HomeMy WebLinkAbout20231267_Cardinal Pipeline Relocation Project_NBR_Wake_WildlandsBufferMRT 12-8-2023 - signed.pdf F,,,STATE aFA'
a.173 O
ROY COOPER
Governor
ELIZABETH S.BISERnlz.�� a2
Secretary *�Af QUAMN°�°'*
RICHAM E.ROGERS,JR. NORTH CAROLINA
Director Environmental Quality
COMPENSATORY MITIGATION RESPONSIBILITY ACCEPTANCE FORM
December 8, 2023
Permittee: Laura Rudolf and Williams DWR Project#20231267
Project Name: Cardinal Pipeline Relocation Project County: Wake
The Division has received a Statement of Availability(SOA)from Wildlands Holdings III, LLC [hereby
known as Bank Sponsor(s)] for use of the following mitigation banks: Anderson Farm,Black Dirt, Cox
Pond,Falling Creek, Grantham Branch, Little River Weaver, Long Pond,Moccasin Creek, O'Berry Road,
Rosewood, Sassarixa Swamp lI, and Thoroughfare Swamp Mitigation Bank Parcels to satisfy the
mitigation requirements set forth in the Buffer Authorization issued to Laura Rudolf and Williams, dated
November 29th, 2023, as provided in the table below.
Compensatory Mitigation River and 8-digit HUC Number
Neuse River Neuse—03020201
Riparian Buffer 29,619 square feet(credits) (Outside Falls Lake Watershed)
The Permittee must provide a copy of this form to the Mitigation Provider specified above who will then
sign the form to verify receipt of payment and the transfer of the mitigation responsibility. Once the
Mitigation Provider has signed this form, it is the Permittee's responsibility to ensure that a signed copy
of this form for all buffer mitigation and the mitigation transfer certificate is submitted to the Division
before conducting any of the authorized impacts.
The Mitigation Provider verifies that the mitigation requirements (credits) shown above, have been
released and are available at the identified bank site(s). By signing below,the Mitigation Provider is
accepting full responsibility for the identified mitigation. As a reminder to the Mitigation Provider,no
more than 25 percent of the total mitigation required by Division can be met through preservation,unless
requested and approved by the Division Director(15A NCAC 02H. 0506(c)(7)).
Signature Authority Name(print): Robert W. Bugg
Signature: Date: Dec 22, 2023
D E Q North Carolina Department of Environmental Quality I Division of Water Resources
vRaleigh Regional Office I 3800 Barrett Drive I Raleigh,North Carolina 27609
NORTHCAROUNA 919.791.4200
Department ofEnvlronmantal Duali�
20231267_Cardinal Pipeline Relocation Project_
NBR Wake WildlandsBufferMRT 12-8-2023
Final Audit Report 2023-12-22
Created: 2023-12-22
By: Camden Brunick(cbrunick@wildlandseng.com)
Status: Signed
Transaction ID: CBJCHBCAABAAzAu8DBnZRDCW5eJckb08Ud7XMMhb61VE
"20231267_Cardinal Pipeline Relocation Project_NBR_Wake_Wi
IdlandsBufferMRT 12-8-2023" History
Document created by Camden Brunick(cbrunick@wildlandseng.com)
2023-12-22-3:15:05 PM GMT
Document emailed to Robert Bugg (rbugg@wildlandseng.com)for signature
2023-12-22-3:15:27 PM GMT
Email viewed by Robert Bugg (rbugg@wildlandseng.com)
2023-12-22-3:16:55 PM GMT
dp Document e-signed by Robert Bugg (rbugg@wildlandseng.com)
Signature Date:2023-12-22-3:17:06 PM GMT-Time Source:server
Agreement completed.
2023-12-22-3:17:06 PM GMT
Adobe Acrobat Sign