HomeMy WebLinkAbout20231235 Ver 2_Agent Authorization_20240103 (2)AWBA RIPARIAN B FFER NQTIFIC►4TIQN FQ
PIPLs 5 W Cock b i n uS-� A) rec]cJe. � d- LD
Project Name address:
Owner: 11 I A ,N i
Print
Contractor agent:
Print
M
Signature
The approval is for the purpose and design described in your application. Impacts not indicated in the
application is a violation of the Buffer Rule. Site specific work should be provided in the application, [15A
NCAC 02H .0506 and 15A NCAC 02B ,0243($)]
Trees are not allowed to be removed from Zone 1 of the Buffer (within 30 ft of the full pond elevation), unless
approved. Exception, those trees that are severely undermined along the immediate shoreline can be
removed. Minimal shaping and sloping along the immediate shoreline is allowed. [15A NCAC 02B .0243(6)]
Benching, grading in the buffer is not allowed. Excessive disturbance of ground cover. [15A NCAC 02B .0243
(6)]
Beaches, impervious patios, impervious walkways, etc, are not allowed in the buffer unless specifically
approved by the ❑ivis!on . There are limitation on size for decks. [15A NCAC 02B .0243(4) and (6)]
Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The
work corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction
material must be outside the buffer. [15A NCAC 02H .0502 and 15A NCAC 02B ,0243 (4), (6), (s)]
Starmwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater
discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or
sheet flow at non -erosive velocities to the lake. j15A NCAC 02B .0243(5), (6)]
Acknowledgement of Notlficatfon
l' 1 hereby state that I have been informed of the Catawba
Riparian Buffer Rule. Any work conducted in the buffer, not specifically stated in the application and approved
by the Division of Water Resources (DWR), is a violation and subject to enforcement. Due diligence will be
taken such that the construction will be built within substantial compliance and intent of the 401 Water
quality Certification and Buffer Rules, the approved plan(5) and specification(s), and other supporting
materiais.
Signature (owner): - Date: Z3