Loading...
HomeMy WebLinkAbout2015-01799 Hannah Bridge Year 5 Monitoring Credit Release December 22, 2023 Regulatory Division Subject: Year 5 Monitoring Report Review and Credit Release associated with Neu-Con Umbrella Mitigation Bank – Hannah Bridge Mitigation Site (AID SAW-2015-01799) Ms. Katie Obenauf EBX-Neuse I, LLC 3600 Glenwood Avenue, Suite 100 Raleigh, North Carolina 27612 Dear Ms. Obenauf: This correspondence is in reference to the monitoring report and credit release request submitted for the RES Neu-Con Umbrella Mitigation Bank, Hannah Bridge Mitigation Site, Action ID SAW-2015-01799. The purpose of this letter is to transmit comments provided by the NC Interagency Review Team (NCIRT) during the review of the monitoring report and to confirm the annual credit release. The review of the annual monitoring report followed procedures outlined in Section 332.8(o)(9) of the Mitigation Rule. Please refer to the attached December 8, 2023, site visit meeting minutes. No additional comments were received from the NCIRT during this review process. Based on our review of the monitoring report and the results of the NCIRT review, we confirm that you have satisfied requirements included in the approved banking instrument and mitigation plan for this site. Accordingly, with this correspondence we confirm the release of credits as shown on the attached credit release schedule. Additionally, per the request included in your monitoring report submittal, we confirm that you may reduce the bond (Bond No. 9321946) in the amount of $78,600 per the bond reduction schedule. Thank you for your interest in restoring and protecting waters of the United States. If you have questions regarding this letter, please contact me by email at Casey.M.Haywood@usace.army.mil or telephone (919) 750-7397. DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 69 DARLINGTON AVENUE WILMINGTON, NORTH CAROLINA 28403-1343 Sincerely, Casey Haywood Project Manager, Mitigation Branch Enclosure cc (by email): NCIRT Distribution List Project Name: Sponsor Name: USACE Action ID: NCDWQ Action ID: Non-Forested Wetland Credits Warm Water Cool Water Cold Water Riparian Riverine Riparian Non-Riverine Non-Riparian Coastal 4,643.00 10.73 4,643.00 10.73 Scheduled Releases Warm Water Cool Water Cold Water Scheduled Releases Riparian Riverine Riparian Non-Riverine Non-Riparian Scheduled Releases Coastal 1 (Bank/Site Establishment)1, 2 15%846.90 15%2.23 15%10/11/2018 2 (Year 0/As-Built)3 15%670.00 15%1.50 15%8/12/2019 3 (Year 1 Monitoring)10%446.600 10%1.00 10%12/19/2019 4 (Year 2 Monitoring)10%446.600 10%1.00 15%11/20/2020 5 (Year 3 Monitoring)10%446.600 15% 1.50 20% 11/31/2021 11/16/2021 6 (Year 4 Monitoring)5%223.300 5% 0.50 10% 12/31/2022 2/3/2023 7 (Year 5 Monitoring)10% 446.600 15% 1.50 15% 12/31/2023 8 (Year 6 Monitoring)5% 446.600 5% 0.50 NA NA 12/31/2024 9 (Year 7 Monitoring)10% 223.300 10% 1.00 NA NA 12/31/2025 Stream Bankfull Standard4 10%446.500 NA NA NA NA NA NA Dec-22 Total Credits Release to Date 2856.70 4643 5.73 10.73 Date Johnston 3020201 6/27/2018 10/26/2023 County: 8-Digit HUC: Year Project Instituted: Date Prepared: Actual Release Date Potential Credits from As-Built Survey Stream Credits Credit Classification Non-Forested Wetland CreditsForested Wetland CreditsStream Credits Current and Future Credit Releases Credit Release Milestone Wilmington District Mitigation Bank Credit Release Schedule 4 - A 15% reserve of credits to be held back until the bankfull event performance standard has been met. 1 - The first credit release milestone is based on the potential credits stated in the approved mitigation plan. 2 - The first credit release shall occur upon establishment of the mitigation bank, which includes the following criteria: 1) Execution of the MBI or UMBI by the Sponsor and the USACE; 2) Approval of the final Mitigation Plan; 3) Mitigation bank site must be secured; 4) Delivery of the financial assurances described in the Mitigation Plan; 5) Recordation of the long-term protection mechanism and title opinion acceptable to the USACE; 6) 404 permit verification for construction of the site, if required. 3 - The second credit release is based on the credit totals from the as-built survey, and may differ slightly from the credit totals stated in the mitigation plan. Contingencies (if any): Wetland Credits are on hold until further information is provided Signature of Wilmington District Official Approving Credit Release Hannah Bridge EBX-Nesue I SAW-2015-01799 2017-0537v1 Potential Credits from Mitigation Plan Forested Wetland Credits Total Potential Credits Projected Release Date 22DEC23