Loading...
HomeMy WebLinkAbout20230198 Ver 2_More Info Received_20240102 (8)Baker, Caroline D From: Hunter Wines <hunter.wines@timmons.com> Sent: Tuesday, January 2, 2024 3:08 PM To: Homewood, Sue; mark@fig.11c Cc: Mcdaniel, Chonticha; Phillips, George L CIV USARMY CESAW (USA); Rick Baker; Matt Neely Subject: [External] RE: Request for Additional Information for South Carter Industrial Site - Lee County - DWR#20230198 v2 Attachments: South Carter Industrial - Wetlands and Stream Impacts Plan and Sections.pdf, Figure 5- WTIM.pdf, South Carter Industrial Acceptance Letter Jan2024.pdf,- PSA-33D5-1 (Impact 5 INT).pdf, PSA-41 D1-1 (Impact 4).pdf, PSA-41 E1-1 (Impact 3).pdf, PSA-33135-1 (Impact 2).pdf, PSA-33D5-1 (Impact 5 EPH).pdf Follow Up Flag: Follow up Flag Status: Flagged CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Hi Sue, Happy New Year. Please find responses to the additional information below in red. 1. Please confirm whether riprap aprons will be necessary for velocity control at the outlet of any of the proposed culverts. It is the Division's experience that velocity control is typically required by the erosion control program. If proposed, please update the impact table and drawings accordingly. Energy dissipating outlet protection has been added to the impacts table and drawings. Impacts have been revised to accommodate this addition. 2. Please provide profile drawings indicated that the culverts will maintain aquatic passage. Please ensure that profile drawings include riprap aprons where proposed. Please find profile drawings for impact areas attached. Culverts will be countersunk a minimum of 6" to allow for aquatic life movement. 3. Please provide plan sheets that clearly indicate that the culverts will be installed "in the dry (dewatering)". Please update the impact tables to account for temporary impacts accordingly. Please find a typical detail for stream pump around included on Sheet C1.6 of the attached Impacts Plan and Sections. There are no temporary impacts proposed. 4. Please provide DWR stream forms for all impact areas. As DWR regulations differentiate between intermittent and perennial streams it is essential that we have sufficient documentation to support the statements within the application. Please find stream forms for each impact area attached. 5. Please provide statement of availability and/or mitigation acceptance letters for the permanent stream and wetland impacts. A mitigation acceptance letter for the proposed impacts is attached. Please let me know if you have any questions, need additional information, or have any issues with downloading the attachments. Thanks! Hunter Wines, PWS Project Manager TIMMONS GROUP I www.timmons.com 1001 Boulders Parkway, Suite 300 1 Richmond, VA 23225 Office: 804.200.6386 1 Mobile: 757.272.2081 hunter.winesa-timmons.com Your Vision Achieved Through Ours To send me files greater than 20MB click here From: Homewood, Sue <sue.homewood@deq.nc.gov> Sent: Monday, December 4, 2023 10:10 AM To: Hunter Wines <hunter.wines@timmons.com>; mark@fig.11c Cc: Mcdaniel, Chonticha<chonticha.mcdaniel@deq.nc.gov>; Phillips, George L CIV USARMY CESAW (USA) <George.L.Phil lips@usace.army.mil> Subject: Request for Additional Information for South Carter Industrial Site - Lee County - DWR#20230198 v2 CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. 0 I have reviewed the above noted application and require additional information to continue my review. Please note that as this is a considered a "new' application by the Division we are unable to assume any information provided in the previous application (20230198 v1) remains valid and therefore must require a complete application package. Please provide a response to the items below within 30 days of this email. Please note that the application will be considered "on hold" until a complete response is received. 1. Please confirm whether riprap aprons will be necessary for velocity control at the outlet of any of the proposed culverts. It is the Division's experience that velocity control is typically required by the erosion control program. If proposed, please update the impact table and drawings accordingly. 2. Please provide profile drawings indicated that the culverts will maintain aquatic passage. Please ensure that profile drawings include riprap aprons where proposed. 3. Please provide plan sheets that clearly indicate that the culverts will be installed "in the dry (dewatering)". Please update the impact tables to account for temporary impacts accordingly. 4. Please provide DWR stream forms for all impact areas. As DWR regulations differentiate between intermittent and perennial streams it is essential that we have sufficient documentation to support the statements within the application. 5. Please provide statement of availability and/or mitigation acceptance letters for the permanent stream and wetland impacts. Please contact me if you have any questions regarding these items. Thanks, Sue Homewood (she/her/hers) 401 & Buffer Permitting Branch Division of Water Resources sue.homewood@deg.nc.gov please note my new email address 336 813 1863 mobile 919-707-3679 office Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official.