Loading...
HomeMy WebLinkAboutNCGNE1004_Historical File_20231102 4 prw4 J pi{ a I5 n rSc;Y-cl c�►, P(IIJ V4060347 L" CWfi:- YA LLb6p 86 FOR AGENCY USE A ONLY; , Division of Water Quality 1 Surface Water Protection Year Da Mte onteceh nay ����� National Pollutant Discharge Elimination System Certificate of Coverage - Cu: —L-_�. •_F NO EXPOSURE CERTIFICATION for Exclusion r r.rn.�.rrr•.T enr r�rmn.0 nr;n -r. Of E N.C.t)t�j7 t. �JF{ NCGNEOOOO I MAY 3 4 2014 v NO EXPOSURE CERTIFICATIONR W NS7t1� National Pollutant Discharge Elimination System application for exclusion from a Storrriwat`A�t�l� rinit based on NO EXPOSURE: Submission of this No Exposure Certification constitutes notification that your facility does not require a permit for stormwater discharges associated with industrial activity in the State of North Carolina because it qualifies for a no exposure exclusion. A condition of no exposure at an industrial facility means all industrial materials and activities are protected by a storm resistant shelter(with some exceptions)to prevent exposure to rain, snow, snowmelt,andlor runoff. For permitted facilities in North Carolina, DWQ must approve your application for No Exposure Certification before this exclusion is effective. Lentil you are issued a No Exposure Certification and your NPDES permit is rescinded, your facility must continue to abide by the terms and conditions of the current permit. Industrial materials or activities include,but are not limited to. material handling equipment or activities, industrial machinery, raw materials, intermediate products,by-products, final products, or waste products. Material handling activities include the storage, loading and unloading, transportation, or conveyance of any raw material, intermediate product, final product or waste product. A storm resistant shelter is not required for the following industrial materials and activities: drums,barrels, tanks,and similar containers that are tightly sealed,provided those containers are not deteriorated and do not leak. "Sealed'means banded or otherwise secured and with locked or non-operational taps or valves;adequately maintained vehicles used in material handling;and final products, other than products that would be mobilized in stormwater discharges(e.g.,rack salt). A No Exposure Certification must be provided for each facility qualifying for the no exposure exclusion. In addition, the exclusion from NPDES permitting is available on a facility-wide basis only—not for individual outfalls. If any industrial activities or materials are, or will be,exposed to precipitation, the facility is not eligible for the no exposure exclusion. By signing and submitting this No Exposure Certification form,you certify that a condition of no exposure exists at this facility or site and are obligated to comply with the terms and conditions of 40 CFR 122.26(g). You are required to self re-certif ► your No Exposure Exclusion annually. For questions,please contact the DWQ Regional office for your area. (See page 6) (Please print or type) 1) Mailing address of owner/operator[address to which all certification correspondence will be mailed]: Name S.,"e,—L�lrty� Contact Street Address 203 IV,�ye City M ndA.. State A:�_ ZIP Code ?,70 '2.'7 Telephone No. _3_ � -9.0- L41Z 7 Fax: if Email Page t of 7 MAR 5WU-NE 12Aug2610 Er�Ft :_W� AL.I 8iiffi t$33� mWf Branch NCGNEOOOO No Exposure Certification nq, 2) Location of facility producing discharge. Facility Name i e v Facility Contact45 Facility Street Address 702 .sp a_v4 . City 44.r1 State G ZIP Cade County G Telephone No. Fax: Email 3) Physical location information: Please provide a narrative description of how to get to the facility(use street names, state road numbers; and distance and dir ction from a roadway inter ection). 5 ;- v (A copy of a map with the facility clearly located on it should be included with the certificatio ppl!cation.) 4) Is the facility located on Native American Lands?❑ Yes �R No 5) Is this a Federal facility? ❑ Yes 99 No 41 6) Latitude L�Z`��`��°� l� Longitude �9r.5 'S` •jy(deg.,min.,seconds) 7) This NPDES No Exposure Exclusion application applies to which of the following: 0 New or Proposed Facility Date operation is to begin 10 Existing Date operation began 6 Z L ❑ Renewal of existing No Exposure Certification Certification No.: NCGNE 8) Was this facility or site ever covered under an NPDES Stormwater Permit? 0 Yes ❑ No If yes, what is the NPDES Permit Number? IUC 6 �-I j 9) Standard Industrial Classification: Provide the 4 digit Standard Industrial Classification Code(SIC Code) that describes the primary industrial activity at this facility SIC Code: 2 4t 10) Provide a brief descriptiop of the tyFes of industrial activities and pr ducts produced at this facility: / r hh 7 +' 11) Does thi acility have any Non-Discharge permits(ex: recycle permits)? .V No ❑ Yes If yes, list the permit numbers for all current Non-Discharge permits for this facility: Page 2 of 7 SWU-NE-1 Mug2010 NCGNEOGOO No Exposure Certification Exposure Checklists 0 2.- 14.) 12) Are any of the following materials or activities exposed to precipitation, now or in the foreseeable future?(Please check either "Yes"or"No.") If you answer"Yes" to any of these items,you are not eligible for the no exposure exclusion. a. Using,storing; or cleaning industrial machinery or equipment, and areas where ❑ Yes It No residuals from using,storing or cleaning industrial machinery or equipment remain and are exposed to stormwater b. Materials or residuals on the ground or in stormwater inlets from spills/leaks ❑ Yes ® No c. Materials or products from past industrial activity ❑ Yes ® No d. Material handling equipment(except adequately maintained vehicles) ❑ Yes IN No e. Materials or products during loading/unloading or transporting activities ❑ Yes A No f. Materials or products stored outdoors(except final products intended for outside ❑ Yes IN No use[e.g., new cars]where exposure to stormwater does not result in the discharge of pollutants) g. Materials contained in open, deteriorated or leaking storage drums, barrels, tanks, ❑ Yes r No and similar containers h. Materials or products handled/stored on roads or railways owned or maintained by ❑ Yes ® No the discharger L Waste material (except waste in covered, non-leaking containers[e.g„dumpsters)) © Yes ® No j. Application or disposal of process wastewater(unless otherwise permitted) ❑ Yes Im No k. Particulate matter or visible deposits of residuals from roof stacks and/or vents not ❑ Yes ® No otherwise regulated (i.e.,under an air quality control permit) and evident in the stormwater outflow I. Empty containers that previously contained materials that are not properly stored ❑ Yes ® No (i.e., not closed and stored upside down to prevent precipitation accumulation) m. For any exterior ASTs, as well as drums, barrels, tanks,and similar containers !YesXNo stored outside, has the facility had any releases in the past three (3)years? rt,v etk "1 fll%(T S 1I13) Above Ground Storage Tanks (ASTs): If you answer"No"to any of the following items,you are no eligible for the no exposure exclusion. a.Are exterior ASTs and piping free of rust; damaged or weathered coating, pits, or A Yes ❑ No ❑ NIA deterioration,or evidence of leaks? b. Is secondary containment provided for all exterior ASTs? If so, is it free of any ® Yes ❑ No ❑ NIA cracks, holes, or evidence of leaks, and are drain valves maintained locked shut? Page 3 of 7 SW U-N E-12Aug2010 NCGNEOOOO No Exposure Certification 14) Secondary Containment: If you answer"No"to any of the following items, you are not eligible for the no exposure exclusion. a. Is secondary containment provided for all single above ground storage IN Yes ❑ No ❑ N/A containers (including drums; barrels; etc.) with a capacity of more than 660- gallons? b, Is secondary containment provided for above ground storage containers stored [f Yes ❑ No ❑ NIA in close proximity to each other with a combined capacity of more than 1.320- gal Ions? c. Is secondary containment provided for Title III Section 313 Superfund fik Yes ❑ No ❑ NIA Amendments and Reauthorization Act(SARA)water priority chemicals'? d. Is secondary containment provided for hazardous substances"designated in 40 -M Yes ❑ No 9 NIA CFR§116? e. Are re'ease valves an all secondary containment structures lacked? ® Yes ❑ No ❑ N/A 15) Hazardous Waste: a. is this facility a Hazardous Waste Treatment, Storage, or Disposal Facility? D Yes V No b. Is this facility a Small Quantity Generator (less than 1 000 kg. of hazardous waste ❑ Yes a No generated per month) of hazardous waste? c. Is this facility a Large Quantity Generator (1000 kg. or more of hazardous waste ❑ Yes ® No generated per month)of hazardous waste? It you answered yes to questions b. or c., please provide the following information: Type(s) of waste: How is material stored: Where is material stored: How many disposal shipments per year: Name of transport/disposal vendor: Vendor address: Footnotes to Questions 14)c.& d. 'Note that amounts below the 660-gallon (single)and 1,320-gallon (combined)bulk storage minimums requite secondary containment. However, some exceptions may be made for de minimis amounts of certain substances, and/or other qualifiers, as described in the exemptions from reporting requirements of Title III SARA 313 in 40 CFR §372.38, "Note that amounts below the 660-gallon (single) and 1,320-gallon (combined) bulk storage minimums require secondary containment. however, some exceptions may be made for amounts less than the Reportable Quantities of the hazardous substances listed in 40 C F R §117.3. Page 4 of 7 SWU-NE-12Aug2010 NCGNEOOOO No Exposure Certification 16) Other information: If you answer"Yes"to any of the following items,you might not be eligible for the no exposure exclusion. A more in-depth evaluation of the site circumstances may be required. a. Does your facility store used, recycled, or otherwise reclaimed pallets outside? ❑ Yes fp No b. Does your facility have coal piles on site? ❑ Yes Io No c. Does your facility store other fuel sources outside in piles, such as woad chips, ❑ Yes 4F No sawdust,etc.? d. Does your facility have air emissions associated with its industrial activity(e.g., ❑ Yes M No degreasing operations, plating, painting and metal finishing)? It so, describe the industrial activity: e. If you answered yes to d., are those emissions permitted by an Air Quality Permit? ❑ Yes 11 No M NIA Please specify: f. Please list any other environmental program permits(federal, state, etc.) not specified earlier in this application (such as Hazardous Waste Permits, etc.): Permit: Program: Permit: Program: Permit: Program: Permit. Program: Permit: Program: Permit: Program: Permit. Program: Page 5 of 7 5WU-NE-12Aug2010 NCGNE0000 No Exposure Certification 17) Certification; I certify under penalty of law that I have read and understand the eligibility requirements for claiming a condition of'n❑ exposure"and obtaining an exclusion from NPQES stormwater permitting. I certify under penalty of law that there are no discharges of stormwater contaminated by exposure to industrial activities or materials from the industrial facility or site identified in this document(except as allowed under 40 CPR 122.26(g)(2)}. i understand that I am obligated to annually self re-certify No Ex osura and, if requested, submit the re-certification to ❑WO or the operator of the local municipal separate storm sewer system(MS4)into which the facility discharges(where applicable). I understand that I must allow the North Carolina Division of Water Quality,or MS4 operator where the discharge is into the local MS4,to perform inspections to confirm the condition of no exposure and to make such inspection reports publicly available upon request. In the event that the site no longer qualifies for a No Exposure Exclusion, I understand that I must obtain coverage under an NPI7ES permit prior to any point source discharcle of stormwater from the facility.Additionally; I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information,the information submitted is to the best of my knowledge and belief true,accurate and complete. I am aware that there are significant penalties for submitting false information,including the possibility of fine and imprisonment for knowing violations. I certify that I am familiar with the information contained in this application and that to the best of my knowledge and belief such information is true, complete,and accurate. Printed Name of Person Signing: Title: ow YJ4r J (Sig Lure of Applic nl) (Oafs Signed) Please note: This application for the No Exposure Exclusion is subject to approval by the NCDENR Regional Office prior to issuance. The Regional Office may inspect your facility for compliance with no exposure conditions prior to that approval. The Regional Office may also inspect your facility at anytime in the future for compliance with the No Exposure Exclusion- North Carolina General Statute 143-215.6 B(i) provides that: Any person who knowingly makes any false statement,representation,or certification in any application,record,report,plan,or other document filed or required to be maintained under this Article or a rule implementing this Article;or who knowingly makes a false statement of a material tact in a rulemaking proceeding or contested case under this Article;or who falsifies,tampers with,or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the [Environmental Management]Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars($10,000). There is currently no fee for a No Exposure Exclusion. Page 6 of 7 5W u-NE-12Aug20l 0 NCGNE00O0 No Exposure Certification Final Checklist This application should include the following items: ❑ This completed application and all supporting documentation. ❑ A map with the location of the facility clearly marked. ❑ If the site currently has an NPDES Stormwater Permit, be sure to indicate the permit number in Question 8. Mail the entire package to: Stormwater Permitting Unit Division of Water Quality 1617 Mail Service Center Raleigh, North Carolina 27699-1 61 7 Dote The submission of this document does not guarantee the issuance of a No Exposure Exclusion. For questions,please contact the DWQ Regional Office for your area. DWO Regional Office Contact Information: Asheville Office ...... (828)296-4500 win to ale Fayetteville Office ... (910)433-3300 /-L Mooresville Office... (704)663-1699 ,.. s ;►� - Raleigh Office ........ (919) 791-4200 'lle or le Washington Office ...(252)946-6481 Wilmington Office ... (910)796-7215 Winston-Salem (336) 771-5000 e" ilia Central Office .........(919)807-6300 Wil nglon r Page 7 of 7 SWt]-NE-12Aug2016 NCDENR North Carolina department of Environment and Natural Resources Division of Energy, Mineral, and Land Resources Land Quality Section Tracy E.Davis, PE, CPM Pat McCrory,Governor Director John E. Skvarla, III, Secretary 12 November 2013 Mr.lames R. D.Sutherland,Vice President Sutherland Products, Inc. 203 North 1"Avenue Mayod an, NC 27027 Subject: Compliance Evaluation Inspection NPDES General Stormwater Permit NCG060000 Certificate of Coverage NCG060347 Charlie's Soap Rockingham County Dear Mr.Sutherland: Aana Taylor-Smith and Sue White of the Winston-Salem Regional Office of the NC Division of Energy, Mineral,and Land Resources{DE MLR}conducted a compliance evaluation inspection at the subject facility on 12 November 2013.You r ass ista n ce and cooperation during the inspection were greatly appreciated.An inspection checklist is attached for your records and the inspection findings are summarized below. This facility is located at 203 North 1"Avenue in Mayodan, Rockingham County, North Carolina.Stormwater related to industrial activity is discharged from the site to the Maya River,this segment of which is currently classified as Class C Waters, in the Roanoke River Basin. Documentation&Monitoring Review The facility's Stormwater Pollution Prevention Plan (SPPP) is in development, but contains all of the required elements and is up to date.Qualitative and analytical monitoring have not yet been completed, but the permit was just issued in May 2013.The facility has one Stormwater Discharge DutfaII (SDO)that discharges Stormwater related to industrial activity. Site Review The facility is clean and well-maintained.Secondary containment is implemented as required.The outfaII was inspected and found to be in good order. No evidence of erosion or instability at the Soo was observed and the receiving stream was free of pollution indicators. During the inspection,it was noted that this facility would qualify for No Exposure Certification,which would eliminate the need for the NCG060000 General Stormwater Permit. For more information on No Exposure Certification, please visit our website at the following link: http://PortaI.ncdenr.org/we6J1r=/npdes-stormwater#tab-5 Winston-Salem Regional Office 585 Waughtown Street,Winston-Salem, NC 27101 e Phone:336-771-50001 FAX:336-771-4631 Charlie's Soap 11/12/2013 Page 2 of 2 We appreciate your efforts to comply with the stormwater permit and the proactive steps taken to identify and eliminate potential sources of pollution. No additional response to this letter is required. Should you have any questions regarding the NCGO60000 permit, No Exposure Certification, or this inspection, please do not hesitate to contact Ms.Taylor-Smith or me at(336)771-5000. Sincerely, Matthew E. Gantt, P Regional Engineer Land Quality Section Enclosures: SIMS inspection Checklist cc: Central Files WSRO/LQ Compliance Inspection Report Permit: NCGO60347 Effective: 05/15/13 Expiration: 10/31/17 owner: Sutherland Products Inc SOC: Effective: Expiration: Facility: Charlie's Soap County: Rockingham 203 N 1 st Ave Region: Winston-Salem Mayodan NC 27027 Contact Person: James R D Sutherland Title: Phone: 336-548-6035 Directions to Facility: 68 north to 220 north take exit 704 west 1.5 mi rt on s market st.5 mi to 3rd left on decatur st 2.5 mi to rt on a jefferson st left on north 1st ave sit rt. System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On-Site Representative(s): Related Permits: Inspection Date: 11/12/2013 Entry Time: 09:30 AM Exit Time: 10:30 AM Primary Inspector: Aana Taylor-Smith Phone: 336-771-5000 Secondary Inspector(s): Sue White Phone: Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Food/Tobacco/Soaps/Cosmetics/Public Warehousing Stormwater Discharge COC Facility Status: ■ Compliant Q Not Compliant Question Areas: storm Water (See attachment summary) Page: 1 Permit: NCGO60347 Owner-Facility: Sutherland Products Inc Inspection Date: 1 111 21201 3 inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Please refer to attached inspection summary letter. Stormwater Pollution Prevention Plan Yes No NA Nt= Does the site have a Stormwater Pollution Prevention Plan? ■ ❑ ❑ ❑ #Does the Plan include a General Location(USGS)map? ■ fi Cl ❑ #Does the Plan include a"Narrative Description of Practices"? ■ ❑ n fl #Does the Plan include a detailed site map including cutfall locations and drainage areas? ■ ❑ ❑ ❑ #Does the Plan include a list of significant spills occurring during the past 3 years? ■ ❑ ❑ ❑ #Has the facility evaluated feasible alternatives to current practices? ■ ❑ 0 ❑ #Does the facility provide all necessary secondary containment? ■ ❑ ❑ ❑ #Does the Plan include a BMP summary? ■ ❑ ❑ ❑ #Does the Plan include a Spill Prevention and Response Plan(SPRP)? ■ ❑ ❑ ❑ #Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ■ ❑ ❑ ❑ #Does the facility provide and document Employee Training? ■ ❑ ❑ ❑ #Does the Plan include a list of Responsible Party(s)? ■ ❑ ❑ ❑ #Is the Plan reviewed and updated annually? ■ ❑ ❑ Q #Does the Plan include a Stormwater Facility inspection Program? ■ ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ■ ❑ ❑ ❑ Comment. Plan was in development but looks good. Permit and Outfalls Yes No NA NE #Is a copy of the Permit and the Certificate of Coverage available at the site? ■ ❑ El 0 #Were all outfalls observed during the inspection? ■ ❑ ❑ ❑ #If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ■ ❑ #Has the facility evaluated all illicit(non stormwater)discharges? ■ ❑ ❑ ❑ Comment: Recommend applying for No Exposure Certification Page: 2 FOR AGENCY USE ON Y Division of Water Quality 1 Surface Water oe"R°`�« 3 4'aar M_ Unr Protection Section # C:crtiRale nfS'm•crn NCDENR National Pollutant Discharge Elimination System now+n GRTNH on,Y.,.��p. [x..npwty-�yy Nivynq�1WJ4'%• NCG060000 Nnnit Ai pwI,o NOTICE OF INTENT National Pollutant Discharge Elimination System application for coverage under G NCG060000: Pr t WIC I STORMWATER DISCHARGES associated with activities classified as, SIC(Standard Industrial Classification)20 Food and Kindred Products APR 2 4 2013 SIC 21 Tobacco Products SIC 283 Drugs G SIC 284 Soaps, Detergents, &Cleaning Preparations; Perfumes,Cosmetics, & er oil trance► Preparations SIC 422 Public Warehousing and Storage(except 4226) For questions,please contact the DWQ Regional Office for your area. See page 4. Do Not use this NOI for renewals. (Please print or type) 1) Mailing address of owner/operator address to which al permit correspondence will be m Name Sutherland Products,Inc, Street Address 203 North I"Ave, City Mayodan State NC ZIP Code 27027 Telephone No. (336) 548-6035 Fax: (336)548-3626 2) Location of facility producing discharge: Facility Name Charlie's Soap Facility Contact James R. D.Sutherland, Vice President Facility Address 203 North 1"Ave. Facility City Mayodan� State NC ZIP Code 27027 Facility County Rockingham Telephone No. (336)548-6035 _ Fax: (336)548-3626 Email jamee@charllesoap.com 3) Physical Location Information: Please provide a narrative description of how to get to the facility(use street names, state road numbers,and distance and direction from a roadway intersection). fib North to 220 North;take exit 704 West 1.5 mi.; right on S. Market St.;0.2 mi to 3rd left on Decatur St.; 2.2 mi to right on E.Jefferson St.; left on North 1"Ave.site right. (A copy of a county map or USG quad sheet with the facilily clearly located must be submilfed with this applicatlon-} 4) Latitude-36944'20'N -Long itude_80°02'47"W (deg,min,sec) 5) This NPDES Permit Application applies to which of the following: ❑ New or Proposed Facility Date operation is to begin x Existing Page 1 of 4 SVVU-221 - Last revised 11115fl2 vw . z _>I .. _ �- ^� L7 _ r f �". __sF•�-� _ .:_ •'`" _ �.1�.'_�'� •- - 'r%• .. - -- -fir'=t"ft' I' gr ol 1, 1'. tm It r� A ti,.���• I l •'L �I .II-!�;[•��.'�•_�/'yam• .i. - .��..-.�-- �� ---`�•• _J + 't. -. ...r.....1.". M '{:�.. ". _.---._j_..._- f_ .j . NCG060000 N.O.I. 6) Standard Industrial Classification: Provide the 4-digit Standard Industrial Classification code(SIC code)that describes the primary industrial activity at this facility. SIC code; 2841 T) Activities a) Provide a brief narrative description of the types of industrial activities and products manufactured at this facility: Dry components are mixed to produce dry detergent and liquid components are mixed to produce liquid detergent. Components and mixtures are stored on-site as needed to meet demand. b)Check all activities occurring at this facility: ❑ use or process meats ❑ use or process animal fats/byproducts 8) Discharge points 1 Receiving waters: How many discharge points(ditches, pipes, channels,etc.)convey stormwater from the property?2 What is the name of the body or bodies of water{creek, stream, river,lake, etc.)that the facility storm ater discharges end up in?Mayo River 5��6,ks,;] p3—a z-o�• Clla C ' sfr, zg_3o-{j Receiving water classification:_Class"C" Is this a 303(d)listed stream?,No Has a TMDL been approved for this watershed? If the site stormwater discharges to a separate storm sewer system, name the operator of the separate storm sewer system(e.g. City of Raleigh municipal storm sewer). 9) Does this facility have any other NPDES permits? X No ❑ Yes if yes, list the permit numbers for all current NPDES permits for this facility: 10)Does this facility have any Non-Discharge permits (ex: recycle permit)? X No ❑ Yes If yes, list the permit numbers for all current Non-Discharge permits for this facility: 11) Does this facility employ any best management practices for stormwater control? x No ❑ Yes(Show any structural BMPs on the site diagram.) If yes, please briefly describe: 12) Does this facility have a stormwater Pollution Prevention Plan? X No ❑ Yes If yes,when was it implemented? 13)Are vehicle maintenance activities occurring at this facility? X No ❑ Yes SVW-221 Page 2 of 4 Last revised 1 Ill 5/12 NCG060000 N.O.I. 14) Hazardous Waste: a) is this facility a Hazardous Waste Treatment, Storage, or Disposal Facility? x No ❑ Yes by Is this facility a Small Quantity Generator(less than 1000 kg. of hazardous waste generated per month) of hazardous waste? X No ❑ Yes c) is this facility a Large Quantity Generator(1000 kg. or more of hazardous waste generated per month)of hazardous waste? X No ❑ Yes d) Is hazardous waste stored in the 100-year flood plain? X No ❑ Yes If yes, include information to demonstrate protection from flooding. e) If you answered yes to questions b. or c., please provide the following information: Type(s)of waste' How is material stored: Where is material stored: How many disposal shipments per year: Name of transport I disposal vendor Vendor address: 15)Certification: North Carolina General Statute 143.215.6E(i)provides that: Any person who knowingly makes any false statement, representation,or certification in any application, record,report, plan, or other document fled or required to be maintained under this Article or a rule implementing this Article:or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article;or who falsifies,tampers with,or knowingly renders Inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars($10,000). I hereby request coverage under the referenced General Permit. I understand that coverage under this permit will constitute the permit requirements for the discharge(s)and is enforceable in the same manner as an individual permit. I certify that I am familiar with the information contained in this application and that to the best of my knowledge and belief such information is true,complete,and accurate. Printed Name of Person Signing:James R. D.Sutherland Title;VIWPresident .r- { mature of Applicant (Date y igned) This Notice of Intent must be accompanied by a check or money order for$100,00, made payable to. NCDENR.❑o not send the check or money order separately, Page 3 of 4 SWU-221 Last revised 11115/12 Green Mountain Engineering, PLLC Civil Engineering Consultants T To. NCDENR, DWQ, Storm-water Permitting Unit, D WQ Adder: 1617 Mail Service Center, Raleigh, NC 27699-1617 From:Vincent C. Townsend, PE, PLS, Green Mountain Engineering, PLLC Date: W2512013 Re; 203 North I"Ave., Mayodan, NC Messages Mike, Attached please find the Following; 1. One completed NPDES NCG060000 General Permit Application. 2. One check payable to NCDENR in the amount of$100.00 to cover the application fee. 3. One 8-112"xI I"USGS map taken from a 2007 USGS Mayodan,NC 7.5 minute quadrangle map. 4. One copy of a site survey map showing topography done by Vaughn Surveying Company,Inc. Notations and highlighted information was added to the sheet as needed to fulfill the requirements of this application. Please let me know if you have any questions or require additional information. I can be reached via email vincegp—reenmountain ngineers.com or by telephone(336-255-8395)at your convenience. Best Regards, r� Vir�ccrrt C. Townsend, E'E, S 609 Stafford Pointe Court - flak Ridge, NC 27310 - (336) 298-7021 � � }'P}prd P►p pl'}' �}►a0 � � }P}j�p}}pp Pr'rp}py}9rp9 - }e'►.PPPpP¢fdpp¢` - }*PPi} 6 q y}4 ,7'pr ►}79 M*rVSb P9}p ��.. .. dV�fy vPrfp}47or7r�p - ¢ }p}pp}}► 9PP} 4a}} _ _ .. � e }�Pbpti}ap¢�:P 799 Pgpga} Li � � '�}i°kPs°�'�r6► � LI-- �._ -� KELLAM 01 0•,IIIC. LIJ \ z w4ftiml.Li so ohp oh 15" R.QP _ / V) CATCH BASIN BEPCHMARK, TOP OF. / INV, = 595.32 XATCH BASIN �4 `TOP 6O2.6C ITV, 596,1 0 SAN. M.H. s s TOP = 601.77 —. INV. = 596.17 4NV. 593.12 a Ep )CASE 44.yi g,4d-�,�QaA.4 �QdS a646p 6aq qA p440+��A Gp�p a:i•y tl'6 Fitt' .;'... �f f.�.7.Fr k.�i. ,. �ti a{iiaq 46q�4AYp+ 4a-b 4 44ep 41.16a+.d e4 qA-4<°p46q{A6dA •1 i}ti•`�Y�G,; n ..�: ,. .Od da 44q pqd 4ad d 4ada Aa.4.d ddde 94{ q �•al'�� .i a .�f�., 1 yy.. ! Aa;4g44gdddqda a Sqd�-0'ad¢gd 44a464A�4Ad4a aggq6a q4 tld dA ggdE A64 S44a4±C dda0 g4A6p .•+.Y yH ,!•4i R..l�', .+7i L5 yA6�d�ddcgpdd�.ay4egnn4a689 e4 a � ter:,•%-.� '' Y `�..�.._._ ._. . 4.y`��d 6La 44444 {+Y.� '1 �•; :_�� �� LY' SS - 'ANI (�8 Z L. 89 s 'ANI Z9'889 : d01 ; —_—_ 440 `v Str9� 30dd - 2 l9 xQ08 033C ❑NV (Z2P1 Si:DV 1) 9212 3:DVd - $-VL >1008 MG 33S 30N30A38 #.207 t��l�. ,� �� •;.. ��� &1lkLO 7a � TWO STORY lye •' � t3�y� ti. +•'.; '.'+ ::;;: :,. OADING DOCK •, �,u ''W:�.;. ELEV. 607,56 - CMU RE7, WALL ''TTDR.','. 2.50 �`'� 60 An ohp ��dhp! EIP _ tihp vhp N - - 18'42'55 1=•..w N 190 150;00 r - - � 1 i I ' B" SAN. SEWER -S Ist AVENUE, 60 ' r 21001 . 9 ? 0 , 482 =R MANHOLE =R LINE NER LINES PHONE LINES D 20 GRAPHIC 4yaw xvv�C,CQ-9-5 -.7 -241! 10,7 140 jqo DS A O-�8ON 68 r 'f Q ,r kPQY' S 151 y SEAL r rn e •9 p •e,rlii-N%(V .•• setwiN.4. 1-tamps L Po c.c.)6 c',5 4/ Sf r3 %A CAR �Ulllgtfrri -- �� 'F fin'++ nru+►► .i BOUNDARY AND TOPOGRAPHIC SURVEY FOR b'Hl LOH PR-r.lT S -C �r':. ... 1 N f SITUATED IN THE TOWN, OF MAYCDAN, N.C. MADIS0N t N'SHI1P ROCKINGHAM COUNTY, N.C. SCALE 1" ; 20 ' FEBRUARY 16, 2005 VA'U HN.,,SURVEYING COMPANY, O M'PAN Y,fIN C. � A116 S. 1A5RKW 8L � ON , -iC. 27025 (336.) 427 0512 inf601.at hnsurueuimam mm, ■ df'3MaOW la8VM03 '0 A2 Q3WWA83d A3Aans Id HdV6 Od41 'pN 'S7d 'NHD(IVA .INOHINV A '3NI "00 ONLUAW)S NHSnVA �,8 L73WWA63d amp nS J+ jVCINnoa Td:S ON d.VM AiINJOIA Al s Al 1TI 3L;S )V D=D )V 1 0 )D s lbw 3 R STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO.NCG060000 TO DISCHARGE STORMWATER UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM for establishments primarily engaged in the Following activities: Food and Kindred In compliance with the provisions of North Carolina General Statute 143-215.1,other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission and the Federal Water Pollution Control Act,as amended,this permit is hereby issued to all owners or operators, hereinafter permittees,which are covered by this permit as evidenced by receipt of a Certificate of Coverage by the Environmental Management Commission to allow the discharge of stormwater to the surface waters of North Carolina or to a separate storm sewer system conveying discharges to surface waters in accordance with the terms and conditions set forth herein, Coverage under this General Permit is applicable to: 4 All owners or operators of stoianwater point source discharges associated with activities classified as establishments primarily engaged in activities classified as: o Food and Kindred Products [standard industrial classification(SIC) 20], o Tobacco Products (SIC 21), a Soaps,Detergents and Cleaning Preparations;Perfumes,Cosmetics and Other Toilet Preparations(SIC 284), ❑ ❑rugs(SIC 283),and a Public Warehousing and Storage(SIC 4221-4225), + Stormwater point source discharges from like industrial activities deemed by The Division of Water Quality(DWQ)to be similar to these operations in the process,or the discharges,or the exposure of raw materials,intermediate products,by-products,products,or waste products. The General Permit shall become effective on December 1,2012. The General Permit shall expire at midnight on October 31,2017. Signed this day November 26.2012. Original signed by Matt Matthews for Charles Wakild,P.E.,Director Division of Water Quality By the Authority of the Environmental Management Commission Permit No.NCG0600DO TABLE OF CONTENTS PART I INTRODUCTION Section A: General Permit Coverage Section B: Permitted Activities PART 11 MONITORING,CONTROLS,AND LIMITATIDNS FOR PERMITTED DISCHARGES Section A: Stormwater Pollution Prevention Plan Section B. Analytical Monitoring Requirements Section C: On-Site Vehicle and Equipment Maintenance Monitoring Requirements Section D: Qualitative Monitoring Requirements Section E. Assessment of Best Management Practices (BMPS) PART Ii] STANDARD CON DITIDNS FOR NPDES STORMWATER GENERAL PERMITS Section A: Compliance and Liability 1, Compliance Schedule 2. Duty to Comply 3. Duty to Mitigate 4. Civil and Criminal Liability S. Oil and Hazardous Substance Liability G. Property Rights 7. Severahility 8. Duty to Provide Information 9. Penalties for Tampering 10, Penalties For Falsification of Reports 11, Onshore or Offshore Construction 12. Duty to Reapply Section B: General Conditions 1. General Permit Expiration 2. Transfers 3. When an Individual Permit May be Required 4. When an Individual Permit May be Requested S. Signatory Requirements Permit No.NCG060000 6. General Permit Modification, Revocation and Reissuance, or Termination 7. Certificate of Coverage Actions 8. Annual Administering and Compliance Monitoring Fee Requirements Section C: Operation and Maintenance of Pollution Controls 1. Proper Operation and Maintenance 2. Need to Halt or Reduce not a Defense 3. Bypassing of Stormwater Control Facilities Section D: Monitoring and Records 1. Representative Sampling 2. Recording Results 3. Flow Measurements 4. Test Procedures 5. Representative Outfall 6. Records Retention 7. Inspection and Entry Section E: Reporting Requirements 1. Discharge Monitoring Reports 2. Submitting Reports 3. Availability of Reports 4. Non-Stormwater Discharges 5. Planned Changes 6. Anticipated Noncompliance 7. Spills 8. Bypass 9, Twenty-four Hour Reporting 10. Other Noncompliance 11. Other Information PART IV DEFINITIONS ii Pert-nit No.NCG060000 PART I— INTRODUCTION SECTION A: GENERAL PERMIT COVERAGE All persons desiring to have Facilities covered by this General Permit must register with the Division of Water Quality(DWQ)by the Filing of a Notice of Intent(NO I)and applicable Fees,The NO shall be submitted and a certificate of coverage issued prior to any point source discharge of stormwater associated with industrial activity to the surface waters of the state. Any owner or operator not wishing to be covered or limited by this General Permit may make application far an individual NPDES permit in accordance with NPDES procedures in 15A NCAC 2H .0100,stating the reasons supporting the request. Any application for an individual permit should be made at least 180 days prior to commencement of discharge. This General Permit does not cover activities or discharges covered by an individual NPDES permit until the individual permit has expired or has been revoked. Any person conducting an activity covered by an individual permit but which could be covered by this General Permit may request that the individual permit be revoked and coverage under this General Permit be provided. If industrial materials and activities are not exposed to precipitation or runoff as described in 40 CFR§122.26(g),the facility may quatify for a No Exposure Exclusion From NPDES stormwater discharge permit requirements. Any owner or operator wishing to obtain a N❑ Exposure Exclusion must submit a No Exposure Certification Notice of Intent(NOl) form to the Division;must receive approval by the Division; must maintain no exposure conditions unless RLIthorized to discharge under a valid NPDES stormwater permit; and must recertify the No Exposure Exclusion annually. Any facility may apply Far new or continued coverage under this permit until a Total Maximum Daily Load (TM DL) for pollutants for stormwater is established. A TMDL sets a pollutant-loading limit that affects a watershed,or portion of a watershed,draining to a specific impaired water. For discharges to watersheds affected by a TMDL,coverage under this permit may depend on the facility demonstrating it does not have reasonable potential to violate applicable water quality standards for those pollutants as a result of discharges. If DWQ determines that discharges have reasonable potential to cause water quality standard violations,the facility shall apply For an individual permit 180 days prior to the expiration date of this General Permit, Once that individual permit is effective,the Facility will no longer have coverage under this General Permit. Note that the permittee must identify impaired waters(scheduled for TMDL.development) and waters already subject to a T M D L in the Site Plan,as outlined in the stormwater Pollution Prevention Plan,Part ll,Section A. During the period beginning on the effective date of the permit and lasting until expiration,the permittee is authorized to discharge stormwater associated with industrial activity. Such discharges shall be controlled,limited and inoititored as specified in this permit. Part 1 Page 1 of 2 Permit No.NCG060000 SECTION B: PERMITTED ACTIVITIES Until coverage under this permit expires or is modified or revoked,the permittee is authorized to discharge stormwater to the surface waters of North Carolina,or to a separate storm sewer system, which has been adequately treated and managed in accordance with the terms and conditions of this General Permit. Any other point source discharge to surface waters of the state is prohibited unless it is an allowable non-stormwater discharge or is covered by another permit,authorization,or approval. The discharges allowed by this General Permit shall not cause or contribute to violations of Water Quality Standards. This permit does not relieve the permittee's responsibility for compliance with any other applicable federal,state,or Iocal law,rule,standard,ordinance,order,or decree. Part I Page 2 of 2 Permit No.NCG060000 PART II--MONITORING,CONTROLS,AND LIMITATIONS FOR PERMITTED DISCHARGES SECTION A: STORMWATER POLLUTION PREVENTION PLAN The permiittee shall develop and implement a Stormwater Pollution Prevention Plan (SPPP). The SPPP shall be maintained on site unless exempted from this requirement by the Division. The SPPP is public information in accordance with Part III,Standard Conditions,Section E,paragraph 3 of this permit. The SPPP shall include,at a minimum,the following items: 1. Site Overview. The Site Overview shall provide a description of the physical facility and the potential pollutant sources that may be expected to contribute to contamination of stormwater discharges. The Site Overview shall contain the Following: (a) A general location map(USGS quadrangle snap or appropriately drafted equivalent map), showing the facility's location in relation to transportation routes and surface waters;the name of the receiving waters to which the stormwater outfalls discharge,or if the discharge is to a municipal separate storm sewer system,the name of the municipality and the ultimate receiving waters;and accurate latitude and longitude of the points of stormwater discharge associated with industrial activity. The general location map (or alternatively the site map)shall identify whether any receiving waters are impaired (on the state's 303(d) list of impaired waters) or if the site is located in a watershed for which a TMDL has been established,and what the parameters of concern are. (b) A narrative description of storage practices,loading and unloading activities,outdoor process areas,dust or particulate generating or control processes,and waste disposal practices. A narrative description of the potential pollutants that could be expected to be present in the stormwater discharge from each outfall, (c) A site map drawn at a scale sufficient to clearly depict: the site property boundary; the stormwater discharge outfalls;all on-site and adjacent surface waters and wetlands; industrial activity areas (including storage of materials,disposal areas,process areas, loading and unloading areas,and haul roads);site topography and finished grade;all drainage features and structures;drainage area boundaries and total contributing area for each❑utfall;direction of Flow in each drainage area;industrial activities occurring in each drainage area;buildings;stormwater Best Management Practices(BMPs); and impervious surfaces. The site map inust indicate the percentage of each drainage area that is impervious,and the site map must include a graphic scale indication and north arrow. (d) A list of significant spills or leaks of pollutants during the previous three (3)years and any corrective actions taken to mitigate spill impacts. (e) Certification that the stormwater outfalls have been evaluated for the presence of 11on- stormwater discharges. The permittee shall re-certify annually that the stormwater outfalls have been evaluated for the presence of non-stormwater discharges. The certi Fi cation statement will be signed in accordance with the requirements Found in Part Ill, Standard Conditions,Section B,Paragraph 3. Part I Page 1 of 12 Permit No.NCGO60000 2. Stormwater Management Strategy, The Stormwater Management Strategy shall contain a narrative description of the materials management practices employed which control or minimize the stormwater exposure of significant materials,including structural and nonstructural measures. The Stormwater Management Strategy,at a minimum,shall incorporate the following: (a) Feasibility Study. A review of the technical and economic Feasibility of changing the methods of operations and/or storage practices to eliminate or reduce exposure of materials and processes to rainfall and run-on flows. Wherever practical,the permittee shall prevent exposure of all storage areas,material handling operations,and manufacturing or fueling operations. In areas where elimination of exposure is not practical,this review shall document the feasibility of diverting the stormwater run-on away from areas of potential contamination, (b) Secondary Containment Requirements and Records. Secondary containment is required for, bulk storage of liquid materials including petroleum products;storage in au amount of Section 313 of Title Ill of the Superfund Amendments and Reauthorization Act (SARA)water priority chemicals;and storage in any amount of hazardous substances,in order to prevent leaks and spills from contaminating stormwater runoff, A table or summary of all such tanks and stored materials and their associated secondary containment areas shall be maintained. If the secondary containment devices are connected to stormwater conveyance systems,the connection shall be controlled by manually activated valves or other similar devices(which shall be secured closed with a locking mechanism). Any stormwater that accumulates in the containment area shall he at a minimum visually observed for color,foam,outfall staining,visible sheens and dry weather flow,prior to release of the accumulated stormwater, Accumulated stormwater shall be released if found to be uncontaminated by any material. Records documenting the individual making the observation,the description of the accumulated stormwater,and the date and time of the release shall be kept for a period of five(5)years. For facilities subject to a federal oil Spill Prevention,Control,and Countermeasure Plan(SPCC),any portion of the SPCC plan fully compliant with the requirements of this permit may be used to demonstrate compliance with this permit. (c) BMP Summary. A listing of site structural and non-structural Best Management Practices (BMPs) shall be provided. The installation and implementation of BMPs shall be based on the assessment of the potential for sources to contribute significant quantities of pollutants to stormwater discharges and on data collected through monitoring of stormwater discharges. The BMP Summary shall include a written record of the specific rationale for installation and implementation of the selected site BMPs. The BMP Summary shall be reviewed and updated annually, 3. Spill Prevention and Response Procedures, The Spill Prevention and Response Procedures (SPRP)shall incorporate an assessment of potential pollutant sources based on a materials inventory of the facility.Facility personnel responsible for implementing the SPRP shall be identified in a written list incorporated into the SPRP and signed and dated by each individual acknowledging their responsibilities for the plan. A responsible person shall be on-site at all times during facility operations that have the potential to contaminate stormwater runoff through spills or exposure of materials associated with the facility operations. The SPRP must be site stormwater specific. Therefore,an oil Spill Prevention Control and Countermeasure plan (SPCC) may be a component of the SPRP,but may not be sufficient to completely address the stormwater aspects of the SPRP. The common elements of the SPCC with the SPRP may be incorporated by reference into the SPRP. Part 11 Page 2 of 12 Permit No.NCG060000 4. Preventative Maintenance and Good Housekeeping Program. A preventative maintenance and good housekeeping program shall be developed and implemented. The program shall address all stormwater control systems(if applicable),stormwater discharge outfalls,all on-site and adjacent surface waters and wetlands,industrial activity areas (including material storage areas,material handling areas,disposal areas,process areas,loading and unloading areas,and haul roads),all drainage features and structures,and existing structural BMPs. The program shall establish schedules of inspections,maintenance,and housekeeping activities of stormwater control systems,as well as facility equipment,facility areas,and facility systems that present a potential for stormwater exposure or stormwater pollution where not already addressed under another element of the SPPP, Inspection of material handling areas and regular cleaning schedules of these areas shall be incorporated into the program. Timely compliance with the established schedules for inspections,maintenance,and housekeeping shall be recorded and maintained in the SPPP, S. Facility Inspections. Inspections of the facility and all stormwater systems shall occur as part of the Preventative Maintenance and Good Housekeeping Program at a minimum on a semi- annual schedule,once during the first half of the year[January to]une),and once during the second half(July to December),with at least 60 days separating inspection dates (unless performed more frequently than semi-annually). These facility inspections are different from, and in addition to,the stormwater discharge characteristic monitoring at the outfalls required in Part lI B,C,and D of this permit, 6. Employee Training. Training programs shall be developed and training provided at a minimum on an annual basis for facility personnel with responsibilities for, spill response and cleanup,preventative maintenance activities,and for any of the facility's operations that have the potential to contaminate stormwater runoff. The facility personnel responsible for implementing the training shall be identified, and their annual training shall be documented by the signature of each employee trained. 7. Responsible Patty. The SPPP shall identify a specific position or positions responsible for the overall coordination,development,implementation,and revision of the SPPP. Responsibilities far all components of the SPPP shall be documented and position assignments provided. 8. SPPP Amendment and Annual Update. The permittee shall amend the SPPP whenever there is a change in design,construction,operation,site drainage,maintenance,or configuration of the physical features which may have a significant effect on the potential For the discharge of pollutants to surface waters. All aspects of the SPPP shall be reviewed and updated on an annual basis.The annual update shall include: (a) an updated list of significant spills or leaks of pollutants For the previous three(3) years,or the notation that no spills have occurred (element of the Site Overview); (b) a written re-certification that the stormwater outfalls have been evaluated for the presence of non-stormwater discharges (element of the Site Overview); (c) a documented re-evaluation of the effectiveness of the on-site stormwater BMPs (BMPSummary element of the Stormwater Management Strategy). (d) a review and comparison of sample analytical data to benchmark values(if applicable) over the pastyear,including a discussion about Tiered Response status. The permittee shall use the Division's Annual Summary Data Monitoring Report (DMR) form,available from the Stormwater Permitting Unit's website(See 'Monitoring Forms'here:httl2:llportgl.ncdeiir.org/web/wq/ws/sti/npdess��]. Part[I Page 3 of 12 Permit No.NCG060000 The Director may notify the permittee when the SPPP does not meet one or more of the minimum requirements of the permit. Within 30 days of such notice,the permittee shall submit a time schedule to the Director for modifying the SPPP to meet minimum requirements. The permittee shall provide certification in writing(in accordance with Part III,Standard Conditions,Section B,Paragraph 3) to the Director that the changes have been made. 9. SPPP Implementation. The permittee shall implement the Stormwater Pollution Prevention Plan and a[[appropriate BM Ps to prevent contaminants From entering surface waters via storrnwater. Implementation of the SPPP shall include documentation of all monitoring, measurements,inspections,maintenance activities,and training provided to employees, including the log of the sampling data and of actions taken to implement BMPs associated with the industrial activities,including vehicle maintenance activities. Such documentation shall be kept on-site for a period of five(5)years and made available to the Director or the Director's authorized representative immediately upon request. Part II Page 4 of 12 Permit No.NCG06000❑ SECTION B: ANALYTICAL MONITORING REQUIREMENTS Analytical monitoring of stormwater discharges shall be performed as specified in Table 1. All analytical monitoring shall be performed during a measureable storm event at each stormwater discharge 0Utfall (SD0). Only SDOs discharging stormwater associated with industrial activity must be sampled (See Definitions), A measurable storm event is a storm event that results in an actual discharge From the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period,and the permittee ❑Mains approval From the local DWQ Regional Office, See Definitions, Table 1. Analytical Monitoring Requirements Discharge Measurement Sample Sample Characteristics Units Fre uenc 1 Type2 Locations 1)H standard semi-annual Grab SDO Total suspended Solids nt L semi-annual Grab SDO Oil&Grease m L semi-antattal Grab SDO Fecal Coliform4 per 100 in[of semi-annual Grab SDO Freshwater Enterococci 4 per 100 nil of semi-annual Grab SDO saltwater Chemical Oxygen Demand inglL semi-annual Grab SD❑ Total Rainfalls inches semi-annual Rain Gauge Footnotes: 1 Measurement Frequency: Twice per year during a measureable storm event. 2 Grab samples shall be collected within the first 30 minutes of discharge. 3 Sample Location: Samples shall be collected at each stormwater discharge outfall(SDO)unless representative outfall status(ROS)has Been granted. A copy of the letter granting RDS shall be kept on site. DWQ's RO5 letter remains in effect through subsequent reissuance of this permit and as long as the pertinent site conditions and operations remain unchanged,unless the ROS letter provides for other conditions or duration. 4 Fecal Conform satripliiig applicable only to facilities discharging to fr eshwater s t h at prooess meats, EnterocoCd satrtpIing applicable only to facilities discharging,to sal twater s t h at process rn eat s. 5 For each sampled meas tire able storm event,the total precipitation must be recorded. An on-site rain gauge or[opal rain gauge reading must be recorded. Where isolated sites are unmanned for extended periods of time,a local vain gauge reading may be substituted for an on-site reading. The permittee shall complete the analytical samplings in accordance with the schedule specified below in Table 2,unless adverse weather conditions prevent satnple collection [see Adverse Weather in Definitions]. A minimum of 60 days must separate Period 1 and Period 2 sample dates,unless monthly monitoring has been instituted as part of other requirements of this permit. Inability to sample because of adverse weather cotditions must be documented in the SPPP and recorded on the DMR. The permittee must report the results from each sample taken within the Part 11 Page 5 of 12 Permit No.NCG060000 monitoring period(see Part 111,Section E). Sampling is not required outside of the facility's normal operating hours. Table 2. Monitoring Schedule Monitoring periodLz Sample Number start land Year 1 --Period 1 1 January 1,2013 June 30,2013 Year 1 -Period 2 2 July 1,2013 December 31,2013 Year 2 -Period 1 3 January 1,2014 June 30,2014 Year 2 -Period 2 4 July 1,2014 December 31,2014 Year 3-Period 1 5 January 1,2015 June 30,2015 Year 3-Period 2 6 July 1,2015 December 31,2015 Year 4- Period 1 7 January 1, 2016 June 30,2016 Year 4_Period 2 8 July 1,2016 December 31,2016 Year 5-Period 1 9 January 1,2017 June 30, 2017 Year 5 -Period 2 10 July 1,2017 October 31,2017 Footnotes: I Maintain semi-annual analytical monitoring throughout the permit renewal process[unless other provisions of this permit prompt monthly sampling]. 2 if no discharge occurs during the sampling period,the permittee must submit a monitoring report indicating"No FIow"or"No Discharge"within 30 days of the end of the sampling period. Failure to monitor semi-annually per permit terms may result in the Division requiring monthly monitoring for all parameters for a specified time period. "No discharge"from an outfall or inability to collect a sample because of adverse weather conditions during a monitoring period,for example,does not constitute Failure to monitor,as long as it is properly reported. The permittee shall compare monitoring results to the benchmark values in Table 3. The benchmark values in Table 3 are not permit limits but should be used as guidelines for the permittee's Stormwater Pollution Prevention Plan(SPPP). Exceedances of benchmark values require the permittee to increase monitoring,increase management actions,increase record keeping,and/or install stormwater Best Management Practices(BM Ps) in a tiered program. See below the descriptions of Tier One,Tier Two, and Tier Three response actions below, In the event that the Division releases the permittee from continued monthly monitoring under Tier Three,DWQ's release letter remains in effect through subsequent reissuance of this permit,unless the release letter provides for other conditions or duration. Part H Page 6 of.12 Permit No.NCG060000 Table 3. Benchmark Values for Analytical Monitoring Discharge Characteristics Benchmark Values pH1 6-9 standard unitsl Total Suspended Solids (TSS) 100 mg/L TSS (ORW,HWQ,Trout&PNA waters) 50 mg/L Oil&Grease 30 nig/L Fecal Coliform 1,000 per 100 ml Enterococci 500 per 100 rnl Chemical Oxygen Demand 120 mg/L Footnotes: 1 If pH values outside this range are recorded in sampled stormwater discharges,but ambient precipitation pH levels are lower,then the lower threshold of this benchmark range is the pH of the precipitation(within instrument accuracy)instead of 6 S.U. Readings from an on-site or local rain gauge(or local precipitation data)must be documented to demonstrate background concentrations were below the benchmark pH range of 6-9. Part 11 Paige 7 of 12 Permit No.NCG060000 Tier One If:The first valid sampling results are above a benchmark value,or outside of the benchmark range,For any parameter at my outfall; Then:The permittee shall: ]. Conduct a stormwater management inspection of the facility within two weeks of receiving sampling results. 2. Identify and evaluate possible causes of the benchmark value exceedance. 3. Identify potential and select the specific:source controls,operational controls,or physical improvements to reduce concentrations of the parameters of concern,and/or to bring concentrations within the benchmark range. 4. Implement the selected actions within two months of the inspection. 5. Record each instance of a Tier One response in the SPPP. Include the date and value of the benchmark exceedence,the inspection date,the personnel conducting the inspection,the selected actions,and the date the selected actions were implemented. Tier Two If:(luring the term of this permit,the first valid sampling results from two consecutive monitoring periods are above the benchmark values,or outside of the benchmark range,for any specific parameter at a specific discharge outfall; Then:The permittee shalt: 1. Repeat all the required actions outlined above in Tier One. 2. Immediately institute monthly monitoring for all parameters. The permittee shall conduct monthly monitoring at every outfall where a sampling result exceeded the benchmark value for two consecutive samples. Monthly[analytical and qualitative]monitoring shall continue until three consecutive sample results are below the benchmark values or within benchmark range. 3. if no discharge occurs during the sampling period,the permittee is required to submit a monthly monitoring report indicating"No Flow"to comply with reporting requirements. 4. Benchmark exceedances for a different parameter separately trigger a tiered response. 5. Maintain a record of the Tier Two response in the SPPP. Tier Three During the term of this permit,if the valid sampling results required for the permit monitoring periods exceed the benchmark value,or are outside the benchmark range,for any specific parameter at any specific outfall on four occasions,the permittee shall notify the DWQ Regional Office Supervisor in writing within 30 days of receipt of the fourth analytical results. DWQ may but is not limited to: ■ require that the permittee revise,increase,or decrease monitoring frequency for some or all parameters; • rescind coverage under the General Permit,and require that the permittee apply for an individual stormwater discharge permit, ■ require the permittee to install structural stormwater controls; • require the permittee to implement other stormwater control measures; • require the permittee to perform upstream and downstream monitoring to characterize impacts on receiving waters;or ■ require thepermit-tee implement site modifications to qualify for a No Exposure Exclusion. Part 11 Page 8 of 12 Permit No.NCG060000 SECTION C: STORMWATER DISCHARGES: ON-SITE VEHICLE AND EQUIPMENT MAINTENANCE MONITORING REQUIREMENTS Facilities that have any vehicle maintenance activity occurring on-site which uses more than 55 gallons of new motor oil and/or hydraulic oil per month when averaged over the calendar year shall perform analytical monitoring as specified below in Table 4. All analytical monitoring slialI be performed during a measureable storm event at all stormwater disclarge outfalls(SDOs) that discharge stormwater runoff front vehicle maintenance areas,and in accordance with the schedule presented in Table 2 [Section B). Sampling is not required outside of the facility's normal operating hours. Table 4. Analytical Monitoring Requirements for On-Site Vehicle Maintenance Discharge Characteristics Units Measurement Sample Sample Fre uen 1 Type2 LocationB H standard semi-annual Grab SDO Non-Polar Oil&Grease/TPH mg/l, semi-annual Grab SDO EPA Method 1664 SGT-HEM Total Suspended Solids rn 1, semi-annual Grab SDO Total Rainfaj14 inches semi-annual Rain gauge New Motor Oil Usage gallonsIM011th semi-annual Estimate - Footnotes: 1 Measurement Frequency: Twice per year during a measureable storm event,until either another permit is issued for this facility or until this permit is revoked or rescinded, See Table 2 for schedule of monitoring periods through the end of this permitting cycle. Z Grab samples shall be collected within the first 30 minutes of discharge. 3 Sample Location: Samples shall be collected at each stormwater discharge outfalI(SDO)that discharges stormwater runoff from area(s)where vehicle maintenance activities occur. 4 For each sampled measureable storm event the total precipitation must be recorded. An on-sire or local rain gauge reading must be recorded. Where isolated sites are unmanned for extended periods of time,a local rain gauge reading may be substituted For an on-site reading. Failure to monitor semi-annually per permit terms may result in the Division requiring monthly monitoring for all parameters For a specified time period,as provided in Part II Section B. Monitoring results shall be compared to the benchmark values in Table S, The benchmark values in Table 5 are not permit limits but should be used as guidelines for the permittee's Stormwa ter Pollution Prevention Plan (SPPP), Exceedances of benchmark values require the permittee to increase monitoring,increase management actions,increase record keeping,and/or install stormwater Best Management Practices(BMPs),as provided in Part I1 Section B. In the eventthat the Division releases the permittee From continued monthly monitoring under Tier Three,DWQ's release letter remains in effect through subsequent reissuance of this permit,unless the release letter provides for other conditions or duration. Part 11 Page 9 of 12 Permit No.NCG060DOO Table 5. Benchmark Values for On-Site Vehicle and E ui ment Maintenance Activities Discharge Characteristics Benchmark Values H 6-9 standard units Non-Polar ail&Grease/TPH 15 mg/L EPA Method 1664 SGT-HEM Total suspended solids 100 ni L TSS ORW,H W,Trout&PNA waters 50 m L SECTION ❑: STORMWATER DISCHARGES:QUALITATIVE MONITORING REQUIREMENTS The purpose of qualitative monitoring is to evaluate the effectiveness of the Stormwater Pollution Prevention Plan(SPPP)and assess new sources of stormwater pollution. Qualitative monitoring of stormwater outfalls must be performed during a measurable storm event. Qualitative monitoring requires a visual inspection of each stormwater outfall regardless of representative outfall status. Qualitative monitoring shall be performed semi-annua[[y as specified in Table 6,and during required analytical monitoring events (unless the permittee is required to perform further qualitative sampling per the Qualitative Monitoring Response,below). Inability to sample because of adverse weather conditions must be documented in the SPPP and recorded on the DMR(see Adverse Weather in Definitions).Only SDOs discharging storinwater associated with industrial activity must be inonitored (See Definitions). In the event an atypical condition is noted at a stormwater discharge outfall,the permittee shall document the suspected cause of the condition and any actions taken in response to the discovery. This documentation will be maintained with the SPPP. Part 11 Page 10 of 12 Permit No.NCG060000 Table 6. Qualitative Monitoring Requirements Discharge Characteristics Frequency) Monitoring Lncation2 Color semi-annual SDO Odor semi-annual SDO Clarity semi-annual SDO Floating Solids semi-annual SDO Suspended Solids semi-annual SDO Foam semi-annual SDO Oil Sheen semi-annual SDO Erosion or deposition at the outfall serni-annual SDO Other obvious indicators of stormwater pollution semi-annual SDO Footnotes: 1 Measurement Frequency: Twice per year during a measureable storm event See Table 2 for schedule of monitoring periods through the end of this permitting cycle. The permittee must continue qualitative monitoring throughout the permit renewal process. 2 Monitoring Location: Qualitative monitoring shall be performed at each storznwater discharge outfall (SDO)regardless of representative outfall status. A minimum of 60 days must separate monitoring dates, unless additional sampling has been instituted as part of o ther an alytical monitoring requirements in this permit. If the permittee's qualitative monitoring indicates that existing stormwater BMPs are ineffective,or that significant stormwater contamination is present,the permittee shall investigate potential causes,evaluate the feasibility of corrective actions,and implement those corrective actions within 60 days,per the Qualitative Monitoring Response,below. A written record of the pertnittee's investigation,evaluation, and response actions shall be kept in the Storznwater Pollution Prevention Plan. Qualitative Monitoring Response Qualitative monitoring is for the purposes of evaluating SPPP effectiveness, assessing new sources of storznwater pollution, and prompting the permittee's response to pollution. If the permittee repeatedly fails to respond effectively to correct problems identified by qualitative monitoring,or if the discharge causes or contributes to a water quality standard violation, ❑WQ may but is not limited to: require that the permittee revise,increase,or decrease monitoring frequency For some or all parameters [analytical or qualitative]; • require the permittee to install structural stormwater controls; require the permittee to implement other storznwater control measures; * require the permittee to perform upstream and downstream monitoring to characterize impacts on receiving waters;or require the permittee implement site modifications to qualify for a No Exposure Exclusion. Part iI Page 11 of 12 Permit No.NCG060000 PART III STANDARD CONDITIONS FOR NPDES STORMWATER GENERAL PERMITS SECTION A: COMPLIANCE AND LIABILITY 1. Compliance Schedule The permittee shall comply with Limitations and Controls specified for stormwater discharges in accordance with the following schedule: Existing Facilities already operating but applying for permit coverage for the first time: The Stormwater Pollution Prevention Plan shall be developed and implemented within 12 months of the effective date of the Certificate of Coverage and updated thereafter on an annual basis. Secondary containment,as specified in Part 1I,Section A,Paragraph 2(b)of this general permit,shall be accomplished within 12 months of the effective date of the issuance of the Certificate of Coverage. New Facilities applying for coverage for the first time: The Stormwater Pollution Prevention Pian shall be developed and implemented prior to the beginning of discharges from the operation of the industrial activity and be updated thereafter on an annual basis. Secondary containment,as specified in Part 1I,Section A,Paragraph 2(b) of this general permit shall be accomplished prior to the beginning of discharges from the operation of the industrial activity. Existing facilities previously permitted and applying for renewal under this General Permit: All requirements,conditions,limitations,and controls contained in this permit(except new SPPP elements in this permit renewal)shall become effective immediately upon issuance of the Certificate of Coverage, New elements of the Stormwater Pollution Prevention Plan for this permit renewal shall be developed and implemented within 6 months of the effective date of this general permit and updated thereafter on an annual has is. Secondary containment,as specified in Part III,Paragraph 2(b)of this general permit shall be accomplished prior to the beginning of discharges from the operation of the industrial activity. 2. Duty to Comuly The permittee must comply with all conditions of this general permit. Any permit noncompliance constitutes a violation of the Clean Water Act(CWA)and is grounds for enforcement action;for permit termination,revocation and reissuance,or modification;or denial of a permit upon renewal application[40 CFR 122.41]. a. The permittee shall comply with standards or prohibitions established tinder section 307(a)of the CWA for toxic pollutants within the time provided in the regulations that establish these standards or prohibitions,even if the general permit has not yet been modified to incorporate the requirement- b. The CWA provides that any person who violates sections]301,302,306,307,308,318 or 405 of the Act,or any permit condition or limitation implementing any such sections in a permit issued under section 402,or any requirement imposed in a pretreatment program approved tinder sections 402(a)(3)or 402(b)(B)of the Act,is subject to a civil penalty not to exceed$37,500 per day for each violation.[33 USC 1319(d)and 40 CFR 122.41(a)(2)] c. The CWA provides that any person who negligently violates sections 301,302,306,307,308, 318,or 405 of the Act,or any condition or limitation implementing any of such sections in a permit issued under section 402 of the Act,or any requirement imposed in a pretreatment program approved under section 402(a)(3) or 402(b)(8)of the Act,is subject to criminal penalties of$2,500 to$25,000 per day of violation,or imprisonment of not more than 1 year,or bath.In the case of a second or subsequent conviction far a negligent violation,a person shall be Part Ill Page 1 of 10 Permit No.NCG060000 SECTION E: ASSESSMENT OF BEST MANAGEMENT PRACTICES (BMPS) For facilities that use or process animal fats/byproducts:Within twelve (12)months of the issuance of coverage under this General Permit,the permittee shall complete an assessment of best management practices associated with off loading,handling and spill prevention of rendered fats and oils that are stored and used at the facility.Following the completion of this assessment,the permittee shall submit a report of findings and proposed corrective measures to be taken to both the local DWQ Regional Office and Stormwater Permitting Unit. DWQ will review the report,and either approve the proposed corrective action measures plan,direct changes be made to it,or possibly requite further assessment of best management practices. Failure to submit this report is a violation of permit conditions. The assessment report shall include,but not be limited to,the following: 1. A narrative description of all the material handling activities (not just fats and oils handling) that are outside,or that otherwise expose materials to incidental rainfall or run-on. 2. A feasibility evaluation as to whether reduced exposure can be achieved at the site,and rank the potential management measures as to feasibility. Emphasize the evaluation of on-site conditions with respect to incidental,accidental,fugitive materials,and spills,whether solid or liquid. 3. An evaluation of the presence,and vol urne of,❑r absence of animals/wildlife on-site and whether fecal coli form concentrations might be correlated to the presence or absence of those animals wildlife. 4. A proposed corrective action measures plan with milestones and proposed schedule for implementation, Part II Page 12 of 12 Permit No.NCG060000 subject to criminal penalties of not more than$50,000 per day of violation,or by imprisonment of not mare than 2 years,or both. [33 USC 1319(c)(1)and 40 CFR 122.41(a)(2)] d. Any person who knowingly violates such sections,or such conditions or limitations is subject to criminal penalties of$5,000 to$50,000 per day of violation,or imprisonment for not more than 3 years,or both.In the case of a second or subsequent conviction for a knowing violation,a person shall.be subject to criminal penalties of not more than$100,000 per day of violation,or imprisonment of not more than 6 years,or both.[33 USC 1319(c)(2)and 40 CFR 12 2.41(a)(2)] e. Any person who knowingly violates section 301,302,303,306,307,308,318 or 405 of the Act, or any permit condition or limitation implementing any of such sections in a permit issued under section 402 of the Act,and who knows at that time that he thereby places another person in imminent danger of death or serious bodily injury,shall,upon conviction,be subject to a fine of not more than$250,000 or imprisonment of not more than 15 years,or both.In the case of a second or subsequent conviction for a knowing endangerment violation,a person shall be subject to a fine of not more than$500,000 or by imprisonment of not more than 30 years,or both.An organization,as defined in section 3 09(c)(3)(B)(iii) of the CWA,shall,upon conviction of violating the imminent danger provision,be subject to a fine of not more than$1,000,000 and can be Fined up to$2,000,000 for second or subsequent convictions.f 40 CFR 122.41(a)(2)] f. Under state law,a civil penalty of not more than$25,000 per violation may be assessed against any person who violates or fails to act in accordance with the terms,conditions,or requirements of a permit.[North Carolina General Statutes§ 143-215,6A] S. Any person may be assessed an administrative penalty by the Administrator for violating section 301,302,306,307,308,318 or 405 of this Act,or any permit condition or limitation implementing any of such sections in a permit issued under section 402 of this Act_ Administrative penalties for Class I violations are not to exceed$16,000 per violation,with the maximum amount of any Class I penalty assessed not to exceed$37,500.Penalties for Class II violations are not to exceed$16,000 per day for each day during which the violation continues, with the maximum amount of any Class I penalty not to exceed$177,500.[33 USC 1319(g)(2) and 40 CFR 122.41(a)(3)] 3. Dury to Mitigate The permittee shall take all reasonable steps to minimize or prevent any discharge in violation of this general permit which has a reasonable likelihood of adversely affecting human health or the environment[40 CFR 122.41(d)], 4, Civil and Criminal Liability Except as provided in Part III,Section C of this general permit regarding bypassing of stormwater control Facilities,nothing in this permit shall be construed to relieve the permittee from any responsibilities,liabilities,or penalties for noncompliance pursuant to NCGS 143-215.3,143-215.6,or Section 309 of the Federal Act,33 USC 1319. Furthermore,the permittee is responsible for consequential damages,such as fish kills,even though the responsibility for effective compiiance may be temporarily suspended. S. Oil_and Hazardous Substance Liability Nothing in this general permit shall be construed to preclude the institution of any legal action or relieve the permittee from any responsibilities,liabilities,or penalties to which the permittee is or may be subject to under NCGS 143-215.75 et seq,or Section 311 of the Federal Act,33 USC 1321, 6. Property Rights The issuance of this general permit does not convey any property rights in either real or personal property,or any exclusive privileges,nor does it authorize any injury to private property or any Part III Page 2 of 7 0 Permit No.NCG060000 invasion of personal rights,nor any infringement of Federal,State or local laws or regulations[40 CFR 1Z2.41(g)]. 7. Severability The provisions of this general permit are severable,and if any provision of this general permit,or the application ofany provision of this general permit to any circumstances,is held invalid,the application of such provision to other circumstances,and the remainder of this general permit,shall not be affected thereby[NCGS 15013-231. 8. Duty to Provide Information The permittee shall furnish to the Permit Issuing Authority,within a reasonable time,any information which the Permit Issuing Authority may request to determine whether cause exists For modifying,revolting and reissuing,a terminating the general permit issued pursuant to this general permit or to determine compliance with this general permit. The permittee shall also Furnish to the Permit Issuing Authority up❑n request,copies of records required to be kept by this general permit [40 CFR 122.41(h)]. 9. Penalties For Tampering The Clean Water Act provides that any person who falsifies,tampers with,or knowingly renders inaccurate,any monitoring device or method required to be maintained under this general permit shall,upon conviction,be punished by a fine of not more than$10,000 per violation,or by imprisonment for not more than two years per violation,or by bath. If a conviction of a person is For a violation committed after a first conviction of such person under this paragraph,punishment is a Fine of not more than$20,000 per day of violations,or by imprisonment of not more than 4 years,or both[40 CFR 122.41]. 10. Penalties for Falsification of Reports The Clean Water Act provides that any person who knowingly makes any false statement, representation,a certification in any record or other document submitted or required to be maintained under this general permit,including monitoring reports or reports of compliance or nonconipiiance shall,upon conviction,be punished by a fine of not more than$10,000 per violation, or by imprisonment for not mare than tw❑years per violation,a by bath[40 CFR 122.41]. 11. Onshore or Offshore Construction This general permit does not authorize or approve the construction of any onshore or offshore physical structures or facilities or the undertaking of any work in any navigable waters. 12. Duty to Reapply Dischargers covered by this genera!permit need nor submit a new Notice of Intent(NO I) or renewal request unless so directed by the Division. If the Division chooses not to renew this general permit, the permittee will be notified to submit an application for an individual permit[I SA NCAC 02H .0127[e]], SECTION B. GENERAL CONDITIONS 1. General Permit Expiration General permits will be effective for a term not to exceed five years,at the end of which the Division may renew them after all public notice requirements have been satisfied. If a general permit is renewed,existing perntittees do not need to submit a renewal request or pay a renewal fee unless directed by the Division. New applicants seeking coverage under a renewed general permit must submit a Notice of Intent to be covered and obtain a Certificate of Coverage under the renewed general permit[15A NCAC 02H.0127(e)]. Part 11I Page 3 of 10 Permit No.NCG060000 2. Transfers This general permit is not transferable to any person without prior written notice to and approval From the Director in accordance with 40 CFR 122.61.The Director may condition approval in accordance with NCGS 143.21S.1,in particular NCG5143-21S.1(b)(4)b.2„and may require modification or revocation and reissirance of the Certificate of Coverage,or a minor modification,to identify the new permittee and incorporate such other requirements as may be necessary under the CWA(40 CFR 122.41(1)(3),122.61]or state statute. The Permittee is required to notify the Division in writing in the event the permitted facility is sold or closed. 3. When an I ndividual Permit M ay be Re uire The Director may require any owner operator authorized to discharge under a certificate of coverage issued pursuant to this general permit to apply for and obtain an individual permit or an alternative general permit. Any interested person may petition the Director to take action under this paragraph. Cases where an individual permit may be required include,but are not limited to,the following-. a. The discharger is a significant contributor of pollutants; b. Conditions at the permitted site change,altering the constituents and/or characteristics of the discharge such that the discharge no longer qualifies for a general permit; C. The discharge violates the terms or conditions of this general permit; d. A change has occurred in the availability of demonstrated technology or practices for the control or abatement of pollutants applicable to the point source; e. Effluent limitations are promulgated For the point sources covered by this general permit; f. A water quality management plan containing requirements applicable to such point sources is approved after the issuance of this general permit; g. The Director determines at his or her own discretion that an individual permit is required. 4. When an Individual Permit Maybe Rq uested Any permittee operating under this general permit may request to be excluded from the coverage of this general permit by applying for an individual permit. When an individual permit is issued to an owner/operator the applicability of this general permit is automatically terminated on the effective date of the individual permit. S. Signatory Requirements All applications,reports,or iinformation submitted to the Permitting Issuing Authority shall be signed and certified[40 CFR 122.41[k]]. a. All Notices of Intent to be covered tinder this general permit shall be signed as follows: (1) For a corporation: by a responsible corporate officer.For the purpose of this Section,a responsible corporate officer means: (a) a president,secretary,treasurer or vice president of the corporation in charge of a principal business function,or any other person who performs similar policy or decision making functions for the corporation,or(b)the manager of one or more manufacturing,production,or operating facilities,provided,the manager is authorized to make management decisions which govern the operation of the regulated facility including having the explicit or implicit duty of making major capital investment recommendations,and initiating and directing other comprehensive measures to assure long term environmental compliance with environmental laws and regulations;the manager can ensure that the necessary systems are established or actions taken to gather complete and accurate information for permit application requirements;and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures. Part ill Page 4 of 10 Permit No.NCG060000 (2) For a partnership or sole proprietorship. by a general partner or the proprietor, respectively;or (3) For a municipality,State,Federal,or other public agency: by either a principal executive officer or ranking elected official 140 CFR 122.22]. b. All reports required by the general permit and other information requested by the Permit Issuing Authority shall be signed by a person described in paragraph a.above or by a duly authorized representative of that person.A person is a duly authorized representative only if: (1) The authorization is made in writing by a person described above; (2) The authorization specified either an individual or a position having responsibility for the overall operation of the regulated facility or activity,such as the position of plant manager, operator of a well or well field,superintendent,a position of equivalent responsibility,or an individual or position having overall responsibility for environmental matters for the company. (A duly authorized representative may thus be either a named individual or any individual occupying a named position.);and (3) The written authorization is submitted to the Permit Issuing Authority[40 CFR 122.22] c. Changes to authorization:If an authorization under paragraph(b)of this section is no longer accurate because a different individual or position has responsibility for the overall operation of the facility,a new authorization satisfying the requirements of paragraph(b)of this section must be submitted to the Director prior to or together with any reports,information,or applications to be signed by an authorized representative[40 CFR 122.221 d. Certification.Any person signing a document under paragraphs a.or b.of this section shall make rile following certification[40 CFR 122.22].NO OTHER STATEMENTS OF CERTIFICATION WILL BE ACCEPTED: 7 certify,under penalty of law,that this document and all attachments were prepared under my direction or•supervision in accordance with a system designed to assure thatqualifedpersonnel properlygather and evaluate the information submitted.Based on my inquiry of the person or persons who manage the system,or those persons directly responsible forgathering the information,the information submitted is,to the best of rrry knowledge and belief,true,accurate, crud complete.1 am aware that there are significant penalties for submitting false information, includiiW the possibility of fines and im p riso n rn e n t far•knowing violations." 6. General Permit Modification,Revocation and Reigg.Uiice.or Termination Tile issuance of this general permit does not prohibit the Permit Issuing Authority from reopening and modifying the general permit,revoking and reissuing the general permit,or terminating the general permit as allowed by the laws,roles,and regulations contained in Title 40,Code of Federal Regulations,Parts 122 and 123;Title 15A of the North Carolina Administrative Code,Subchapter 214 .0100;and North Carolina General Statute 143-215.1 et al. After public notice and opportunity for a hearing,the general permit may be terminated For cause. The filing of a request for a general permit modification,revocation and reissuance,or termination does not stay any general permit condition. The Certificate of Coverage shall expire when the general permit is terminated. 7. Certificate of Coverage Actions The general permit may be modified,revoked and reissued,or terminated for cause. The notification of planned changes or anticipated noncompliance does not stay any general permit condition[40 CFR 122.41(% Part Ill Page 5 of 10 Permit No,NCGO60000 S. Annual Ad minisLeringand CornI21 iance Monitorin Fee Requi remen The permittee must pay the administering and compliance monitoring fee within 30(thirty)days after being billed by the Division. Failure to pay the fee in timely manner in accordance with 15A NCAC 2H.0105(b)(2)may cause this Division to initiate action to revoke coverage under the general permit. SECTION C: OPERATION AND MAINTENANCE OF POLLUTION CONTROLS 3 Proper Operation and Maintenance The permittee shall at all times properly operate and maintain all facilities and systems of treatment and control(and related appurtenances)which are installed or used by the permittee to achieve compliance with the conditions of this permit, Proper operation and maintenance also includes adequate laboratory controls and appropriate quality assurance procedures. This provision requires the operation of back-up or auxiliary facilities or similar systems which are installed by a permittee only when the operation is necessary to achieve compliance with the conditions of this permit[40 CFR 122.41(e)]. 2. Need to Halt or Reduce Not a Defense It shall not be a defense for a permittee in an enforcement action that it would have been necessary to hat or reduce the permitted activity in order to maintain compliance with the condition of this general permit[40 CFR 122.41(c)]. 3, Bypassing of Stor t rol Facilities Bypass is prohibited and the Director may take enforcement action against a permittee for bypass unless: a. Bypass was unavoidable to prevent loss of life,personal injury or severe property damage;and b. There were no feasible alternatives to the bypass,such as the use of auxiliary control facilities, retention of stormwater or maintenance during normal periods of equipment downtime or dry weather. This condition is not satisfied if adequate backup controls should have been installed in the exercise of reasonable engineering judgment to prevent a bypass which occurred during normal periods of equipment downtime or preventive maintenance;and c. The permittee submitted notices as required under,Part Ili,Section E of this general permit. If the Director determines that it will meet the three conditions listed above,the Director may approve an anticipated bypass after considering its adverse effects. SECTION D: MONITORING AND RECORDS 1. Representative Sampling Samples collected and measurements taken,as required herein,shall be characteristic of the volume and nature of the permitted discharge, Analytical sampling shall be performed during a measureable storm event. Samples shall be taken on a day and time that is characteristic of the discharge. All samples shall be taken before the discharge joins or is diluted by any other waste stream,body of water,or substance. Monitoring points as specified in this general permit shall not be changed without notification to and approval of the Permit Issuing Authority[40 CFR 122.41(i)]. 2. Recording Results For each measurement or sample taken pursuant to the requirements of this general permit,the permittee shall record the following information[40 CFR 122.41]: a. The date,exact place,and time of sampling or measurements; Part 111 Page 6 of 1❑ Permit No.NCG060000 b. The individual(s)who performed the sampling or measurements; c. The date(s)analyses were performed; d. The individual(s)who performed the analyses; e. The analytical techniques or methods used;and f. The results of such analyses. 3. Flow Measurements Where required,appropriate flow measurement devices and methods consistent with accepted scientific practices shall be selected and used to ensure the accuracy And reliability of measurements of the volume of monitored discharges. 4. Test Procedures Test procedures for the analysis of pollutants shall conform to the EMC regulations published pursuant to NCGS 143.215.63 et.seq,the Water and Air Quality Reporting Acts,and to regulations published pursuant to Section 304(g),33 USC 1314,of the Federal Water Pollution Control Act,as Amended,and Regulation 40 CFR 136. To meet the intent of the monitoring required by this general permit,all test procedures must produce minimum detection and reporting Ievels and all data generated must be reported down to the minimum detection or lower reporting level of the procedure. If no approved methods are determined capable of achieving minimum detection and reporting levels below general permit discharge requirements,then the most sensitive(method with the lowest possible detection and reporting level)approved method must be used. 5. Representative Dutfall If a facility has multiple discharge locations with substantially identical stormwater discharges that are required to be sampled,the permittee may petition the Director for representative ouutfalI status. If it is established that the stormwater discharges are substantially identical and the permittee is granted representative outfall status,then sampling requirements may be performed at a reduced number of outfalls. 6. Records Retention Qualitative monitoring shall be documented and records maintained at the facility along with the Stormwater Pollution Prevention Plan(SPPP). Copies of analytical monitoring results shall also be maintained on-site. The permittee shall retain records of all monitoring information,including ❑ all calibration and maintenance records, o all original strip chart recordings for continuous monitoring instrumentation, o copies of all reports required by this general permit, o copies of all data used to complete the Notice of Intent to be covered by this general permit. These records or copies shall be maintained for a period of at least 5 years from the date of the sample,measurement,report or Notice of Intent application. This period may be extended by request of the Director at anytime[40 CFR 122.41]. if this volume of records cannot be maintained on-site,the documents must be made available to an inspector upon request as immediately as possible. 7. Inspection arid-Entry The permittee shall allow the Director,or an authorized representative(including an authorized contractor acting as a representative of the Director),or in the case of a facility which discharges through a municipal separate storm sewer system,an authorized representative of a municipal operator or the separate storm sewer system receiving the discharge,upon the presentation of credentials and other documents as may be required by law,to: Part ill Page 7 of 10 Permit No.NCG060000 a. Enter upon the permittee's premises where a regulated facility or activity is located or conducted, or where records must be kept under the conditions of this general permit; b. Have access to and copy,at reasonable times,any records that must be kept under the conditions of this general permit; C. Inspect at reasonable times any facilities,equipment(including monitoring and control equipment),practices,or operations regulated or required under this general permit;and d. Sample or inonitor at reasonable times,for the purposes of ass"ring permit compliance or as otherwise authorized by the Clean Water Act,any substances or parameters at any location [40 CFR 122.41(i)]. SECTION E: REPORTING REQUIREMENTS 1. Disclarg4_Monitoring Reports Samples analyzed in accordance with the terms of this general permit shall be submitted to the Division on Discharge Monitoring Report(DMR)forms provided by the Director. DMR forms are available on the Division's website(h"p://partal.iicdenr,Qrglweblwq/ws/su/npdessw). Submittals shall be delivered to the Division no later than 30 clays from the date the facility receives the sampling results from the laboratory. When no discharge has occurred from the facility during the report period,the permittee is required to submit a discharge monitoring report,within 30 days of the end of the specified sampling period, giving all required information and indicating"NO FLOW"as per NCAC T15A 0 2 B.0506. If the permittee monitors any pollutant more frequently than required by this general permit using test procedures approved under 40 CFR Part 136 and at a sampling location specified in this general permit or other appropriate instrument governing the discharge,the results of such monitoring shall be included in the data submitted on the DMR. The permittee shall record the required qualitative monitoring observations on the SDO Qualitative Monitoring Report form provided by the Division and shall retain the completed forms on site. Qualitative monitoring results should not be submitted to the Division,except upon DWQ's specific requirement to do so. Qualitative Monitoring Report Forms are available at the website above. 2. Submitting Reports a, Two signed copies of Discharge Monitoring Reports(DMRs)small be submitted to: Central Files Division of Water Quality 1617 Mail Service Center Raleigh,North Carolina 27699.1617 b. One copy of the Best Management Practices Assessment Report(refer to Part II.,Section E.)shall be submitted to each the local DWQ Regional Office(RO)and the 5tormwater Permitting Unit (SPU). Addresses for each RO and the counties covered by each RO can be found Isere http:J/Ija rtaLnj:denr.org/web Jwq/homefto. The address for the 5PU is shown below. The permittee shall retain a copy of the report on site. 5tormwater Permitting Unit Division of Water Quality 1617 Mail Service Center Raleigh,North Carolina 27699-1617 Part ill Page 8 of 10 Permit No.NCG060000 3. Availability of Reports Except for data determined to be confidential under NCGS 143-215.3(a)(2)or Section 308 of the Federal Act,33 USC 1318,all reports prepared in accordance with the terms shall be available for public inspection at the offices of the Division. As required by the Act,analytical data shall not be considered confidential. Knowingly making any false statement on any such report may result in the imposition of criminal penalties as provided for in NCGS 143-215.5H or in Section 309 of the Federal Act. 4. Non-Stormwater Discharges If the storm event monitored in accordance with this general permit coincides with a non- stormwater discharge,the permittee shall separately monitor all parameters as required under all other applicable discharge permits and provide this information with the stormwater discharge monitoring report. 5, Planned Changes The permittee shall give notice to the Directoras soon as possible of any planned changes at the permitted facility which could significantly alter the nature or quantity of pollutants discharged[40 CFR 122.41(1)]. This notification requirement includes pollutants which are not specifically listed in the general permit or subject to notification requirements under 40 CFR Part 122.42 (a). 6. Anticinated Noncompliance The permittee shall give advance notice to the Director of any planned changes at the permitted facility which may result in noncompliance with the general permit[40 CFR 122.41(1)(2)]. 7. Snil—Is The permittee shall report to the local DWQ Regional Office,within 24 hours,all significant spills as defined in Part I of this general permit. Additionally,the permittee shall report spills including: any oil spill of 25 gallons or more,any spill regardless of amount that causes a sheen on surface waters, any oil spill regardless of amount occurring within 100 feet of surface waters,and any oil spill Iess than 25 gallons that cannot be cleaned tip within 24 hours. S. Bypass Notice [40 CFR 122.41(m)(3)]: a. Anticipated bypass. If the permittee knows in advance of the need for a bypass,it shall submit prior notice,if possible at least ten days before the date of the bypass; including an evaluation of the anticipated quality and affect of the bypass. b. Unanticipated bypass. The permittee shall submit notice within 24 hours of becoming aware of an unanticipated bypass. 9, Twenh+-four HotiLggpQrting a. The permittee shall report to the central office or the appropriate regional office any noncompliance which may endanger health or the environment. Any information shall be provided orally within 24 hours from the time the permittee became aware of the circumstances. A written submission shall also be provided within 5 days of the time the permittee becomes aware of the circumstances. The written submission shall contain a description of the noncompliance,and its causes;the period of noncompliance,including exact dates and times,and if the noncompliance has not been corrected,the anticipated time compliance is expected to continue;and steps taken or planned to reduce,eliminate,and prevent reoccurrence of the noncompliance [40 CFR 12 Z.41(1)(6)]. b. The Director may waive the written report on a case-by-case basis for reports under this section if the oral report has been received within 24 hours. Part ill Page 9 of 10 Permit No.NCG060000 c. Occurrences outside normal business hours may also be reported to the Division's Emergency Response personnel at(800)662-7956,(800)858-0368 or(919) 733.3300. 10. Other Noncompliance The permittee shall report all instances of noncompliance not reported under 24 hour reporting at the time monitoring reports are submitted[40 CFR 122.41(1)(7)). 11. Other Information Where the Permittee becomes aware that it failed to submit any relevant Facts in a Notice of Intent to be covered under this general permit,or submitted incorrect information in that Notice of Intent application or in any report to the Director,it shall promptly submit such Facts or information(40 CFR 122.41(1)(6)j. Part Ill Page 10 of 10 Permit No.NCG060000 PART IV ❑EFINITIONS 1. Act See Clean Water Act. 2. Adverse Weather Adverse conditions are those that are dangerous or create inaccessibility for personnel,such as local Flooding,high winds,or electrical storms,or situations that otherwise make sampling impractical. When adverse weather conditions prevent the collection of samples during the sample period,the permit-tee must take a substitute sample or perform a visual assessment during the next qualifying storm event.Documentation of an adverse event[with date,time and written narrative]and the rationale must be included with your SPPP records. Adverse weather does not exempt the permittee from having to file a monitoring report in accordance with the sampling schedule.Adverse events and failures to monitor must also be explained and reported on the relevant DMR. 3. Allowable Non-StormwaterDischarges This general permit regulates stormwater discharges. Non-stormwater discharges which shall be allowed in the stormwater conveyance system are: a, All other discharges that are authorized by a non-stormwater NPDES permit. b. Uncontaminated groundwater,foundation drains,air-conditioner condensate without added chemicals,springs,discharges of uncontaminated potable water,waterline and fire hydrant flusItings,water from footing drains,irrigation waters,flows fro in riparian habitats and wetlands. c. Discharges resulting from fire-fighting or fire-fighting training,or emergency shower or eye wash as a result of use in the event of an emergency. 4. Best Managenignt Practices[BMPs] Measures or practices used to reduce the amount of pollution entering surface waters. BMPs may take the Form of a process,activity,or physical structure. More information on BMPs can be found at: Imp:llcfpub.epa.gavtnnrles f stormwater/nienuofbmpl4i dex.cfm. 5. Bypass A bypass is the known diversion of stormwater from any portion of a stormwater control facility including the collection system,which is not a designed or established operating mode for the facility. 6. Bulk Storage of Liquid Products Liquid raw materials,manufactured products,waste materials or by-products with a single above ground storage container having a capacity of greater than 660 gallons or with multiple above ground storage containers located in close proximity to each other having a total combined storage capacity of greater than 1,320 gallons. 7. Certificate of Coveragg The Certificate of Coverage[COC]is the cover sheet which accompanies a general permit upon issuance and lists the facility name,location,receiving stream,river basin,effective date of coverage under the general permit and is signed by the Director. 8. Clean Water Act The Federal Water Pollution Control Act,also known as the Clean Water Act[CWA],as amended,33 USC 1251,at.seq. 9. Division or DWQ The Division of Water Quality,Department of Enviro nment and Natural Resources. Part[V Page 1 of 4 Permit No.NCG060000 10. director The Director of the Division of Water Quality,the permit issuing authority. 11. EMC The North Carolina Environmental Management Commission. 12. Grab Sample An individual sample collected instantaneously. Grab samples that will be analyzed(quantitatively or qualitatively)must be taken within the first 30 minutes of discharge. 13. HazardOLIS Snbstance Any substance designated under 40 CFR Part 116 pursuant to Section 311 of the Clean Water Act. 14. Landfill A disposal facility or part of a disposal facility where waste is placed in or on land and which is not a land treatment facility,a surface impoundment,an injection well,a hazardous waste long-term storage facility or a surface storage facility. 15. sureable 5torm Event A storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event most have been at least 72 hours prior. The 72-hour storm interval may not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period,and obtains approval from the local DWQ Regional Office. Two copies of this information and a written request letter shall be sent to the local DWQ Regional Office, After authorization by the DWQ,Regional Office,a written approval letter must be kept on site in the permittee's SPPP. 1& M tin ici pal Separate Storm Sewer System MS4 A stormwater collection system within an incorporated area of local self-government such as a city or town. 17. No Exposure A condition of no exposure means that all industrial materials and activities are protected by a storm resistant shelter or acceptable storage containers to prevent exposure to rain,snow,snowmelt,or runof€. Industrial materials or activities include,but are not limited to,material handling equipment or activities,industrial machinery,raw materials,intermediate products,by-products,final products, or waste products. DWQ may grant a No Exposure Exclusion from NPDES stormwater permitting requirements only if a facility complies with the terms and conditions described in 40 C1=R §122.26(g). 18. Notice of Intent The state application form which,when submitted to the Division,officially indicates the Facility's notice of intent to seek coverage under a general permit. 19, Permit Issuing Authority The Director of the Division of Water Quality(see"Director"above). 20. Permittee The owner or operator issued a Certificate of Coverage pursuant to this general permit. 21. Point Source Discharge of Stormwater Any discernible,confined and discrete conveyance including,but not specifically limited to,any pipe, ditch,channel,tunnel,conduit,well,or discrete fissure Fro in which stormwater 1s or may be discharged to waters of the state. Part IV Page 2 of 4 Permit No.NCG060000 ZZ, Representative OUtfall Status When it is established that the discharge of stormwater runoff from a single outfall is representative of the discharges at multiple outfa[[%the❑WQ may grant representative outfall status. Representative outfall status allows the permittee to perform analytical monitoring at a reduced number of outfalls. 23. SerQndary Containment Spill containment for the contents of the single largest tank within the containment structure plus sufficient freeboard to allow for the 25-yea r,24-hour storm event. 24. Section 313 Water Pt'iarity Chemical A chemical or chemical category which: b, Is listed in 40 CFR 372.65 pursuant to Section 313 of Title Ili of the 5uperfund Amendments and Reauthorization Act(SARA)of 1986,also titled the Emergency Planning and Community Right- to-Know Act of 1986; c. Is present at or above threshold levels at a facility subject to SARA title 111,Section 313 reporting requirements;and d, Meets at least one of the following criteria: i. Is listed in appendix D of 40 CFR part 122 on Table 11 (organic priority pollutants),Table H[ (certain metals,cyanides,and phenols)or Table IV(certain toxic pollutants and hazardous substances); ii. Is listed as a hazardous substance pursuant to section 311(b)(2)(A)of the CWA at 40 CFR 116.4;or iii. Is a pollutant forwhich EPA has published acute or chronic water quality criteria. 25. Severe Property_ a e Substantial physical damage to property,damage to the control facilities which causes them to become inoperable,or substantial and permanent loss of natural resources which can reasonably be expected to occur in the absence of a bypass. Severe property damage does not mean economic loss caused by delays in production. Z6, Significant Materials Includes,but is not limited to:raw materials;fuels;materials such as solvents,detergents,and plastic pellets;finished materials such as metallic products;raw materials used in Food processing or production;hazardous substances designated under section 101(14)of CERCLA;any chemical the Facility is required to report pursuant to section 313 of Title III of SARA;fertilizers;pesticides;and waste products such as ashes,slag and sludge that have the potential to be released with stormwater discharges. Z7. Sia_nificant Spills Includes,but is not limited to: releases of oil or hazardous substances in excess of reportable quantities under section 311 of the Clean Water Act(Ref:44 CFR 110.3and 40 CFR 117.3) or section 102 of CERCLA(Ref:40 CFR 30ZA). Z$, stormwater Db5charge❑utfall SD The point ofdeparture of stormwater from a discernible,confined,or discrete conveyance,including but not limited to,storm sewer pipes,drainage ditches,channels,spillways,or channe[ized collection areas,from which storm water flows directly or indirectly into waters of the State of North Carolina. 29. Stormwater Runoff The flaw of water which results from precipitation and which occurs immediately following rainfall or as a result of snowmelt. Part iV Page 3 of 4 Permit No.NCG060000 30. Storruwater Associated withIndustrial ActivLty The discharge from any paint source which is used For collecting and conveying stormwater and which is directly related to manufacturing,processing or raw material storage areas at an industrial site. Facilities considered to be engaged in"industrial activities"include those activities defined in 40 CFR 122.26(b)(14). The term does not include discharges from facilities or activities excluded from the NPDES program. 3L 5tormwater Pollution Prevention Plan[SPPP] A comprehensive site-specific plan which details measures and practices to reduce stormwater pol[ittion and is based on an evaluation of the pollution potential of the site. 32. Total Maximum Daily Load TMD TMDLs are written plans for attaining and maintaining water quality standards,in all seasons,for a specific water body and pollutant. A list of approved TM DLs far the state of Narth Carolina can be found at http:/portalxxdenr.org/web jwc/ps/mtu/tmd1. 33. Toxic Pollutant Any pollutant listed as toxic under Section 307(a)(1)of the Clean Water Act. 34. Vehicle Maintenance Activity Vehicle rehabilitation,mechanical repairs,painting,fueling,ILibrication,vehicle cleaning operations, or airport deicing operations. 35, Visible Sedimentation Solid particulate matter,both mineral and organic,that has been or is being transported by water, air,gravity,or ice from its site of origin which can be seen with the unaided eye. 36. 23-ygar_24 hour Storm Event The maximum 24-hour precipitation event expected to be equaled or exceeded,on the average,once in 25 years. Part 1V Page 4 of 4 E i s E 4