Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW4231202_Plansheet - Misc. Detail_20231229
POND N SPECT 0N1 MAN TEN Ail CE SCHEDULE 3Do = 3(15) = 4.5' 3Do = 3(1.25') = 3.75' 3Do = 3(2.5') = 7.5' ( AS SHOWN IN OPERATION AND MAINTENANCE AGREEMENT) 3 3 3 w = 1.5'+15'=16.5' w = 1.25'+8'=9.25' w = 2.5'+16'=18.5' o I I o I I o I I Inspection activities shall be performed as follows. Any problems that are found shall outlet W = Do + La 9 _ Outlet W = Do + La 9 _ Outlet W = Do + La 9 _ pipe ; pipe I• pipe I ,, be repaired immediately. diameter(Do) L -�� 80 F ,I diameter(Do) 80 I F j diameter(Do) 80 1 $ La - L - I t_"T,ilwater < 0.5Do ;_: �,� T ilwater < 0.5Do ; _ � i t_"T ilwater < 0.5Do BMP element: Potential problem: How I will remediate the problem: 1�a1 i - l�,a��`l' I ' The entire BMP Trash/debris is resent. Remove the trash/debris. La = 15' ro,<Pp`°60 - - - „ La = 8' r°k Pp`°60 = f { La = 16' r°k Pp0 ti „ The erimeter of the wet Areas of bare soil and or Re ade the soil if necessa to �e�g 1 r 1�_ �,e�g` - r - .� �,e�g` detention basin erosive gullies have formed. remove the gully, and then plant a USE La = 15' - h ! ° a a USE La = 8' f j - a USE La = 16 f ' oTH a ground cover and water until rt is Ia I a ' oe J la_ - a ' -,� a I4- -- a ' - J a established. Provide lime and a I f� A - i - 3 a ' 3 2 a , 3 2 a , one-time fertilizer application. - , 1a i - 3 20 2 15 1d " 3 20 lg __ 3 20 15 - Vegetation is too short or too Maintain vegetation at a height of - - _ - 01, Ilon a roximatel six inches. NEI 10SHIA „ D ''" totth -- - ,, D toa • ,_ I_ = O- � N :� (D �- 'gyp N BMP element: Potential problem: How I will remediate the problem: o a 2 �, o - 2 �, 0 2 -- -- - -- -- -- -The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the _ a _� _ a � _ a _� f f , 1 L f I , 1 P P P P gg g P P P 44 _IIIIi{II� a s � 4 {_ICI}� � a � 4 {_ICI} ll I'lllf- , - _ - - II I 1 �i"f- ' - - - II I 1 I'I"f- ' cc Swale sediment off-site. - - =20 0 -1IT = o - _ The pipe is cracked or Replace the pipe. _ LO 1�� a _ 1 1 1 I , y= 10"d I.'I u I ' 1 t , II y= 10 a .1 II I � ' I ' . I II �= 10 d I � • � , I. otherwise dama ed. : , : I v=5.11 .... I. . . I.�� .. _:.. .:I �.I. I . ' �i :�' I. v= 5• I ,i I I� v= 5 : Erosion 1s occurring in the Regrade the swale if necessary to 11 o i : , o i : 1 o swale. smooth it over and provide erosion 3 5 10 20 50 100 200 500 Discharge 1000 3 5 l0 20 50 100 200 500 1000 eft /sec _ 3 5 10 20 50 100 200 1000 Discharge(ft3/sec) d50 = 0.5' (6") g ( � ) d50 - 0.25 (3 )„ Discharge(ft3/sec) d50 = 0.5' (6") 500 control devices such as reinforced USE CLASS B RIP RAP (d50 = 8") USE CLASS B RIP RAP (00 = 8") USE CLASS B RIP RAP (00 = 8") turf mattingor ri ra to avoid CLASS B: dMAX = 12" CLASS B: dMAX = 12" CLASS B: dMAX = 12" rip rap Curves may not be extrapolated. " Curves may not be extrapolated. " Curves may not be extrapolated. " " THICKNESS = 1.5(12 ) = 18 THICKNESS = 1.5(12 ) = 18 THICKNESS = 1.5(12 ) = 18 future problems with erosion. Figure 8.06a Design of outlet protection protection from a round pipe flowing full,minimum tailwater condition(TW<0.5 diameter). Figure 8.06a Design of outlet protection protection from a round pipe flowing full,minimurn tailwater condition(TW<0.5 diameter). Figure 8.06a Design of outlet protection protection from a round pipe flowing full,minimurn tailwater condition(TW<0.5 diameter). The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if RIP-RAP PAD AT 18" BARREL RIP-RAP PAD AT FES #38 RIP-RAP PAD AT FES #45 original design depth for possible. Remove the sediment and DESIGN FLOW = 15.58 CFS @ WS EL: 750.00, Do = 18" (15) DESIGN FLOW = 2.56 CFS, Do = 15" (1.251) DESIGN FLOW = 17.81 CFS, Do = 30" (2.51) sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion 9 9 protection such as reinforced turf 15 89 16 matting or riprap if needed to prevent future erosion problems. Ln 2 L_B Weeds are present. Remove the weeds, preferably by hand. if pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant C EA S S B 9 CLASS B 9 � C EA S S B 9 health. P P 1 899 CAP � 1 6 . G 1 @' RCP � � g . 2G G@9 RCP \ / 18 . 5 R P RAP , R P RAP , R P RAP Plants are dead, diseased or Determine the source of the 1 8 9 9 T H C K 1 8 9 9 T H C K 1 8 99 T H C K dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. R P - RAP PAD 4 R P - RAP PAD 4 R P - RAP PAD 4 The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if 18 BARREE DET@E FES # 38 FES 4 G original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them La invasive plants cover 50% of with pesticide (do not spray). OUTLET PROTECT ON the basin surface. W, BMP element: Potentialproblem: How I will remediate theproblem: E E S # SIZE E L0 W( c f s ) La (f t) W, W2 Thickness (ft) RP - RAP The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. CLASS B 18 " 18 9 15 . 49 1 5 ' 4. 5 ' 16 . 5 9 1 8 99 CLASS B PROJECT TITLE: Evidence of muskrat or Use traps to remove muskrats and W BARRELTHE TOWNES AT BERMUDA RUN beaver activity is present. consult a professional to remove PIPE R P RAP 2 Q Q Q PHASE 1 38 1 5 " 2 . 56 3 . 7 5 ' 9 . 2 5 ' 18 "99 CLASS B DABE COUNTY N,NORTH TOWNSHIP beavers. BERMUDA RUN,NORTH CAROLINA 4 5 3 0 " 1 7 . 81 1 6 ' 7 . 5 ' 1 8 . 5 ' 1 8 " CLASS S B OWNER/DEVELOPER: A tree has started to ow on Consult a dam safe specialist to 249 DE REALTY, Y grow safety p 249 DEARDOM WAY the embankment. remove the tree. CHAPEL HILL,NC 27516 336-707-9799 An annual inspection by an Make all needed repairs. 00cA•�� appropriate professional + vans ���FEss. shows that the embankment D E TA OUTLET P R O T E C T O G E O T E X T E E E N E R T O B E ngineering9 Inc needs repair. if applicable) I Engineers Surveyors Plananaen•s, ; 035014 STA ED UNDERNEATH %% 11 �3 ,�: 46©9 Dnxm�las Drivz Gszee�sboeo,NC 67407 � The outlet device Clogging has occurred. Clean out the outlet device. DisposePh.ne336.854.8877 Fax ,�NGiNE�,,��, of the sediment off-site. FIRM LICENSE#CIO168 R P R A P PAD PROJECT: 763-30 DESIGN BY DF DRAWN BY: DF �� �♦ Theoutlet device is damaged Repair or replace the outlet device. H:\CMI 30 2019 P,,I,ee\P-1 Mllam\13-du Run\D,..inps\Ph... 1\8---da Run C...-fi-Plans 3.0-W.W.h•d.d., SHEET DESCRIPTION: The receiving water Erosion or other signs of Contact the local NC Division of WET DETENTION damage have occurred at the Water Quality Regional Office, or POND #1 DETAIL SCALE: N/A DATE: NOVEMBER 17, 2023 outlet. the 401 Oversight Unit at 919-733- REVISIONS: SHEET NO.: 1786. C5.3 12"(30cm) CHANNEL 4"(10an) INSTALLATION ` �` �� .00 ` ; -6 v .e .�, - (15cm) \�\\ 4" lOcm �:. , \� (15cm) ( ) 1 . Prepare soil before installing rolled erosion control products (RECPs), =,_ including any necessary application of `. RollMax Product 5 lime, fertilizer, and seed. _ $ F ?, �. 14 2 � 2. Begin at the top of the channel by _ anchoring the RECPs in a 6"(15cm) 6" deep X 6"(15cm) wide trench with approximately 12" 30cm of RECPs , (15cm) pp y ( > 2"-5" extended beyond the up-slope portion W of the trench. Use ShoreMax mat at the - ,- (5-12.Sam) channel/culvert outlet as supplemental \\ scour protection as needed. Anchor the TEMPORARY TEMPORARY \\\� RECPs with a row of staples/stakes Typical Slope Typical Slope Channel Channel Product 4tt_6tt approximately 12"(30cm) apart art in theDescription Application \\ bottom of the trench. Backfill and Description KV) Thresholds (10 15cm) �v v compact the trench after stapling. Apply Accelerated Woven \\\W W W seed to the compacted soil and fold the b' photodegradable, biodegradable "s jute to and 2.35 psf / 11 polypropylene top 45 days 4:1 3:1 1.55 psf/5.0 fps 1 P P /10.0 „ 36 coo. 1:1 and Greater e- \ © remaining 12 (30cm) portion of RECPs net,100%straw bottom net,100% fps fiber matrix coconut fiber back over the seed and compacted soil. DS75 c125BN matrix W w W Secure RECPs over compacted soil Accelerated \ ven 0% photodegradable, 700gwadab with a row of staples/stakes spaced biodegradable // \\ �� polypropylene 60 days 3:1-2:1 1.75 psf/6.0 fps coir top net,100% ® W // \ \\ W w approximately 12 apart across thePW top E bottom net, 2.35psf/10.0 coconut fiber 36+coo. 1:1 and Greater Wldth Of the RECPS. 1D0%straw fiber matrix,woven fps j A\j DS150 matrix biodegrdable jute 3. Roll center RECPs in direction of water C70OBN bottom net W W % \ flow in bottom of channel. RECPS will photodegradable, PERMANENT unroll with appropriate side against the polypropylene 12 months 4:1-3:1 lsspsf/S.0fps net,100/o straw ERONET soil surface. All RECPs must be fiber matrix / \\ securely fastened to soil surface by 575 UV-stable Unvegetated \�\ placing staples/stakes In appropriate\\ Photodegradable, polypropylene 3.0psf/9.Ofps(PP)top and Permanent 1:1 / polypropylene locations as shown in the staple pattern top o bottom net, 12 months 3:1 bottom net,100% Vegetated 2:1 1.75 psf/6.0 fps guide. 100%straw fiber PP fiber matrix 10 psf/16.0 fps matrix P300=1 4. Place consecutive RECPs end-over-end S150 6 (Shingle y ) Shin le style) with a 4"-6" overlap. UV-stable Use vMAx % a double row of sta staples sta ered 4" polypropylene (15cm) - / / p staggered top net,70/o UV-stable PP top III= / apart and 4" on center to secure straw/30% &bottom nets, Unvegetated RECPs. coconut 24 months 2:1-1:1 2.0 psf/8.0 fps UV-stable PP 2.3 psf/8.5 fps Permanent 1:1 and Greater fiber matrix, crimped°center Vegetated ® 5. Full length edge of RECPs at top of side photodegradable net,100%straw 8 psf/18fps Ok slopes must be anchored with a row of polypropylene fiber matrix SC150 bottom net 5200 staples/stakes approximately 12"(30cm) UV-stable PP UV stable top 6 bottom apart In a 6 (15cm) deep X 6 (15cm) polypropylene top nets,UV-stable Unvegetated 2.25 psf/10.0 wide trench. Backfill and compact the P, &bottom nets, 36months 1:1 and Greater PP crimped 3.0 psf/9.5 fps CRITICAL POINTS NOTES: p 100%coconut fps ° Permanent 1:1andGreater trench after stapling. centernet,70% fiber matrix straw/30% Vegetated p g' 10 psf/15.0 fps E125 coconut fiber A. Overlaps and Seams *Horizontal staple spacing should be 6. Adjacent RECPS must be overlapped SC250 matrix B. Projected Water Line altered if necessary to allow staples to approximately 211-511 (5-12.5cm) BIONET UV-stable PP C. Channel Bottom/Side Slope Vertices secure the critical points along the channel (Depending on RECPS type) and Leno woven top&bottom Unvegetated stapled. nets,UV-stable 3.2 sf 1 surface. biodegradable p / O.Sfps A A p jute top net, 12 months 4:1-3:1 1.6 psf/5.0 fps PP crimped Permanent 1:1 and Greater 7. In high flow channel applications a 100%straw fiber center net,100% Vegetated matrix coconut fiber 12 psf/20fps C350 C C **In loose soil conditions, the use of staple 575BN matrix to 40 foot (9 -12m) intervals. Use a >_ or stake lengths greater than 6" 15cm may Woven UV-stable PP top g g y double row of staples staggered biodegradable Unvegetated II II jute to . / . U bottom nets, be necessary to properly secure the 4 (10cm) apart and 4 (10cm) on center - j p and 12 months 3:1-2:1 185sf 60 fps p p UV-stable PP 4.Opsf/12.5fps RECPs. over entire width of the channel. bottom straw fiber net,10dcenter Permanent 1:1andGreater Drawin Not To Scale straw fiber matrix net,100%PP fiber Vegetated g 8. The terminal end of the RECPs must be S150BN P550 matrix 14 psf/25fps anchored with a row of staples/stakes Woven NORTH Disclaimer: approximately 12" (30cm) apart in a biodegradable Vegetated jute top and 100%UV-stable 6"(15cm) deep X 6"(15cm) wide trench. P PPmonofilament TMax:16 psf / AMERICAN The information presented herein is general design information only. For specific applications bottom net, 18months 2:1 1;1 2.10psf/8.Of s r 70%straw/30% Permanent 1:1 and Greater 25fps Backfill and compact the trench after coconutfiber yarns,structure GREEN' consult an independent professional for further design guidance. a3 Dstructure TMax20fpspsf/ Stapling. matrix TMAX/ 20 fps 3 5401 St. Wendel - Cynthiana Rd. PH: 800-722-2040 5C150BN TMAX31< Poseyville, IN 47633 www.nagreen.com Drawn on: 5-4-17 32' 750.00 `�•J OQ�, A•J OQ� Ln C�AF 100-YR ELEVATION = 748.86 �� F 17 DEPTH = 0.36' DEPTH = 0.11 ' TOP OF TURF: 748.50 20' WEIR SECTION 20 PROJECT TITLE: GRASS LINED EMERGENCY SPILLWAY EXIT SECTION THE TOWNES AT BERMUDA RUN W/ NORTH AMERICAN GREEN P550 GRASS LINED EMERGENCY SPILLWAY PHASE 1 TURF REINFORCEMENT MATTING DISCHARGE = 14. 12 CFS W/ NORTH AMERICAN GREEN P550 DARE MUARNTY RUN,NORTH WNSHIP 4: 1 SIDE SLOPES BERMUDA RUN,NORTH CAROLINA (OR APPROVED EQUAL) TURF REINFORCEMENT MATTING OWNER/DEVELOPER: LC BOTTOM WIDTH = 20' 4: 1 SIDE SLOPES (OR APPROVED EQUAL) 249DE REALTY, Y 249 DEARDOM WAY FLOW DEPTH = 0. 36' 33. 33% SLOPE CHAPEL HILL,Nc27s16 336-707-9799 DISCHARGE = 14. 12 CFS BOTTOM WIDTH = 20' 1 .0'N G_ARO +E ya s VELOCITY OVER WEIR LIP = 1 .83 HT/SEC n = 0. 030 + ngnnaarnnge Inc • • 197-1- FREEBOARD AND SETTLEMENT= 1 . 14' DEPTH = 0. 11 ' Engineers 5 anr sueveyors Planners 0350®r • 14 •CZ i i-i7-23 i�hi �}6499 Dn¢ndas Drive Greensbv ,NC Z7407 • Ph-e 336.854.8877 Fax 336-854-8876 � ,�; G+ �' � • TOP OF DAM ELEVATION = 750. 00 VELOCITY= 6. 28 FT/SEC FIRM LICENSE#C,0168 i N •��(.LT�".__�' ;•' PROJECT: 763-30 DESIGN Y. DF DRAWN BY: DF ''+_� ����• H:\CM1 30 2019 P,,1,es\Pau1 Milam\8-da Run\0r iaps\Phaes 1\8amaada Run Coas-i-Plans 3.0-Wafe hed.d,g SHEET DESCRIPTION: WET DETENTION EMERGENCY SPLLWAY CONTROL SECT ON EMERGENCY SPLLWAY EMT SECT ON POND #1DETAIL SCALE: N/A DATE: NOVEMBER 17, 2023 N TS N TS REVISIONS: SHEET NO.: C5.4