Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WQ0044542_Application (FTSE)_20231208
)ocuSign Envelope ID 693665FE-553F-4C3C-9A72-001B75FCBCEI State of North Carolina Department of Environmental Quality OUR Division of Water Resources FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources FTA 06-21 & SUPPORTING DOCUMENTATION Application Number: Q oo 445'q 2 (to be completed by DWR) All items must be completed or the application will be returned 1. APPLICANT INFORMATION: l. Applicant's name: Terra Equity(company,municipality, HOA,utility,etc.) 2. Applicant type: ❑ Individual ®Corporation ❑General Partnership ❑ Privately-Owned Public Utility ❑ Federal ❑ State'County ❑ Municipal ❑Other 3. Signature authority's name: Kathy Mathews per 15A NCAC-021 .0106iba Title: CFO 4. Applicant's mailing address: 3605 Glenwood Avenue Suite 500 City: Raleigh State:NC Zip:27612 Phone number: 502-412-2800 x 103 Email Address: KMathews barristerc .com 11. PROJECT INFORMATION: I. Project name: Research Triangle Logistics Park(RTLP)Water and Sewer Extensions 2. Application/Project status: ® Proposed(New Permit) ❑ Existing Permit/Project If a modification,provide the existing permit number: WQ00 and issued date: , For modifications,also attach a detailed narrative description as described in Item G of the checklist. If new construction,but part of a master plan,provide the existing permit number: WQ00 located:3. County where project is 4. Approximate Coordinates(Decimal Degrees): Latitude: 36.037 Longitude: -79.105-10�ep,ot��`1 5. Parcel ID(if applicable): 9863916573(or Parcel ID to closest downstream sewer) Q 2��3 �N 3 Ill. CONSULTANT INFORMATION: a .VILOO1���'�e Ete� 1. Professional Engineer: Don Sever License Number:24627 �d� 11n)c� Firm: Summit Design&Engineering Mailing address:3301 Benson Dr. Suite 400 City: Raleigh State:NC Zip:27609- Phone number:U 322-01 IS x 3239 Email Address:dons donever@summitde.com 1V. WASTEWATER TREATMENT FACILITY(WWTF) INFORMATION: 1. Facility Name:Town of Hillsborough WWTP Permit Number:NCO026433 Owner Name: Town of Hillsborough V. RECEIVING DOWNSTREAM SEWER INFORMATION: 1. Permit Number(s): WQ0035025 2. Downstream(Receiving)Sewer Information: 16 inch ® Gravity ❑ Force Main 3. System Wide Collection System Permit Number(s)(if applicable): WQCS00077 Owner Name(s): Town of Hillsborou h FORM: FTA 06-21 Page 1 of 5 DocuSign Envelope ID:B93665FE-553F-4C3C-9Al2-001 B75FCBCEI VI. GENERAL REQUIREMENTS I. If the Applicant is a Privately-Owned Public Utility,has a Certificate of Public Convenience and Necessity been attached? [:] Yes ®No ❑N/A 2. If the Applicant is a Developer of lots to be sold,has a Developer's Operatiorial_Agreement(FORM: DEV)been attached? ❑Yes ®No ❑N/A 3. If the Applicant is a Home'Property Owners'Association,has an HOA.'POA Operational Agreement(FORM: HOA)and supplementary documentation as required by 15A NCAC 02T.0115(c)been attached? ❑ Yes ®No ❑MA 4. Origin of wastewater: (check all that apply): ❑ Residential(Individually Owned) ❑ Retail(stores,centers,malls) ❑Car Wash ❑ Residential(Leased) ❑ Retail with food preparation/service ❑ Hotel and/or Motels ❑ School!preschool;day care ❑ Medical/dental.'veterinary facilities ❑ Swimming PooUClubhouse ❑ Food and drink facilities ❑Church ❑ Swimming Pool/Filter Backwash ® Businesses/offices!factories ❑Nursing Home ❑Other(Explain in Attachment) 5. Nature of wastewater: 0%Domestic %Commercial 0°ro Industrial(Sec 15A NCA!C 02T_0)43(20)) If Industrial,is there a Pretreatment Program in effect?❑ Yes®No 6. Hasa flow reduction been approved under 15A NCAC:02T.01 14(t)? ❑Yes ®No ➢ If yes,provide a copy of flow reduction approval letter with this application 7. Summarize wastewater generated by project: Establishment Type(see 02T.0114(f)) Daily Design Flow',b No.of Units Flow GPD gal/ GPD gal/ GPD gaU GPD gal./ GPD gat! GPD Total 0 GPD a See 15A NCAC 02T.01 14(b). (d),jcJ(,1]and(el(2) for caveats to wastewater design flow rates(i.e., minimum flow per dwelling;proposed unknown non-residential development uses;public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S.42A-4). b Per 15A NCAC 02T.0114(c),design flow rates for establishments not identified[in table 15A NCAC 02T.01 141 shall be determined using available flow data,water using fixtures,occupancy or operation patterns,and other measured data. 8. Wastewater generated by project: 0 GPD(per 15A NCAC 021_.01 Ig) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero,please indicate why: ❑ Pump Station/Force Main or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line. Please provide supplementary information indicating the approximate timeframe for permitting upstream sewers with flow. ❑ Flow has already been allocated in Permit Number: Issuance Date: ❑ Rehabilitation or replacement of existing sewers with no new flow expected ® Other(Explain): The sanitary sewer lines are being ended for a future industrial park. FORM: FTA 06-21 Page 2 of 5 ocuSign Envelope ID:B93665FE-553F-4C3C-9Al2-Co1B75FCBCE1 VI1. GRAVITY SEWER DESIGN CRITERIA(If Applicable)-02T.0305& MDC(Gravity Sewers): 1. Summarize gravity sewer to be permitted: Size(inches) Length (feet) Material 8 499 PVC 12 688 PVC 12 1517 DIP ➢ Section 11&III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirements is not allowed and a violation of the MDC Vlll. PUMP STATION DESIGN CRITERIA(If Applicable)—02T.0305&MDC(Pump Stations/Force Mains): PROVIDE A SEPARATE COPY OF THIS PAGE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT l. Pump station number or name: 2. Approximate Coordinates(Decimal Degrees): Latitude: Longitude:- 3. Total number of pumps at the pump station: 3. Design flow of the pump station: millions gallons per day(firm capacity) ➢ This should reflect the total GPM for the pump station with the largest pump out of service. 4. Operational point(s)per pump(s): gallons per minute(GPM)at feet total dynamic head(TDH) 5. Summarize the force main to be permitted(for this Pump Station): Size(inches) Length(feet) Material If any portion of the force main is less than 4-inches in diameter,please identify the method of solids reduction per MDCPSFM Section 2.01C.i.b. ❑Grinder Pump ❑ Mechanical Bar Screen ❑Other(please specify) 6. Power reliability in accordance with 15A NCAC 02T.0305(h)(i): ❑ Standby power source or ❑ Standby pump ➢ Must have automatic activation and telemetry- 15A NCAC 02T.0305(h)(1)(B)_ ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility and may not be portable Or if the pump station has an average daily flow less than 15,000 gallons per day 15A NCACO2T.0305(h)(1)(C): ❑ Portable power source with manual activation,quick-connection receptacle and telemetry- or ❑ Portable pumping unit with plugged emergency pump connection and telemetry: ➢ Include documentation that the portable source is owned or contracted by the applicant and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations,an evaluation of all the pump stations'storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes,shall be provided as part of this permit application in the case of a multiple station power outage. FORM: FTA 06-21 Page 3 of 5 Docu5ign Envelope ID:B93665FE-553F-4C3C-9Al2-001 B75FCBCEI IX. SETBACKS& SEPARATIONS—(02B.0200& 15A NCAC 02T.0305(f)): 1. Does the project comply with all separations.�Ialternatives found in 15A NCAC 02T ,0305(f)&(g)? ® Yes []No 15A NCAC 02T.0305 contains minimum separations that shall be provided for sewers stems: Setback Parameter* Separation Required Storm sewers and other utilities not listed below(vertical) 18 inches 'Water mains(vertical-water over sewer preferred, including in benched trenches) 18 inches 'Water mains(horizontal) 10 feet Reclaimed water lines(vertical-reclaimed over sewer) 18 inches Reclaimed water lines(horizontal-reclaimed over sewer) 2 feet **Any private or public water supply source,including any wells, WS-1 waters of Class I or Class II impounded reservoirs used as a source of drinking water,and associated wetlands. 100 feet **Waters classified WS(except WS-I or WS-V),B, SA,ORW,HQW,or SB from normal high water(or tide elevation)and wetlands associated with these waters(see item IX.2) 50 feet **Any other stream, lake,impoundment,or ground water lowering and surface drainage ditches,as well as wetlands associated with these waters or classified as WL. 10 feet Any building foundation(horizontal) 5 feet Any basement(horizontal) 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade(vertical) 36 inches ➢ If noncompliance with 02T.0305(f)or L see Section X.1 of this application *15A NCAC 02T.0305(g)contains alternatives where separations in 02T.0305(f)cannot be achieved. Please check"yes" above if these alternatives are used and provide narrative information to explain. **Stream classifications can be identified using the Division's NC Surface Water lassifications webDaQe 2. Does this project comply with the minimum separation requirements for water mains? ® Yes ❑No ❑N/A ➢ If no,please refer to 15A NCAC 18C.0906(f)for documentation requirements and submit a separate document, signed/sealed by an NC licensed PE,verifying the criteria outlined in that Rule. 3. Does the project comply with separation requirements for wetlands? ® Yes ❑No ❑N/A ➢ Please provide supplementary information identifying the areas of non-conformance. ➢ Seethe Division's draft separation requirements for situations where separation cannot be met. ➢ No variance is required if the alternative design criteria specified is utilized in design and construction. 4. Is the project located in a river basin subject to any State buffer rules? ® Yes Basin name:Neuse ❑No If yes,does the project comply with setbacks found in the river basin rules per 15A NBC_ .0200? ® Yes ❑No ➢ This includes Trout Buffered Streams per 15A NCAC 2B.0202 5. Does the project require coverage/authorization under a 404 Nationwide/individual permits ® Yes ❑No or 401 Water Quality Certifications? ➢ Please provide the permit number/permitting status in the cover letter if coverage/authorization is required. 6. Does project comply with 15A NCAC 02T.Oi05(c)( )(additional permits;'certifications)? ® Yes ❑No Per 15A NCAC 02T.0105(c)(6),directly related environmental permits or certification applications must be being prepared, have been applied for,or have been obtained. issuance of this permit is contingent on issuance of dependent permits(erosion and sedimentation control plans,stormwater management plans,etc.). 7. Does this project include any sewer collection lines that are deemed"high-priority?" ® Yes ❑No Per 15A NCAC 02T.0402,"high-priority sewer"means any aerial sewer,sewer contacting surface waters, siphon,or sewers positioned parallel to streambanks that are subject to erosion that undermines or deteriorates the sewer. Siphons and sewers suspended through interference/conflict boxes require a variance approval. ➢ If yes, include an attachment with details for each line, including type(aerial line,size,material,and location). High priority lines shall be inspected by the permittee or its representative at least once every six-months and inspections documented per 15A NCAC 02T.0403(a)(5)or the permittee's individual System-Wide Collection permit. FORM: FTA 06-21 Page 4 of 5 locuSign Envelope ID:B93665FE-553F-4C3C-9Al2-001B75FCBCE1 X. CERTIFICATIONS: 1. Does the submitted system comply with 15A NCAC 02T,the Minimum Design Criteria for the Permittinyof P_mp Stations and Force Mains(latest version),and the Gravity Sewer Minimum Design Criteria(latest version l as applicable? ® Yes ❑No If no, for projects requiring a single variance, complete and submit the Variance Alternative Design Request application (VADC 10-14) and supporting documents for review to the Central Office. Approval of the request will be issued concurrent!y with the approval of the vermit, and wo4ects requiring a variance avoroval may be subject to longer review times. For projects requiring two or more variances or where the variance is determined by the Division to be a significant portion of the project,the full technical review is required. 2. Professional Engineer's Certification: I, Donald A.Sever ,attest that this application for RTLP Water and Sewer Extensions (Professional Engineer's name from Application Item 111.1.) (Project Name from Application Item 11.1) has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications,engineering calculations,and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Minimum Design Criteria for Gravity Sewers(latest version),and the Minimum Design Criteria for the Fast-Track Permitting of Pump Stations and Force Mains(latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed$10,000,as well as civil penalties up to$25,000 per violation. Misrepresentation of the application information,including failure to disclose any design non-compliance with the applicable Rules and design criteria,may subject the North Carolina-licensed Professional Engineer to referral to the licensing board.(21 NCAC 56.0701) ._.........__............ _....... North Carolina Professional Engineer's seal,signature,and date: ,.�`N CARO�'�.,,, O O4'9'e� a SEAL ° 6 $/2023 i - 24627 [Docuftnedby:6 tA, SURLY' : O F,l, ��o 3DBEAMB636NBE i °°°•°GINL °°• J 3 Applicant's Certification per 15A NCAC 02T.0106(b): 1, Kathy ,attest that this application for RTLP Water and Sewer Extensions (Signature Authority Name from Application Item I + 4 (Project Name from Application Item 11 l) attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non-discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties,injunctive relief,and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed$10,000 as well a,�civil penalties up to$25,000 per violation. �K - Docuftrwd by: Signature: �I �tt�q Atg%�5Date: 6/28/2023 _ E0438205EBE04F8. FORM: FTA 06-21 Page 5 of 5 J C O <0 U O Z E w O ,r ,r c W .d Q O � O o � 0 c Q E � � cv U � O E � Q co � O � c y rn E c Q w co 0 c a � a c c� n. R U OL •� O --- C �0 C 0 C Q La Q C n °a �0 gn o m ° OL 4- � 0 t7 0a E Cl +j a° p N c Q a V o U G o Q , + w c4 a as C N w = i Q -- E o a � J C c ot: . c c E '}' N a�i a CL c G LL c Z w N o In 0 U C L U .0 QI � H f0 �'' .- c U 0 N r O N c0 %p � r O r m N r o t cn Of �1 O: _ C co '> G R O N (V A r 7 f M ..j p O W O � U O Z > co O CD 4- c O U c Z as a rn Q 04 Im N •41 r N O N M C co c0 L -a E w w m c w ao CO � C� > o v n v yam.- O N = O C a c z J cm �, E a� to a CL C o CL N a M J G J O J C) a Duke F est HILL500rougn OF, -Hillsboro bivii . - sir : sk --/'Paptar Ridge, 'l t Ayr Mount_ bimmocks Mill 70 %4X-7 1009 Colonial HiUs Piney Grove Wonial Park 01 Ln Oakdale Farms 7 wilciWoucl ILI o Stagecoach Run 5trayhorn Hills EXISTING Seven,Mills Farms SANITARY SEWER Ga r(a n d Acres Duke Forest Edeburn Division SANITARY SEWER V EXTENSION PROPERTY Brumley Fore Nature.Pre5er ant Ranch tao� as Unive Walnut Cow Fallsof New Hope 4d Rd r,\ Hideaway Estates -A NC Dept. of Environmental Quality Dec 8 2023 Raleigh Regional Office ID NOT TO SCALE BARRISTER RTLP WATER & SEWER EXTENSIONS SUt1*1t*11T HILLSBOROUGH, NC DESIGN AND ENGINEERING SERVICES ORANGE COUNTY State License#:P-0339 320 Executive Court U S G S - SITE MAP Hillsborough,NC 27278 Voice:(919)732-3883 Fax:(919)732-6676 www.summitde.net IPPYLtd EXI TING / SA TARY SEWER SANITARY SEWER EXTENSION — Now— ��f V fT& (001" • n co • PROPERTY ell I � NC Dept. of Environmental Quality Dec 8 2023 Raleigh Regional Office N NOT TO SCALE BARRISTER RTLP WATER & SEWER EXTENSIONS SUt1*1t*11T HILLSBOROUGH, NC DESIGN AND ENGINEERING SERVICES O RANGE COUNTY State License#:P-0339 320 Executive Court U S G S - SITE MAP Hillsborough,NC 27278 Voice:(919)732-3883 Fax:(919)732-6676 www.summitde.net Diversity Dr Legend RTLP Water and Sewer Extension Location W and Old Highway 86 Diversity Dr • Dodson Construction Durham Tech Community College Orange. UNC Hospitals HillsboroughCampus f - J r _ t, Diversity Dr 0 ! ` �H5 ♦— ool Dodson Ccns,rLVw Co Inc O S 1 .�► N From: Phillips,George L CIV USARMY CESAW(USA) To: Don Sever, PE Cc: Thomas,Zachary T Subject: Hillsborough Area EDD Phase 1 Water and Sewer Extension/Hillsborough/Orange County/SAW-2018-01629/ NWP 58 Date: Wednesday,April 26,2023 9:37:46 AM Attachments: NWP58.pdf Dear Mr. Don Sever, A preconstruction notification application (PCN) dated 09/21/2018, was submitted for the proposed activities and was provided via email dated 02/13/2023. Due to workload, the Corps was unable to provide timely formal written verification for impacts proposed in your preconstruction notification application. General Condition number 32, which lists the notification requirements for nationwide permits, states that "The prospective permittee shall not begin the activity: (1) Until notified in writing ...., or (2) If 45 calendar days have passed from the district engineer's receipt of the complete PCN and the prospective permittee has not received written notice from the district or division engineer." Accordingly, on 03/29/2023, the applicant, Orange County, was authorized to place fill or dredged material into waters, associated with the construction of the Hillsborough Area EDD Phase 1 Water and Sewer Extension project, under nationwide permit number 58, as proposed in the permit application dated 09/21/2018. 1 have attached a copy of the applicable permit conditions.The expiration date for the permit verification is March 14, 2026. Please note that your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the permit conditions and your submitted plans (see attached). Any violation of the conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order and/or appropriate legal action. It is your responsibility to contact the North Carolina Division of Water Resources (NCDWR) Raleigh Regional Office to determine the 401 requirements for this project. Please note that, if an Individual 401 WQC is required from NCDWR, the conditions of the Individual 401 WQC, once issued, are also conditions of the NWP referenced above. You may not conduct the activity authorized by the above referenced NWP without a valid 401 Water Quality Certification. Please let me know if you have any questions regarding this statutory verification, or any of the conditions of the permit. Lyle Phillips Regulatory Project Manager US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 588-9200 Fax: (919) 562-0421 Email: George.L.Phillips(@usace.army.mil We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at https://link.edgepilot.comcomV514e5833/liBMIZgi4OmA3wQ5kfzegA? u=https://regulator)z.ops.usace.army.mil/customer-service-survey/.Thank you for taking the time to visit this site and complete the survey. Links contained in this email have been replaced. If you click on a link in the email above, the link will be analyzed for known threats. If a known threat is found, you will not be able to proceed to the destination. If suspicious content is detected, you will see a warning. CAUTION:This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. NC Dept. of Environmental Quality STATE OF NORTH CAROLINA Dec 8 2023 COUNTY OF Orange Raleigh Regional Office Permit No. DEVELOPER'S OPERATIONAL AGREEMENT This AGREEMENT made pursuant to G.S. 143-215.1 (dl) and entered into this 8TH day of December 2023 , by and between the North Carolina Environmental Management Commission, au a ency of the State of North Carolina, hereinafter known as the COMMISSION; and Terra Equit I, LLC , a corporation/general partnership registered/licensed to do business in the State of North Carolina, hereinafter known as the DEVELOPER. WITNESSETH: 1. The DEVELOPER is the owner of the certain lands lying in Orange County, upon which it is erecting and will erect dwelling units and other improvements, said development to be known Research Triangle Logistics Park as (hereinafter the Development). 2. The DEVELOPER desires, to construct a wastewater collection system with pumps, wastewater treatment works, and/or disposal facilities (hereinafter Disposal System)to provide sanitary sewage disposal to serve the Development on said lands. 3. The DEVELOPER has applied to the COMMISSION for the issuance of a permit pursuant to G.S. 143- 215.1 to construct, maintain, and operate the Disposal System. 4. The DEVELOPER has created or shall create unit ownership in said dwellings units, other improvements and lands through filing of a Declaration of Unit Ownership (hereinafter Declaration), pursuant to Chapter 47C or 47F of the North Carolina General Statutes. 5. The DEVELOPER has caused to be formed or will cause to be formed at the time of filing of the Research Triangle Logistics Park Declaration, (hereinafter Association), a non-profit corporation organized and existing under and by the virtue of the laws of the State of North Carolina, for the purpose, among others, of handling the property, affairs and business of the Development; of operating, maintaining, re-constructing and repairing the common elements of the lands and improvements subject to unit ownership, including the Disposal System; and of collecting dues and assessments to provide funds for such operation, maintenance, re-construction andrepair. 6. The COMMISSION desires to assure that the Disposal System of the Development is properly constructed, maintained and operated in accordance with law and permit provisions in order to protect the quality of the waters of the State and the public interest therein. NOW, THEREFORE, in consideration of the promises and the benefits to be derived by each of the parties hereto, the COMMISSION and DEVELOPER do hereby mutually agree as follows: 1. The DEVELOPER shall construct the Disposal System in accordance with the permit and plans and specifications hereafter issued and approved by the COMMISSION, and shall thereafter properly operate and maintain such systems and facilities in accordance with applicable permit provisions andlaw. 2. The DEVELOPER shall not transfer ownership and/or control of the Disposal System to the Association until construction has been completed in accordance with the permit and approved plans, and the staff of the Division of Water Resources has inspected and approved of the facilities. In order to change the name of the permit holder, the DEVELOPER must request that the permit be reissued to the Association. The request must include a copy of the Association Bylaws andDeclaration. 3. The DEVELOPER shall not transfer, convey, assign or otherwise relinquish or release its responsibility for the operation and maintenance of its Disposal System until a permit has been reissued to the DEVELOPER's successor. FORM: DEV 03-19 Page 1 of 4. The DEVELOPER shall provide in the Declaration and Association Bylaws that the Disposal System and appurtenances thereto are part of the common elements and shall thereafter be properly maintained and operated in conformity with law and the provisions of the permit for construction, operation, repair, and maintenance of the system and facilities. The Declaration and Bylaws shall identify the entire wastewater treatment, collection and disposal system as a common element which will receive the highest priority for expenditures by the Association except for Federal, State, and local taxes and insurance. 5. The DEVELOPER shall provide in the Declaration and Association Bylaws that the Disposal System will be maintained out of the common expenses. In order to assure that there shall be funds readily available to repair,maintain or construct the Disposal System, beyond the routine operation and maintenance expenses, the Declaration and Association Bylaws shall provide that a fund be created out of the common expenses. Such fund shall be separate from the routine maintenance funds allocated for the facility and shall be part of the yearlybudget. 6. In the event the common expense allocation and separate fund are not adequate for the construction,repair, and maintenance of the Disposal System, the Declaration and Association Bylaws shall provide for special assessments to cover such necessary costs. There shall be no limit on the amount of such assessments, and the Declaration and Bylaws shall provide that such special assessments can be made as necessary at any time. 7. If a wastewater collection system and wastewater treatment and/or disposal facility provided by any city, town, village, county, water and sewer authorities, or other unit of government shall hereinafter become available to serve the Development, the DEVELOPER shall take such action as is necessary to cause the existing and future wastewater of the Development to be accepted and discharged into said governmental system, and shall convey or transfer as much of the Disposal System and such necessary easements as the governmental unit mayrequire as condition of accepting the Development's wastewater. 8. Recognizing that it would be contrary to the public interest and to the public health, safety and welfare for the Association to enter into voluntary dissolution without having made adequate provision for the continued proper maintenance, repair and operation of its Disposal System, the DEVELOPER shall provide in the Association Bylaws that the Association shall not enter into voluntary dissolution without first having transferred its said system and facilities to some person, corporation or other entity acceptable to and approved by the COMMISSION by the issuance of apermit. 9. The agreements set forth in numbered paragraphs 1, 2, 3, 4, 5, 6, 7, and 8 above shall be conditions of any permit issued by the COMMISSION to the DEVELOPER for the construction, maintenance, repair and operation of the Disposal System. 10. A copy of this agreement shall be filed at the Register of Deeds in the County(ies)where the Declaration is filed and in the offices of the Secretary of State of North Carolina with the Articles of Incorporation of the Association. 11. Notwithstanding anything herein to the contrary,this Agreement shall automatically terminate and be null and void at the time t l ggES C�te J i e�d�tsegeeelse ° e ed � iathiarmntwa cua inuc ongina0by the duly authorized representative of the parties hereto on the day and year written as indicated by each of the parties named below: rr q FOR THE ENVIRONMENTAL Te uity I, LLC MANAGEMENT COMMISSION Nam ofD PER B : Richard E. Rogers, Jr. (Signa NIre) Director, Division of Water Resources Fran ACsapo, CEO Print Name and Title `ZC (Date) (Date) FORM: DEV 03-19 Page 2 of 2 USUMMIT DESIGN AND ENGINEERING SERVICES Elaine Wilde September 21, 2023 Environmental Engineer Division of Water Resources—Raleigh Office RE: Research Triangle Logistics Park Sanitary Sewer Permit Project Narrative - Responses to Email dated 9/15/23 Dear Elaine, This letter is in response to email dated 9/15/23 regarding the FTSE application. The project entails providing an offsite sanitary sewer extension for a future industrial park. The flows for the industrial park will be allocated when the onsite sewers are permitted. The onsite configuration will consist of multiple buildings that will require a state extension permit since it is not just a single building lateral connection. To answer your question regarding anticipated future flow, the maximum allocation is up to 108,000 gallons per day. The Town of Hillsborough receives the flow downstream. The buffer authorization and 401 permit are presently being processed by the state. The 404 permit number is SAW-2018-01629 NWP expiring March 14, 2026. It is anticipated that the permit for the flow allocation will be requested in the next few months, with the actual construction completion of the first phase of the industrial park around Summer 2024. Please advise if you have any questions. I can be reached at don.severksummitde.com or 919 810-7950. Sincerely, Dom Sever Donald A. Sever, PE Senior Project Manager Raleigh Office 3301 Benson Drive, Suite 400, Raleigh, NC 27609 919.322.0115 // www.sunimitde.com 0 2023 LETTER OF TRANSMITTAL f.Zaleigh Regional Office TO. NCDEQ DATE: 6/30/23 PROD. NO.: 21-0061.010 3800 Barrett Drive RE: Research Triangle Logistics Park Water and Sewer Raleigh, NC 27609 Extensions ATTN: Water Quality Section WE ARE SENDING YOU ❑ Prints ❑ Reproducible ❑ Specifications Other n Copy of Letter ❑ Change Order ❑ Shop Drawings Attached ❑ Under Separate Cover ❑ Transmitted Via COPIES DRAWING DATE DESCRIPTION I+1 6/27/23 Fast track sewer system extension application FTA06-21 1 Check for$480 1 USGS map 1 Aerial map 1 Sec of state verification and old permit WQ0050240 TRANSMITTED [j] For Approval As Requested ❑ For Your Use ❑ For Review and Comment COMMENTS: This is a linear project to install sewer to an industrial park in the Town of Hillsborough. The project was approved on August 21, 2018 , WQ0050240, but wasn't constructed due to economic reasons. The name of the project was changed to Research Triangle Logistics Park Water and Sewer Extensions. The original permit was in the Town of Hillsborough name. The Town asked the permit be updated to the developers name,but the Town will maintain the lines after completion. COPY TO: SIGNATURE: Don Sever Raleigh Office 3301 Benson Drive,Suite 400,Raleigh, NC 21609 919.322.0115 // www.summitde.com From: Wild,Elaine To: Lentz,Zac Cc: Girgis,Andrew;Crisp, Dale Subject: RE: [External]RE: Research Triangle Logistics Park(RTLP)Water and Sewer Extensions—Additional Information Request Date: Monday,November 27,2023 11:05:00 AM Attachments: image001.pnng imaae002.Dna image003.pnna imaae004.Dna image005.pnng imaae006.Dna image007.pnng imaae008.Dna Zac, Thank you for the response. I read through the zero-flow guidance prior to reaching out for CO approval to proceed with the Fast Track permit. I will move forward with issuance. Thanks again, Elaine Wild Environmental Engineer Division of Water Resources - Raleigh Regional Office North Carolina Department of Environmental Quality 919.791.4254 Office elaine.wild6Ddeq.nc.gov R E Q�� Oey.rmwaafmnomwar Owe\ /— Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Sewer Extension Permitting I NC DEQ subchapter t rules.pdf(state.nc.us) From: Lentz, Zac<zac.lentz@deq.nc.gov> Sent: Monday, November 27, 2023 10:46 AM To: Wild, Elaine <elaine.wild@deq.nc.gov> Cc: Girgis, Andrew<andrew.girgis@deq.nc.gov>; Crisp, Dale <dale.crisp@deq.nc.gov> Subject: RE: [External] RE: Research Triangle Logistics Park (RTLP) Water and Sewer Extensions—Additional Information Request Hi Elaine, I do not see anything that necessarily precludes this from being issued as a fast track permit. My reasoning comes from the guidance document attached. Under Construction-only: "Used for permits where they do not have any upstream flow to be permitted imminently (imminent means within 3-6 months)..." and "Central office must ALWAYS be involved." I think there are several areas where the document could have stated that fast track is not appropriate, but does not, so I lean toward working with them if they opt to go that route. Please let me know if there's something I'm not considering here, otherwise I'm happy to help as much as I can as you proceed. Zac Zac Lentz,PE NPDES Municipal Permitting Division of Water Resources North Carolina Department of Environmental Quality 919.707.3620 (Office) zac.lentz&ded.nc.gov Please note that staffing levels are presently down and responses to inquiries may be delayed, and I apologize in advance. Many staff have a new email address extension which is "@deq.nc.gov". If you send to the original email address,it will be directed to the correct location. From: Wild, Elaine<elaine.wild(@deq.nc.gov> Sent: Monday, November 20, 2023 2:57 PM To: Girgis, Andrew<andrew.girgis(@deq.nc.gov>; Lentz, Zac<zac.lentz(@deq.nc.gov>; Crisp, Dale <dale.crisp(@deq.nc.gov> Subject: FW: [External] RE: Research Triangle Logistics Park (RTLP) Water and Sewer Extensions—Additional Information Request Hi All, I am looking for some further guidance on whether a construction only fast track permit should be issued and am hoping that one of you can help with that. The proposed project is for Research Triangle Logistics Park (RTLP) in Hillsborough. They are requesting a zero-flow fast track permit for the construction of GS only,499 LF of 8" GS and 2,205 LF of 12" GS, for future use of an industrial park that is to be constructed, timeline TBD. I have attached their FTA, narrative, and other related documents for you to review. Please let me know if this project is appropriate for fast track permit issuance or if you would like me to request additional information. Thank you, Elaine Wlld Environmental Engineer Division of Water Resources- Raleigh Regional Office North Carolina Department of Environmental Quality 919.791.4254 Office elaine.wild(@deq.nc.gov D E Q� oewrt�a tmvo-.wW owrry� Email correspondence toand from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Sewer Extension Permitting I NC DEQ subchapter t rules.pdf(state.nc.us) From: Don Sever, PE <don.sever(@summitde.com> Sent:Thursday, September 21, 2023 9:54 AM To: Wild, Elaine<elaine.wild(@deg.nc.gov> Cc:fcsapo(@barristercg.com; Marie Strandwitz<marie.strandwitz(@hillsboroughnc.gov>; KMathewsCcD ba rristercg.com Subject: [External] RE: Research Triangle Logistics Park(RTLP) Water and Sewer Extensions—Additional Information Request CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Elaine, We offer the following responses in red along with the attached PDF documentation. The responses have been collaborated with Marie Stranditz from the Town. Let us know if you have any questions. Thanks Don Donald Sever, PE Senior Project Manager Tel: 919-322-0115 x3239 SU14t*11T DESIGN AND ENGINEERING SERVICES From: Wild, Elaine<elaine.wild(@deq.nc.gov> Sent: Friday, September 15, 2023 8:00 AM To: kmathews(@barristercg.com; Don Sever, PE <don.sever(@summitde.com> Subject: Research Triangle Logistics Park (RTLP) Water and Sewer Extensions—Additional Information Request Hello Kathy and Don, After reviewing the Fast Track Sewer System Extension Application for Research Triangle Logistics Park (RTLP) Water and Sewer Extensions, additional information is required in order to further process the application. Please provide the following information by October 15. 2023, and note that the requested information must be submitted within 30 days of this request, or the applicant will be required to submit a new application and application fee in accordance with 15A NCAC 02T .0107. 1. According to Section V1.7.,the application is requesting zero flow. DWR is not inclined to permit "dry lines", zero flow. Could you give a timeline of when the industrial park will be built?Will the Town of Hillsborough take ownership of the sewer line once the project is completed?And can you give an approximate time of the permit submittal for it? RESPONSE: The industrial park will begin construction of the park in the upcoming months. It is anticipated that a line inside the industrial park will be designed and permitted within the next four months. The lines that are being built with this application are going to be maintained by the Town of Hillsborough upon town board acceptance after successful construction. Marie Strandwitz with the Town of Hillsborough has offered the following: This is an entirely offsite extension to plan for a vacant parcel on the outskirts of the town's service area with no other existing development nearby that will not have any flow for several years. When the vacant parcel develops, the extension permit for that sewer extension would have the capacity allocated and a FTSE showing the WWTP and the collection system have capacity will be provided. We request a zero-flow permit. The town does not want to have a double capacity allocation when the sewer extension for the parcel that will generate the flow is submitted and we feel requiring an allocation here and with the onsite parcel extensions will be very problematic for the division and the town to track and sort out.The town intends to submit a Form PNOCF to transfer the extension into their name once their board accepts the properly constructed and dedicated system.The town would like to understand this new division hesitation with zero flow permits. In this case again, there are no sewer laterals designed on this offsite outfall extension. There are zero developed parcels between the existing sewer connection point and the proposed development parcel. 2. Although there is currently zero flow, a Flow Tracking for Sewer Extensions (FTSE) Form may be required. The WWTF specified in Section IV of the application needs to verify that it has adequate capacity to accept the wastewater when the industrial park is complete and in operation and will not violate G.S. 143-215.67(a). Please refer to Section E of the Application Instructions for further information. RESPONSE: The future industrial park sewer extension permit will include the FTSE when flow is actually allocated to show the treatment plant and downstream pumping stations have adequate capacity for the anticipated flow.This application is not for the industrial park and capacity is not allocated in this application. 3. Submit a cover letter/narrative. The cover letter/narrative is to include specific information related to the project including system type, eventual flow allocation required, permit numbers associated with required sewer permits (downstream/upstream), buffer authorization certificate number, 401/404 permit number/permitting status letter, and any other relevant information that would assist in issuing the permit. Please refer to Section B of the Application Instructions for further information. a. Please include the timeline of the project and projected ownership in the narrative. RESPONSE: see narrative responses. 4. According to the Town of Hillsborough,Terra Equity is the developer for the RTLP Water and Sewer Extension project, however Section V1.2. was marked "No" and no Developer's Operational Agreement (DEV) form was submitted. Please submit the required Developer's Operational Agreement (DEV) form. RESPONSE: see attached form for rough draft. We don't think this is needed at this time. 5. The fast track project for the Town of Hillsborough was previously permitted for 3,823 LF (499 LF of 8" PVC, 1,1876 LF of 12" DI, and 1,448 LF of 12" PVC), but the current fast track application is requesting a total gravity sewer length is 2,704 LF. Please confirm the gravity sewer design criteria. RESPONSE: The town permit from several years ago was rescinded because of no activity and a change (reduction) in design, design engineer, and project owner. The current application is the current application and should be the only project application and plans considered for this project at this time. 5. The topographical map and aerial map provided are not sufficient. According to Section F of the Application Instructions, an 8.5-inch x 11-inch color copy of a USGS Topographic Map and an aerial map should be included with the application. The maps need to clearly identify the entire project area (not point), including the closest surface waters, general location of the gravity sewer, pumpstations, and force mains, and the downstream connection points for the receiving sewer. Please provide the required maps according to the application requirements. RESPONSE: see revised USGS map . 6. Please provide the Permit Number/Permitting Status letter for the 404/401 authorization specified in Section IX.S. of the Fast Track Application. RESPONSE: the 404 permit is dated 3/29/23 with an expiration date of March 14, 2026, see attached for copy. The 401 permit is presently being reprocessed. 15A NCAC 02T.0107 Staff Review and Permit Preparation states: • "(2) (e) If an application is accepted and later found to be incomplete, the applicant shall be advised how the application or accompanying supporting information may be modified to make it complete. The staff shall advise the applicant: (2) if all required information is not submitted within 30 days, the project will be returned as incomplete. Any resubmittal of a returned application shall be accompanied with a new application fee." Please contact me with any questions that you may have regarding this request. Sincerely, Elaine Wlld Environmental Engineer Division of Water Resources- Raleigh Regional Office North Carolina Department of Environmental Quality 919.791.4254 Office elaine.wild(@deq.nc.gov Depre..n a t�..o..�W ou+ery� Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official. CAUTION:This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. From: Don Sever, PE To: Wild,Elaine Cc: fcsapo(6barristercg.com; Marie Strandwitz; KMathews( barristercg.com Subject: RE: [External]RE: Research Triangle Logistics Park(RTLP)Water and Sewer Extensions—Additional Information Request Date: Friday,December 8,2023 10:03:38 AM Attachments: image001.pnng imaae002.Dna image003.pnng imaae004.png image005.pnng imaae006.png image007.pnng imaae008.Dna image775979.pnng imaae213728.Dna image810729.pnng imaae767507.ona image520179.pnng imaae085453.png image159034.pnng imaae073923.pna image528721.pnng RTLP DEV 03-19.Ddf RTLP usgs map FOR SEWER 2.pdf RTLP usgs map FOR SEWER.Ddf CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Elaine, Attached is the DEV form that you requested, along with two different USGS maps for the sewer connection. I believe this completes what you requested. Thanks Don Donald Sever, PE Senior Project Manager Tel: 919-322-0115 x3239 SUtlt4IT DESIGN AND ENGINEERING SERVICES From: Wild, Elaine<elaine.wild@deq.nc.gov> Sent: Friday, December 8, 2023 8:11 AM To: Don Sever, PE <don.sever@summitde.com> Cc:fcsapo@barristercg.com; Marie Strandwitz<marie.strandwitz@hillsboroughnc.gov>; KMathews@barristercg.com Subject: RE: [External] RE: Research Triangle Logistics Park (RTLP) Water and Sewer Extensions—Additional Information Request Don, When reviewing the map provided, it looks as those you are just pointing out where the proposed sewer is located and not where it ties into the existing downstream sewer system. Please indicate that on the map. Regarding the DEV form, there is no flow requirement associated with this requirement. Per 15A NCAC 02T.0115(b), If the applicant is a developer, an Operational Agreement shall be submitted with the permit application. Please provide the signed DEV form. Thank you, Elaine Wild Environmental Engineer Division of Water Resources - Raleigh Regional Office North Carolina Department of Environmental Quality 919.791.4254 Office elaine.wildl@deq.nc.gov D_EQ> aprb.m a tmrmnnu owi.� Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Sewer Extension Permitting I NC DEO subchapter t rules.pdf(state.nc.us) From: Don Sever, PE <don.sever(@summitde.com> Sent:Thursday, December 7, 2023 4:12 PM To: Wild, Elaine<elaine.wild(@deq.nc.gov> Cc: fcsapo(@barristercg.com; Marie Strandwitz<marie.strandwitzl@hillsboroughnc.gov>; KMathews�barristercg.com Subject: RE: [External] RE: Research Triangle Logistics Park (RTLP) Water and Sewer Extensions—Additional Information Request CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Elaine, We have modified the USGS exhibit to show the sewer connection. Is this sufficient for your comment? Regarding the DEV, the developer is questioning whether this is needed since there is no flow for the line. We can have them plug the line at the connecting manhole so that no flow will get into the existing sewer system if needed. Thanks Don Donald Sever, PE Senior Project Manager Tel: 919-322-0115 x3239 a SU1**#*11T DESIGN AND ENGINEERING SERVICES ®U©® From: Wild, Elaine <elaine.wild(@deq.nc.gov> Sent:Thursday, December 7, 2023 1:38 PM To: Don Sever, PE <don.sever(@summitde.com> Cc: fcsapol@barristercg.com; Marie Strandwitz<marie.strandwitz(@hillsboroughnc.gov>; KMathews(cDbarristercg.com Subject: RE: [External] RE: Research Triangle Logistics Park (RTLP) Water and Sewer Extensions—Additional Information Request Hi Don, Please see my responses in blue below and provide the required information by December 14, 2023. Thank you, Elaine Wild Environmental Engineer Division of Water Resources - Raleigh Regional Office North Carolina Department of Environmental Quality 919.791.4254 Office elaine.wildPdeq.nc.gov awrtn..n a tn.xmmear w,i,� Email correspondence to and from this address is subject to the Norlh Carolina Public Records Law and may be disclosed to third parties. Sewer Extension Extension Permittin�NC DEQDEQ subchapter t rules.pdf(state.nc.us) From: Don Sever, PE <don.sever(@summitde.com> Sent:Thursday, September 21, 2023 9:54 AM To: Wild, Elaine<elaine.wild(@deq.nc.gov> Cc: fcsapoPbarristercg.com; Marie Strandwitz<marie.strandwitz(@hillsboroughnc.gov>; KMathews(@barristercg.com Subject: [External] RE: Research Triangle Logistics Park (RTLP) Water and Sewer Extensions—Additional Information Request CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Elaine, We offer the following responses in red along with the attached PDF documentation. The responses have been collaborated with Marie Stranditz from the Town. Let us know if you have any questions. Thanks Don Donald Sever, PE Senior Project Manager Tel: 919-322-0115 x3239 SU11t411T DESIGN AND ENGINEERING SERVICES ®U©L From: Wild, Elaine<elaine.wild(@deq.nc.gov> Sent: Friday, September 15, 2023 8:00 AM To: kmathewsPbarristercg.com; Don Sever, PE <don.sever(@summitde.com> Subject: Research Triangle Logistics Park (RTLP) Water and Sewer Extensions—Additional Information Request Hello Kathy and Don, After reviewing the Fast Track Sewer System Extension Application for Research Triangle Logistics Park (RTLP) Water and Sewer Extensions, additional information is required in order to further process the application. Please provide the following information by October 15, 2023, and note that the requested information must be submitted within 30 days of this request, or the applicant will be required to submit a new application and application fee in accordance with 15A NCAC 02T .0107. 1. According to Section V1.7., the application is requesting zero flow. DWR is not inclined to permit "dry lines", zero flow. Could you give a timeline of when the industrial park will be built?Will the Town of Hillsborough take ownership of the sewer line once the project is completed?And can you give an approximate time of the permit submittal for it? RESPONSE: The industrial park will begin construction of the park in the upcoming months. It is anticipated that a line inside the industrial park will be designed and permitted within the next four months. The lines that are being built with this application are going to be maintained by the Town of Hillsborough upon town board acceptance after successful construction. Marie Strandwitz with the Town of Hillsborough has offered the following: This is an entirely offsite extension to plan for a vacant parcel on the outskirts of the town's service area with no other existing development nearby that will not have any flow for several years. When the vacant parcel develops, the extension permit for that sewer extension would have the capacity allocated and a FTSE showing the WWTP and the collection system have capacity will be provided. We request a zero-flow permit. The town does not want to have a double capacity allocation when the sewer extension for the parcel that will generate the flow is submitted and we feel requiring an allocation here and with the onsite parcel extensions will be very problematic for the division and the town to track and sort out.The town intends to submit a Form PNOCF to transfer the extension into their name once their board accepts the properly constructed and dedicated system.The town would like to understand this new division hesitation with zero flow permits. In this case again, there are no sewer laterals designed on this offsite outfall extension. There are zero developed parcels between the existing sewer connection point and the proposed development parcel. The Division is limiting the amount of permits where there is no upstream flow to be permitted imminently (imminent means within 3-6 months) or planned (e.g. upstream is unknown), due to the difficult task of tracking the activation of allocated flow for all systems. This item was addressed with DWR Central Office and it has been determined that the zero flow permit may be issued as a Construction ONLY permit, once the remaining information is received by the RRO. 2. Although there is currently zero flow, a Flow Tracking for Sewer Extensions (FTSE) Form may be required. The WWTF specified in Section IV of the application needs to verify that it has adequate capacity to accept the wastewater when the industrial park is complete and in operation and will not violate G.S. 143-215.67(a). Please refer to Section E of the Application Instructions for further information. RESPONSE:The future industrial park sewer extension permit will include the FTSE when flow is actually allocated to show the treatment plant and downstream pumping stations have adequate capacity for the anticipated flow.This application is not for the industrial park and capacity is not allocated in this application. Zero flow permit may be issued as a Construction ONLY permit, once the remaining information is received by the RRO. 3. Submit a cover letter/narrative. The cover letter/narrative is to include specific information related to the project including system type, eventual flow allocation required, permit numbers associated with required sewer permits (downstream/upstream), buffer authorization certificate number, 401/404 permit number/permitting status letter, and any other relevant information that would assist in issuing the permit. Please refer to Section B of the Application Instructions for further information. a. Please include the timeline of the project and projected ownership in the narrative. RESPONSE: see narrative responses. Completed 4. According to the Town of Hillsborough,Terra Equity is the developer for the RTLP Water and Sewer Extension project, however Section V1.2. was marked "No" and no Developer's Operational Agreement (DEV)form was submitted. Please submit the required Developer's Operational Agreement (DEV) form. RESPONSE: see attached form for rough draft. We don't think this is needed at this time. Please have Frank Csapo sign the DEV form and resubmit it. 5. The fast track project for the Town of Hillsborough was previously permitted for 3,823 LF (499 LF of 8" PVC, 1,1876 LF of 12" DI, and 1,448 LF of 12" PVC), but the current fast track application is requesting a total gravity sewer length is 2,704 LF. Please confirm the gravity sewer design criteria. RESPONSE: The town permit from several years ago was rescinded because of no activity and a change (reduction) in design, design engineer, and project owner. The current application is the current application and should be the only project application and plans considered for this project at this time. Thank you for the clarification. 5. The topographical map and aerial map provided are not sufficient. According to Section F of the Application Instructions, an 8.5-inch x 11-inch color copy of a USGS Topographic Map and an aerial map should be included with the application. The maps need to clearly identify the entire project area (not point), including the closest surface waters, general location of the gravity sewer, pumpstations, and force mains, and the downstream connection points for the receiving sewer. Please provide the required maps according to the application requirements. RESPONSE: see revised USGS map. Please update the topo map to include the location where the proposed sewer ties into the existing downstream collection system. 6. Please provide the Permit Number/Permitting Status letter for the 404/401 authorization specified in Section IX.S. of the Fast Track Application. RESPONSE: the 404 permit is dated 3/29/23 with an expiration date of March 14, 2026, see attached for copy. The 401 permit is presently being reprocessed. Completed 15A NCAC 02T .0107 Staff Review and Permit Preparation states: • "(2) (e) If an application is accepted and later found to be incomplete, the applicant shall be advised how the application or accompanying supporting information may be modified to make it complete. The staff shall advise the applicant: (2) if all required information is not submitted within 30 days, the project will be returned as incomplete. Any resubmittal of a returned application shall be accompanied with a new application fee." Please contact me with any questions that you may have regarding this request. Sincerely, Elaine Wlld Environmental Engineer Division of Water Resources- Raleigh Regional Office North Carolina Department of Environmental Quality 919.791.4254 Office elaine.wildt@deq.nc.gov z,�eDEQ�/ dwrt��a[n.vo.iwar w,� Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official. CAUTION:This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. CAUTION:This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. CAUTION:This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. From: Marie Strandwitz To: Wilson,Susan A Cc: Robinson.Jason;Wild.Elaine;giant Green Subject: Re:[External]FW:Research Triangle Logistics Park(RTLP)FTSE application Date: Friday,August 11,2023 9:53:24 AM Attachments: image002.Dno imaae003.ona innage005.ono imaae006.ona image007.Dno imaae009.ona innage010.Dno innaae012.ona image013.Dno imaae014.ona image015.Dna imaae016.ona innage018.Dno CAUTION:External email.Do not click links or open attachments unless verified.Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. It may be the applicant's narrative was not updated to match the application. They said they applied for new. Thanks!! Sent from my iPhone On Aug 11,2023,at 9:32 AM,Wilson, Susan A<susan.wilson@deq.nc.gov>wrote: OK Marie—just want to let you know we've gotten this. I'll make sure I coordinate with Jason. I think he had sent us an email about the confusion with that modification,so this may clear things up a bit. I don't see any reason for an FTSE if it's zero flow. From: Marie Strandwitz<marie.strandwitz@hillsboroughnc.gov> Sent:Thursday,August 10, 2023 4:52 PM To:Wilson,Susan A<susan.wilson@deq.nc.gov>; Robinson,Jason <jason.t.robinson@deq.nc.gov>;Wild, Elaine<elaine.wild@deq.nc.gov> Cc: Bryant Green<Bryant.Green@Hillsboroughnc.gov> Subject: [External] FW: Research Triangle Logistics Park(RTLP) FTSE application CAUTION:External email.Do not click links or open attachments unless verified.Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Hello Susan, Elaine, and Jason, I'm sorry there has been a mix up going on with this project's sewer permitting. While I am asking to rescind WQ0040240,the developer is trying to modify it at the same time and that is not appropriate. I asked the developer to submit a brand-new permit application for this project as I edited in the attached, and I've asked to rescind WQ0040240 for reasons explained in the attached E-mail (for Jason's info). I'm working with Susan and Elaine to rescind the permit and I guess Jason is working with the developer on a supposed modification at the same time. I don't know what they submitted for an application!Jason,this is an entire offsite extension that will not have any connections for several years. It only goes to a vacant parcel on the outskirts of our service area with no other existing development nearby.When the developer builds on that parcel,the extension permit for that sewer would have the capacity allocated. If the division is requiring capacity allocations for all extensions, then utilities are going to have double allocations and that is going to be very messy and incorrect. We request a zero- flow permit.There is nothing else developed in this area.The town intends to submit a Form PNOCF to transfer the lines into our name once our board accepts the system.This is a long-term spec project, and the town does not want the regulatory responsibility to oversee idle sewer mains for the next several years as the developer builds out their project per our agreement with them and if the developer does not gain acceptance of the system in a timely manner. I have advised the developer they were to submit for a new permit application. I will let them come back to Jason and advise to withdraw the modification as I formalize my E-mail request for rescission of the current permit per Susan's request. For a zero flow application,would form FTSE be required? Thanks! Sorry about that. Marie K. Marie Strandwitz I PE Utilities Director Town of Hillsborough 105 E. Corbin St. Hillsborough, North Carolina <image002.png> Office:919-296-9631 <image003.png> <image005.png> <image006.png> <image007.png> Email correspondence to and from this address may be subject to the North Carolina public records law and may be disclosed to third parties. From: Marie Strandwitz<marie.strandwitz(@hillsboroughnc.gov> Date:Thursday,August 10, 2023 at 4:33 PM To: Don Sever, PE<don.sever(@summitde.com>, Green, Bryant (Bryant.Green(@durhamnc.gov)<Bryant.Green(@durhamnc.gov> Cc:fcsapo(@barristercg.com<fcsapo(@barristercg.com> Subject: Re: Research Triangle Logistics Park(RTLP) FTSE application Don, You were not supposed to modify that permit at all per our prior discussions. I've already requested the division rescind that permit.You were supposed to submit for a brand new permit. I haven't even provided you a FTSE for your permit. It would be zero flow as it is an offsite extension. I'm going to speak with Jason about this. I wasn't aware he was helping still since he moved to DWI. Marie From: Don Sever, PE<don.sever(@summitde.com> Date:Thursday,August 10, 2023 at 4:28 PM To: Marie Strandwitz<marie.strandwitz(@hillsboroughnc.gov>, Green, Bryant(Bryant.Green(@durhamnc.gov)<Bryant.Green(@durhamnc.gov> Cc:fcsaao(@barristercg.com<fcsaao(@barristercg.com> Subject: FW: Research Triangle Logistics Park(RTLP) FTSE application Marie, <!--[if!supportLists]-->1. <!--[endif]-->For the FTSE,the state had some comments on the FTSE that we needed to address.See the following below. The main question that I have for you is this: The original permit included zero flow,and the new app states that this is an extension to an industrial park. While I realize that the original permit included zero flow,that was a bit of an oversight in DWR's review,and we've since been instructed to only issue"no flow" permits in unique situations. Section .0114 of the 2T Rules states that 880 gal/acre should be used in situations like this: <image008.jpg> The question is how many acres or GPD should we ask for on this project. Thanks Don <image009.png> Donald Sever, PE Senior Project Manager Tel: 919-322-0115 x3239 <image010.png> <image012.png> <image010.png> <image013.png><image014.png><image015.png><image016.png> <image009.png> From:Robinson,Jason<iason.t.robinson(@deq.nc.gov> Sent:Tuesday,August 8,2023 5:13 PM To:Don Sever, PE<don.sever(@summitde.com> Cc:Thomas,Zachary T<zachar)1.thomas(@deq.nc.gov>;Smith,J Chris <chris.smith(@deq.nc.gov>; Manuel,Vanessa<vanessa.manuel(@deq.nc.gov>; Wilson,Susan A<susan.wilson(cDdeq.nc.gov>; Evans,Tony V <ton)1.evans(a deq.nc.gov> Subject: RE: Research Triangle Logistics Park(RTLP) FTSE application Hi Don, I haven't been able to review this application yet, but I just did a cursory review. It appears that you're requesting a modification to an existing permit (WQ0040240)to change the name from the Town to an LLC? If that's the case,Section II of the application should have been checked "Existing",and the permit number should have been provided in that Section of the app. <image017.jpg> I also have the following questions: <!--[if!supportLists]-->1. <!--[endif]-->The narrative states that the application is requesting to change the name from the Town to the LLC, but then states that the Town will maintain the line after completion. Is the Town wanting the permit to stay in the LLCs name(and therefore they're technically the owners of the line), but the Town will maintain the LLC's line? If the Town plans to own the line,then they'd have to request to change it back in their name later. <!--[if!supportLists]-->2. <!--[endif]-->The original permit(WQ0040240) included 3,324 LF of 12"gravity. However,the new application only specifies 2,205 LF of 12"gravity. Was this changed since the original permit was issued? <!--[if!supportLists]-->3. <!--[endif]-->The original permit included zero flow, and the new app states that this is an extension to an industrial park. While I realize that the original permit included zero flow,that was a bit of an oversight in DWR's review,and we've since been instructed to only issue"no flow" permits in unique situations. Section .0114 of the 2T Rules states that 880 gal/acre should be used in situations like this: <image008.jpg> Please provide written responses via email to the above questions. Thanks, Jason "Please note that I am no longer with DWR,but am temporarily assisting with the Fast-Track Sewer Ext Program" Jason Robinson,PE Division of Water Infrastructure Department of Environmental Quality Jason.T.Robinson(@deq.nc.gov From:Thomas,Zachary T<zachary.thomas(@deq.nc.gov> Sent:Tuesday,August 8,2023 3:49 PM To:Don Sever, PE<don.severna summitde.com> Cc: Robinson,Jason jason.t.robinson(@deq.nc.g_ov. Subject: RE: [External] Research Triangle Logistics Park(RTLP) FTSE application Hi Don, Sorry for the delay in this response, I was on vacation for a few days and I am playing catch up on emails. It appears that this FTSE application is currently under review by Jason Robinson. I have cc'd him here so that he is looped in on your request below. (FTSE#WQ0044542) Thank you, Zach Thomas Environmental Program Consultant, Division of Water Resources North Carolina Department of Environmental Quality Office: (919)791-4255 zachary.thomas(cadeq.nc.gov **Please note my new email address** Raleigh Regional Office 1628 Mail Service Center Raleigh, NC 27699-1628 <image018.png> Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From:Don Sever, PE<don.sever(@summitde.com> Sent: Monday,July 24,2023 2:00 PM To:Thomas,Zachary T<zachary.thomas(@deq.nc. og_v> Subject: [External] Research Triangle Logistics Park(RTLP) FTSE application CAUTION:External email.Do not click links or open attachments unless verified.Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Zach, I was hoping that you might be able to assist me. I was trying to find out the status of a FTSE application we submitted on 6/30/23. Attached was the Letter of transmittal that we dropped off for the project in the Town of Hillsborough Orange County). This project was previously approved under the Town of Hillsborough. The Town wanted us to revise the permit to be under the property owners name. Other than that there was no other changes to the plans. Can you help us out? Thanks Don <image009.png> Donald Sever, PE Senior Project Manager Tel: 919-322-0115 x3239 <image010.png> <image012.Vng> <image010.png> <image013.pne><image014.png><image015.png><image016.png> <image009.png> Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official. Links contained in this email have been replaced. If you click on a link in the email above,the link will be analyzed for known threats. If a known threat is found,you will not be able to proceed to the destination. If suspicious content is detected,you will see a warning. CAUTION:This email originated from outside of the organization.Do not click links or open attachments unless you recognize the sender and know the content is safe.