HomeMy WebLinkAbout[External] RE: Notice of Year 5 Monitoring Report Review / RES Neu-Con UMB - Hannah Bridge/ SAW-2015-01799/ Johnston CountyCAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home
tab.
Jamey,
Attached is the MY 5 credit release approval for the Hannah Bridge project. Please let me know if you have any questions.
Thank you,
Todd Tugwell
Chief, Mitigation Branch
Regulatory Division
Wilmington District, USACE
(919) 210-6265
From: Haywood, Casey M CIV USARMY CESAW (USA) <Casey.M.Haywood@usace.army.mil>
Sent: Friday, November 3, 2023 10:40 AM
To: Tugwell, Todd J CIV USARMY CESAW (USA) <Todd.J.Tugwell@usace.army.mil>; Isenhour, Kimberly T CIV USARMY CESAW (USA) <Kimberly.T.Isenhour@usace.army.mil>; Kichefski, Steven L CIV
USARMY CESAW (USA) <Steven.L.Kichefski@usace.army.mil>; Davis, Erin B CIV USARMY CESAW (USA) <Erin.B.Davis@usace.army.mil>; Bowers, Todd <bowers.todd@epa.gov>; Matthews, Kathryn (kathryn_matthews@fw
s.gov) <kathryn_matthews@fws.gov>; Polizzi, Maria <maria.polizzi@deq.nc.gov>; Haupt, Mac <mac.haupt@deq.nc.gov>; Merritt, Katie <katie.merritt@deq.nc.gov>; Wilson, Travis W. <travis.wilson@ncwildlife
.org>
Cc: Katie Obenauf <kobenauf@res.us>; Jamey Mceachran (jmceachran@res.us) <jmceachran@res.us>
Subject: Notice of Year 5 Monitoring Report Review / RES Neu-Con UMB - Hannah Bridge/ SAW-2015-01799/ Johnston County
Good morning IRT,
The below referenced bank Sponsor has submitted an Annual Monitoring Report for NCIRT review, and is requesting a release of credits. The Annual Monitoring Report has been posted to
the RIBITS Cyber Repository.
This review will follow the process outlined for Credit Release Approval in the 2008 Mitigation Rule (Section 332.8(o)(9)), which requires an IRT review period of 15 calendar days from
the date of this email notification. Please provide any comments by 5 PM on the comment deadline shown below. Comments provided after the 15-day comment deadline may not be considered.
Within 30 days of the conclusion of the IRT review period (comment deadline), a copy of all comments will be provided to the bank Sponsor and the IRT along with District Engineer's
intent to approve or disapprove this credit release. Please indicate if you are requesting a site visit.
15-Day Comment Deadline: December 21, 2023 (15 days following the site visit)
45-Day Credit Release Approval Deadline: December 26, 2023
Site visit scheduled December 06, 2023 at 8:30 AM:
Meadow Spring: 35.546618, -78.344396
*Travel Time Between Sites (30 Minutes)
Hannah Bridge: 35.381720, -78.415618 (georeferenced PDF map attached)
Meeting Time: After Meadow Spring (+/- Noon)
Project Information:
Sponsor: EBX-Neuse I, LLC
Bank Name: Neu-Con UMBI
Site Name: Hannah Bridge Mitigation Site
USACE ID: SAW-2015-01799
River Basin: Neuse
HUC: 03020201
County: Johnston
USACE PM: Kim Isenhour Kimberly.T.Isenhour@usace.army.mil <mailto:Kimberly.T.Isenhour@usace.army.mil>
USACE Specialist: Casey Haywood Casey.M.Haywood@usace.army.mil <mailto:Casey.M.Haywood@usace.army.mil>
Requested MY5 Credit Release:
10% of the total stream restoration and/or enhancement credits: 446.600 warm water stream credits (SMU)
RES has identified areas of wetland as at-risk, and is not requesting the release of any wetland credits at this time
Please be sure to log on to RIBITS before following the link below. Once in the Cyber Repository, select the arrow beside appropriate folder to view and/or download the documents.
Cyber Repository Link: https://ribits.ops.usace.army.mil/ords/f?p=107:278:11565299536416:::RP,278:P278_BANK_ID:4413
Please contact me with any questions.
Thank you,
Casey
Casey Haywood
Mitigation Specialist, Regulatory Division
U.S. Army Corps of Engineers, Wilmington District
(919) 750-7397 work cell
This review will follow the process outlined for Credit Release Approval in the 2008 Mitigation Rule (Section 332.8(o)(9)),
which requires an IRT review period of 15 calendar days from the date of this email notification. Please provide any
comments by 5 PM on the comment deadline shown below. Comments provided after the 15-day comment deadline
may not be considered. Within 30 days of the conclusion of the IRT review period (comment deadline), a copy of all
comments will be provided to the bank Sponsor and the IRT along with District Engineer's intent to approve or
disapprove this credit release. Please indicate if you are requesting a site visit.
15-Day Comment Deadline: December 21, 2023 (15 days following the site visit)
45-Day Credit Release Approval Deadline: December 26, 2023
Site visit scheduled December 06, 2023 at 8:30 AM:
Meadow Spring: 35.546618, -78.344396
*Travel Time Between Sites (30 Minutes)
Hannah Bridge: 35.381720, -78.415618 (georeferenced PDF map attached)
Meeting Time: After Meadow Spring (+/- Noon)
Project Information:
Sponsor: EBX-Neuse I, LLC
Bank Name: Neu-Con UMBI
Site Name: Hannah Bridge Mitigation Site
USACE ID: SAW-2015-01799
River Basin: Neuse
HUC: 03020201
County: Johnston
USACE PM: Kim Isenhour Kimberly.T.Isenhour@usace.army.mil
USACE Specialist: Casey Haywood Casey.M.Haywood@usace.army.mil
Requested MY5 Credit Release:
10% of the total stream restoration and/or enhancement credits: 446.600 warm water stream credits (SMU)
RES has identified areas of wetland as at-risk, and is not requesting the release of any wetland credits at this time
Please be sure to log on to RIBITS before following the link below. Once in the Cyber Repository, select the arrow beside
appropriate folder to view and/or download the documents.
Cyber Repository
Link: https://ribits.ops.usace.army.mil/ords/f?p=107:278:11565299536416:::RP,278:P278_BANK_ID:4413
Please contact me with any questions.
Thank you,
Casey
Casey Haywood
Mitigation Specialist, Regulatory Division
U.S. Army Corps of Engineers, Wilmington District
(919) 750-7397 work cell