HomeMy WebLinkAboutNCC223691_MODIFICATION Supporting Doc LOTS 1 180-181_20231222 ROY COOPER
Governor
ELIZABETH S.BISER `
Secretary ,
BRIAN WR.ENN NORTH CAROLINA
Director' Environmental Quality
August 26, 2022
.
LETTER OF APPROVAL
NVR,Inc.
Joe Schmidtke,Vice President
5734 Trinity Road, Suite 200
Raleigh,NC 27607
RE: Project Name: Coble Farms Lot 1
Acres Approved: 0.18
Project ID: HARNE-2023-019
County: Harnett, City: Angier
Address: SR 1415
River Basin: Cape Fear
Stream Classification: Other
Submitted by: Jamie Guerrero
Date Received by LQS: August 16,2022
Plan Type: Residential
Dear Mr. Schmidtke:
The subject erosion and sedimentation control plan has been approved by default. The
. Sedimentation Pollution Control Act (hereinafter"Act") states that this plan must be filed a
minimum of 30 days(15 days for revised plans)prior to the activity and the approving authority
must approve or disapprove the submitted plan within 30 days (15 days for revised plans) of
receipt of G.S. 113A-54.1.The Act further states that if the approving authority fails to approve
or disapprove the submitted plan within the 30-day(15 days for revised plans)period,the plan
will be deemed approved.The enclosed Certificate of Approval must be posted at the job site.
This plan approval shall expire three (3) years following the date of approval, if no land-
disturbing activity has been undertaken,as is required by Title 15A NCAC 4B .0129.
As of April 1,2019,all new construction activities are required to complete and submit
an electronic Notice of Intent(NOI)form requesting a Certificate of Coverage (COC)
under the NCG010000 Construction Stormwater General Permit. This form MUST be
submitted and COC issued prior to the commencement of any land disturbing activity on
the above-named project.The NOI form may be accessed at deq.nc.gov/NCG01.Please
direct questions about the NOI form to Annette Lucas at Annette.iucas(a ncdenr.gov or
Paul Clark at Paul.clark@ncdenr.gov.ncdenr.gov.After you submit a complete and correct NOI
Form,a COC will be emailed to you within three business days. Initially,DEMLR will
not charge a fee for coverage under the NCGO1 permit. However,on or after June 1,
North Carolina Department of Em ironmental Quality i 01 ision of Ea�ergy,M19inerai and Land Resources
y
Fayetteville Regional Office E 22:3 Green Street.Suite 714 i 1 yetfes iile,North Carollni 28i]t
o ;L;`,iafu mmna, uli .._..: 910.4333300
2019, a$100 fee will be charged annually.This fee is to be sent to the DEMLR
Stormwater Central Office staff in Raleigh. Title 15A NCAC 4B .0118(a)and the
NCGO1 permit require that the following documentation be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
Also,this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic
inspection to insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented,requiring
protection of existing natural resources and adjoining properties. If, following the
commencement of this project,the erosion and sedimentation control plan is inadequate
to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North
Carolina General Statute 113A-51 through 66),this office may require revisions to the
plan and implementation of the revisions to insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal
and State water quality laws,regulations, and rules.In addition, local city or county
ordinances or rules may also apply to this land-disturbing activity. This approval does
not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the
information provided in the Financial Responsibility Form,which you provided. You
are requested to file an amended form if there is any change in the information
included on the form. This permit allows for a land-disturbance, as called for on the
application plan,not to exceed the approved acres. Exceeding the acreage will be a
violation of this permit and would require a revised plan and additional application
fee. Any addition in impervious surface,over that already noted on the approved
plan,would also require a revised plan to verify the appropriateness of the erosion
control measures and the stormwater retention measures. (GS 113A-54.1(b)). In
addition, it would be helpful if you notify this office of the proposed starting date for
this project. Please notify us if you plan to have a preconstruction conference.
Your cooperation is appreciated.
Sincerely,
CAA:40 gk".6%-
Chris Baker
Assistant Regional Engineer
DEMLR- Fayetteville Regional Office
Enclosures: Certificate of Approval
cc: Jamie Guerrero,P.W.,Morris&Ritchie Associates of NC,P. C.—email copy
Landon Chandler,Harnett County Inspections Office—email copy
Fayetteville Regional Office
fits.STATE t-i,
ROY COOPER N,
Governor "�
MICHAEL:S.BEGAN' w -.0%.p.
Secintary
BRIAN WRENN NORTH CAROLINA
Direcror Environmental Quality
March 19, 2021
LETTER OF APPROVAL WITH MODIFICATIONS
NRV,Inc.
Brad Messenger,Vice President
5734 Trinity Road, Suite 200
Raleigh,NC 27607
RE: Project Name: Coble Farms Lots 2, 180, 181, 189, 190
Acres Approved: 0.85
Project ID: HARNE-2021-098
County: Harnett, City: Angier
Address: SR 1415
River Basin: Cape Fear
Stream Classification: Other •
Submitted by: Jamie Guerrero
Date Received by LQS: February 22, 2021
Plan Type: Residential
Dear Mr. Messenger:
This office has reviewed the subject erosion and sedimentation control plan. We find the
plan to be acceptable and herebyissue this Letter of Approval. The enclosed Certificate of
Approval must be posted at the job site.This plan shall expire three(3)years following the
date of approval, if no land disturbing activity has been undertaken, as is required by Title
15A NCAC 4B .0129.
As of April 1,2019, all new construction activities are required to complete and submit an
electronic Notice of Intent(NOI) form requesting a Certificate of Coverage (COC)under the
NCG010000 Construction Stormwater General Permit. This form MUST be submitted and
COC issued prior to the commencement of any land disturbing activity on the above-named .
project. The NOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about
the NOT form to Annette Lucas at Annette.lucas@,ncdenr.gov or Paul Clark at
Paul.clark@ncdenr.gov. After you submit a complete and correct NOT Form, a COC will be
emailed to you within three business days. Initially, DEMLR will not charge a fee for
coverage under the NCG01 permit. However, on or after June 1, 2019, a$100 fee will be
charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in
Raleigh.
North Carolina Department of Environmental Quality 3 Division of.Energy,Mineral and Land Resources
Payettevllle Regional Office i 225 Green Street,Suite 714(Fayetteville,Nstrth Carolina 28391
ktir
AF'
......... p.. / y1Q.4 3.3300
iipumplempui
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following
documentation be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
•
2. The NCGO 1 permit and the COC, once it is received.
3 Records of inspections made during the previous 30 days.
Also,this letter gives the notice required by G.S. 113A-61.1(a)of our right of periodic
inspection to insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring
protection of existing natural resources and adjoining properties. If, following the
commencement of this project,the erosion and sedimentation control plan is inadequate to
meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina
General Statute 113A-51 through 66), this office may require revisions to the plan and
implementation of the revisions to insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and
State water quality laws, regulations, and rules. In addition, local city or county ordinances
or rules may also apply to this land-disturbing activity. This approval does not supersede
any other permit or approval.
Please note that this approval is based in part on the accuracy of the information
provided in the Financial Responsibility Form, which you provided. You are requested to
file an amended form if there is any change in the information included on the form. This
permit allows for a land-disturbance, as called for on the application plan, not to
exceed the approved acres. Exceeding the acreage will be a violation of this permit and
would require a revised plan and additional application fee. Any addition in impervious
surface, over that already noted on the approved plan,would also require a revised plan
to verify the appropriateness of the erosion control measures and the stormwater retention
measures. (GS 113A-54.1(b)). In addition, it would be helpful if you notify this office of
the proposed starting date for this project. Please notify us if you plan to have a
preconstruction conference.
Your cooperation is appreciated.
Sincerely,
GV4. i3c16
Chris Baker
Assistant Regional Engineer
DEMLR-Fayetteville Regional Office
Enclosures: Certificate of Approval
cc: Jamie Guerrero, Morris &Ritchie Associates of NC,PC—electronic copy
Landon Chandler, Harnett, County Inspections Office—electronic copy
Fayetteville Regional Office