HomeMy WebLinkAboutNCG100026 - Wagner Auto Salvage Incorporated STORMWATER DISCHARGE OUTFALL(SDO)
MONITORING REPORT
CERTIFICATE OF COVERAGE NO. NCG100 0 2 6 SAMPLES COLLECTED DURING CALENDAR YEAR: 2015
(This monitoring report shall be received by the Division no later than 30 days
from the date the facility receives the sampling results from the laboratory.)
FACILITY NAME Wagner's Auto Salvage, Inc. COUNTY Durham
PERSON COLLECTING SAMPLE(S) Pat Wagner PHONE NO. ( 800 ) 669-1673
CERTIFIED LABORATORY(S) TestAmerica Pensacola Lab# 314
Lab# PLEASE REMEMBER TO SIGN ON THE REVERSE 4
Part A: Stormwater Benchmarks and Monitoring Results
For sampling periods with no discharge, you must submit this discharge monitoring form noting "No Flow"or "No Discharge"within
30 days of the end of that period to comply with permit reporting requirements.
Outfall Date 00400 00530 ---- 77023 01051 78141
No. Sample Collected, Total pH, Total Suspended Non-polar Ethylene Glycol, Lead,Total Total Toxic
mo/dd/year Rainfall, Standard Solids(TSS), O&G/TPH mg/L Recoverable, Organics3,
inches Units mg/L (Method 1664 mg/L mg/L
_ SGT-HEM), mg/L _
8,000
Benchmark 6.0—9.01 100/502 15 (Tiers 2 and 3) 0.03 1.0
001 01/18/2015 2 _ N/A 7.0 <5.0 <1.0 <0.0050 Exempt
002 01/18/2015 2 N/A 7.0 <5.0 <1.0 0.0078 Exempt
Note: If you report a sampled value in excess of the benchmark value, or outside the benchmark range for pH,you must implement Tier 1 or Tier 2 responses in the General
Permit.
1See If pH values outside this range are recorded in sampled stormwater discharges,but ambient precipitation pH levels are lower,then the lower threshold of this benchmark
range is the pH of the precipitation(within instrument accuracy) instead of 6 S.U. Readings from an on-site or local rain gauge(or local precipitation data) must be documented
to demonstrate background concentrations were below the benchmark pH range of 6-9.
2See General Permit text to identify whether the more protective benchmark applies for especially sensitive receiving waters.
3For purposes of this permit the definition of Total Toxic Organics is that list as stated in Appendix D,Table II of Chapter 40 Code of Federal Regulations(CFR) Part 122.
Form SWU-251,last revised October25,2012
Page 1 of 2
•
STORMWATER DISCHARGE OUTFALL(SDO)
MONITORING REPORT
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may request that DWQ waive monitoring of total toxic organics. The solvent
management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities allowed such a waiver,the
discharger shall sign the following certification statement:
Solvent Management Plan Certification Statement
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics(TTO), I
certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater
runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing all the provisions of the solvent management plan
included in the Stormwater Pollution Prevention Plan."
/ /1 T
Name(Print name)
Title(Print title)
bs-
Signature 6 Date
Mail Original and one copy to:
Division of Water Quality
Attn: Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
"I certify,under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system,or
those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
(Signature of Permittee or Designee) (Date)
Form SWU-251,last revised October 25,2012
Page 2 of 2