-004 Designed by: JA Date: 7/3/2023 Revised by: Date: Checked by: Date: Temporary Ditch#1 Drainage Area Total,AT= 4.96 Ac 25-year Runoff(Q25) C= 0.50 Tc= 5.00 min 125= 7.92 in/hr Q25= 19.6 cfs NORTH North American Green AMERICAN 5401 St. Wendel-Cynthiana Rd. Poseyville, Indiana 47633 GREEN Tel. 800.772.2040 >Fax 812.867.0247 www.nagreen.com ECMDS v7.0 CHANNEL ANALYSIS >>>Temporary Ditch#1 Name Temporary Ditch#1 Discharge 19.6 Channel Slope 0.0073 Channel Bottom Width 1 Left Side Slope 2 Right Side Slope 2 Low Flow Liner Retardence Class C 6-12 in Vegetation Type None Vegetation Density None Soil Type Sandy Loam(GM) DS75 Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Mannings N Remarks Depth Shear Stress Shear Stress Factor Pattern DS75 Straight 19.6 cfs 3.16 ft/s 1.53 ft 0.034 1.6 lbs/ft2 0.7 lbs/ft2 2.3 STABLE D Unvegetated Underlying Straight 19.6 cfs 3.16 ft/s 1.53 ft 0.034 1.51 lbs/ft2 0.36 lbs/ft2 4.21 STABLE D Substrate EROSION CONTROL CALCS (TEMPORARY DITCH #2) Project Information Project Name: Erwin Rd Dunn, NC Project#: 220124-01-004 Designed by: JA Date: 7/3/2023 Revised by: Date: Checked by: Date: Temporary Ditch#2 Drainage Area Total,AT= 0.88 Ac 25-year Runoff(Q25) C= 0.50 Tc= 5.00 min 125= 7.92 in/hr Q25= 3.5 cfs 741 NORTH North American Green AMERICAN 5401 St. Wendel-Cynthiana Rd. Poseyville, Indiana 47633 GREEN Tel. 800.772.2040 >Fax 812.867.0247 www.nagreen.com ECMDS v7.0 CHANNEL ANALYSIS >>>Temporary Ditch#2 Name Temporary Ditch#2 Discharge 3.5 Channel Slope 0.0154 Channel Bottom Width 1 Left Side Slope 2 Right Side Slope 2 Low Flow Liner Retardence Class C 6-12 in Vegetation Type None Vegetation Density None Soil Type Sandy Loam(GM) DS75 Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Mannings N Remarks Depth Shear Stress Shear Stress Factor Pattern DS75 Straight 3.5 cfs 2.68 ft/s 0.6 ft 0.035 1.6 lbs/ft2 0.57 lbs/ft2 2.79 STABLE D Unvegetated Underlying Straight 3.5 cfs 2.68 ft/s 0.6 ft 0.035 1.51 lbs/ft2 0.34 lbs/ft2 4.42 STABLE D Substrate