Loading...
HomeMy WebLinkAboutNCC205454_NOT Signed Certification_20231219 NCGO1 Notice of Termination (NOT) Certification Form Directions: Print this form, complete,scan and upload to the electronic NOT(Rescission)form. Then, mail the original signed form to the NC DEMLR Stormwater Program at: Division of Energy, Mineral & Land Resources Stormwater Program 512 N.Salisbury Street, 6th Floor 1612 Mail Service Center Raleigh, NC 27699-1612 DO NOT MAIL THIS FORM UNTIL YOUR NOT REQUEST HAS BEEN REVIEWED AND APPROVED. THE FORM YOU MAIL MUST BE COMPLETED WITH AN ORIGINAL SIGNATURE(NOT DIGITAL) [40 CFR 122.22] General Permit Certificate of Coverage (COC) No.: N 1 7o5it��f' Name of Project: l,O r l \' v I n611 riot I 1 Per NC General Statute 143-215.6E(i), any person who knowingly makes any false statement, representation, or certification in any application, record, report,plan, or other document filed or required to be maintained under this Article or a rule implementing this Article. . . shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars($10,000). Under penalty of law, I certify that: I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for the subject facility. I am familiar with the information contained in this request, and to the best of my knowledge and belief, such information is true, complete, and accurate.Legally Responsible Organizational Entity(must match eNOT): 3r&Lcl ��� r>In Y 4+ *Legally Responsible Person (must match eNOT): rr..q le �1 *Title of Legally Responsible Person: V i\ke,r Print Name&Title of Signed if Authorized Individual Differs from Legally Responsible Person: *Signature: Date: r 7'// `4)3 * IMPORTANT NOTE: This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part iV,Section B, Item (6)of the NCG010000 permit. For more information on signatory requirements,see Part iV,Section B, Item(6)of the NCG010000 permit.