Loading...
HomeMy WebLinkAboutNCC233802_Site Plan or Location Map_20231222 EROSION CONTROL LEGEND 1 ---- \ ,\ �^r ESPC BMP LINETYPE/SYMBOL REFERENCE pP EXp� "'\ DUST CONTROL A .�� DETAIL 10,SHEET C06.7 NI' O \ / ® CONSTRUCTION EXIT DETAIL S,SHEET C08.7 SEDIMENT FENCE pETAIL 5,SHEET 006.6 417. / TS TEMPORARY SEEDING 0 DETAIL II,SHEET C08.7 • eb)11) • I I / .. / ...6 // // ® INLET PROTECTION ® DETAIL 7,SHEET CD6.6 Il ill/ j / /// /// RIP RAP O ? � DETAIL 13,SHEET CA8.8 ��' �� I l - I \% \\ '/ // Q PERMANENT SEEDING O DETAIL It,SHEET C06.7 /�� /+ I `1, / \\ A \\ --_ // 50D SODDING 50D SEE LANDSCAPE PLANS E K�'�V P'r Il I \�\ \ --__ \e_ _ // LIMITS OF CONSTRUCTION L SEE PLANS II / I I\ \� a -__ / I i / / SKIMMER Q DETAIL 14,SHEET CO8.8 l / \ // I / \\ // BAFFLE ® DETAIL I5,SHEET C06.8 PANDA EXPRESS,INC. \\ OA' \\\\\ --// \ 1 1/ // INLET DRAINAGE AREA SEE PLANS 1683 WALNUT GROVE AVE. F-__� '2,..,:„.., yi \ . / ROSEMEAD,CALIFORNIA 91770 .. _ --S s_---' I \ I `A / // SILT FENCE DRAINAGE AREA \A SEE PLANS Jl I ` _ / _ �_ -- _ -�-_ -- I I / I / / TELEPHONE:26.72.8 898 / / OUTLET DRAINAGE AREA I/-1 SEE PLANS FACSIMILE:8 26.7 9.988 // \\ II /y10 / / / /SPORTSMAN DIVE \ / // SEE LANDSCAPE/TREE PROTECTION PLANS FOR LEGEND ll \11 II / l ( Vriable Width Pu IIC R/W \ \ "` I I SPECIFIC TO THOSE SHEETS. 11 / II / $ I I s llideas,designs, na awereW9emen�annP�o property d plans indicated or I >s� / / r Panda 11 - I / l / °s N\ I ESPC NOTES Pre specific .^ !� /I __ -__ ____ _ CONTRACTOR TO CONSTRUCT/ (� Express None of these ideas,designs,arrangements or I -� T \/ I l sc 1 plans may be used by or disclosed to any person,firm,or 1 II LIMITS OF CONSTRUCTION / TEMPORARY UNDERDRAIN/CULVERT ,y GENERAL / / / o f UNDERNEATH THE PROPOSED__ //_ / I \ corporation without the written permission of 1 II I I / / CONSTRUCTION ENTRANCE. I I Panda Express Inc. I I I 1.EROSION CONTROL MEASURES SHALL BE MAINTAINED AT ALL TIMES. / II yye / / 0 CP / / / o / ' \ l IF FULL IMPLEMENTATION OF THE APPROVED PLAN DOES NOT ___ J ---7___ PROVIDE FOR EFFECTIVE EROSION CONTROL ADDITIONAL EROSION I 1 / X -�, „ X om 1 66s / I I �\ I CONTROL MEASURES AND PRACTICES SHALL BE IMPLEMENTED TO V X \ °sc„ \ CONTROL OR TREAT THE SEDIMENT SOURCE AT THE EXPENSE OF ,I I •' .µ ® / r_ X / I I \ \ THE CONTRACTOR. REVISIONS: /' / / /�% / / � 2.THE ESCAPE OF SEDIMENT FROM THE SITE SHALL BE PREVENTED BY 11 I I GO- -` I/ \� `®�-i-•_ / \ \ THE INSTALLATION OF EROSION AND SEDIMENT CONTROL MEASURES 1 CITY COMMENTS 10-25-23 J' / i •-_e \ \ AND PRACTICES PRIOR TO LAND DISTURBING ACTIVITIES. 1 / 11 N. ' / •i_ •: I 2 CITY COMMENTS 12-12-23 \ (, i�„q,�.�i i••�_ \ 3.ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD GREATER THAN / II 11 • ,� \ \�,iiii��i-�ii,�i��� / \ \ SEEDING.DAYS SHALL BE STABILIZED WITH MULCH OR TEMPORARY �� \\ 1111 -i•�ii ii�Iiiiiiii��` J \\ \ Ili 11 / aq\� ` \ '"�.� iii/iii�i••0•' 4.ANY AMENDMENT TO THE EROSION CONTROL PLANS WHICH HAVE A III �•��� 1�N�1i-i�i 0iPelli G SIGNIFICANT EFFECT ON BMPS WITH A HYDRAULIC COMPONENT / �- �� tto I • • �L'- MUST BE CERTIFIED BY THE DESIGN PROFESSIONAL. 11 �iiv ��-iiii�ii .Q f i 00 • `/--Q•iii•i �.�1iii�iii7 / •S�y N. \ 5.THE PERMITEE IS ONLY RESPONSIBLE FOR THE FOR THE 11 A i i `� \ INSTALLATION AND MAINTENANCE OF STORM WATER MANAGEMENT / / \+ I I GI I I �•���i�i.i�i b 474/ r\ \ DEVICES PRIOR TO STABILIZATION OF THE SITE AND NOT THE �. •Pi.•• 7 \ \ OPERATION AND MAINTENANCE OF SUCH STRUCTURES AFTER I II / I I I . s'�oi••..-i•i d,.. 9 / ( I 10 i i --i i i i i/- 4 s p CONSTRUCTION ACTIVITIES HAVE BEEN COMPLETED. 11��iiil�iiiyiii O. \ \ / i i i i i i i i' N. \ fi.EROSION CONTROL AND TREE PROTECTION MEASURES SHALL BE I II I/ I X i---•---T \ l\ \ INSTALLED PRIOR TO ANY OTHER CONSTRUCTION ACTIVITY AND ' / m I I ����i-i-O-O-i-lt-i �\�� /I \ \ MAINTAINED UNTIL PERMANENT GROUND COVER IS ESTABLISHED. \ AIL z • i�VI��-i-i-O•i�i1 [A, 7.SEE GRADING&DRAINAGE NOTES. ISSUE DATE: P / III I %iri-i-i-i•i--� �'� \ ®� J \\ \\ PLAN CHECK 03-08-23 I IHI 1111 / / I ��i:-=-�i=�=��\ r "<� 1 \\ SLOPES AND DISTURBED AREA STABILIZATION BID 08-11-23 / \ I / I x / .--2 I I I i' ire ��� \ / N. 1.CONCENTRATED FLOW AREAS AND ALL SLOPES 2H:1V OR STEEPER CONSTRUCTION XX-XX-XX \\ / \I/ n 1 I / ®"7 _.1,-_ SHALL BE STABILIZED WITH THE APPROPRIATE EROSION CONTROL A =, I \ / / I / I I I MATTING OR BLANKET. ra0n \ 2.ALL CUT AND FILL SLOPES MUST BE SURFACE ROUGHENED AND r ` / CONCRETE WASHOUT PIT t0 ' SILT FENCE OUTLET(SEE VEGETATEp WITHIN(7)pAVS OF THEIR CONSTRUCTION. /ll /SIN / ® ® f ( I DC I I I \y r� DETAILI ON SHEET C06.4I. 3.ALL DISTURBED AREAS SHALL BE GRASSED AS SOON AS fill CONSTRUCTION PHASES PERMIT.NO EXPOSED GRADE WILL BE LEFT I / JI e, LIMITS OF CONSTRUCTIi N Ir / 665 / I I TS I C \\ 1I \ UNSTABLE FOR MORE THAN 7 DAYS. 4.PERMANENT GRASSING AND LANDSCAPING OF DISTURBED AREAS V me e LL1 y• SHALL BE COMPLETED AS QUICKLY AS POSSIBLE. TEMPORARY I I _____ I I I At SHALL�, \ �\ STABILIZATION BY MULCHING AND/OR TEMPORARY SEEDING WILL BE I - - rn / \ REQUIRED IN THE EVENT OF PROJECT DELAYS. (I,Jll / // llx I ���' _ I I I Q (� \\\\ 5.WIRE MESH REINFORCED SEDIMENT BARRIERS SHALL BE PLACED AT DRAWN BY:NK IV II III 6 / i �661)-� I / \ I �/.i S\ \ \\ THE TOE OF ALL FILL SLOPES.II 11 • / _ DRAINAGE / / % / PROPOSE PUBLICST,- SKIMMER(SEE DETAIL \\/ p 1.ALLDRAINAGESTRUCTURESSHALLBEEROSION PROOFED.1II / / / I pRAINAGEASEMENT \ \ 2.CONTRACTOR SHALL SELECT APPROPRIATE INLET PROTECTION FORP'4NDA PROJECx'T#'D249�JC I� / . A PANDA STORE#:3796 1 EACH INLET PER FIELD CONDITIONS. II 11 / IqON g / / - 1��� v CIVIL PROJECT#:220148 IIl II/ / III 1 % / ----1 ti�L_, / \ / ' / / / / I �• \\\ MAINTENANCE AND INSPECTIONS / / J�=•1 BAFFLES SEDIMENT AND EROSION CONTROL MEASURES AND PRACTICES II 1 _ / I \ SHALL BE INSPECTED DAILY. II / / I 1 \ /I� / - C � �.A A ' / \ 2.SEDIMENT STORAGE MAINTENANCE INDICATORS MUST BE INSTALLED �► L • IN SEDIMENT STORAGE STRUCTURES, INDICATING THE 1/3 FULL II/ll / / ll\I 1 / r A---- % / `'L7�,.. / r J�L',/Ir N. \ VOLUME. I, II Il I I I © 7 `� / j \, 3.SEDIMENT CONTROL DEVICES MUST BE INSPECTED DAILY AND II7 Z•�Z I I _..-- I ' TCj xik / `. CHECKED AFTER EACH STORM EVENT AND CLEANED OR REPLACED ,- I N G E N I U M r / C1 -1- I / / IWHEN THEY REACH 1/3 OF DESIGN CAPACITY. �y� / 4.MAINTENANCE OF ALL SOIL AND SEDIMENTATION CONTROL Yiwi Z I I �,,. / / / / MEASURES AND PRACTICES,WHETHER TEMPORARY OR PERMANENT, • h° p6XA. / / / SHALL BE AT ALL TIMES THE RESPONSIBILITY OF THE CONTRACTOR. INGENIUM ENTERPRISES,INC. / OF I I p� I o / / / �Q� r 19445 SHUMARD OAK DR. IT /it / �0 �7+� I I ��.• " - - - / / / / / SUITE 102 -+4• I „�_ I- - / LAND 0 LAKES,FL 34638 II I� / 7�� I I / 1 }ea+caw 1 I / / / BASED IN THE WEB SOIL SURVEY PHONE:(813)387-0084 a � _ _ �I / o oao> I ill\ 2,600sP - / / / INFORMATION,ALL SOILS AT THIS SITE I �y6 At• A I ,� / `��' FFE=661.15' / / _� .h� / ARE CLASSIFIED AS CuB2-CULLEN NCBEES CERTIFICATE#C-4114 a,oj III I / / / / / / / CLAY LOAM,2 TO 8 PERCENT SLOPES, IIII l„I /gi - Illl IN ( // / / i / // / MODERATELY ERODED. II �` / I�I / � /� _ � DC // �� II II / / [ '� / TS / LIMITS OF CONSTRUCTION / III // // IIIIII ��alk // L ID U� ' J Ev ,--- g �/ /� / / TOTAL DISTURBED AREA THIS / PHASE: 1.50 AC. III z II // // II II �II ! syy� // // / �� ADDITIONAL MEASURES MAY BE II m III I %/ / - - / / REQUIRED-CONTRACTOR IS II / I�I I - . // RESPONSIBLE FOR THE CONTROL North l ..: OF SEDIMENT ON SITE.IF THE fE II=II( / / II =1 _ _66D_ _ __ / Carolina 'CEO APPROVED EROSION AND i 1 _ www.nc811.or9 a III \\\ / / II DI I�\ >7� / + m ® _ - / SEDIMENTATION CONTROL • 1 656) / / MEASURES PROVE INSUFFICIENT, �\/ II ' / I III > '/ ,, (655) / / ` FNOINE�Q I > -(654);' - C } \ / THE CONTRACTOR MUST TAKE 'oFgF Y. :Q�t�' II \ / /IIII 1 p ?� + ss3 667 t / THOSE ADDITIONAL STEPS X/ \/ _ 652 - 6y' \ / NECESSARY TO STOP 24-HOUR CONTACT: )z�lz�2 I` / by x om x x JOE CELENTO R\ 0 11 I < _ --�� / �r _ / SEDIMENTATION FROM LEAVING = - o lI ? / / //< \ / THE SITE. (912)272-4811 111/ l ll ? / / /- { \\_ m� _,\ / ESPC PLAN I II / �11� .s,cN- } / // / - T `PROPOSE EMPORARY '� ` �� //_ J - GRADING PHASE II 1`1 , / ` GRADING/ONSTRUyON-EASE 6NT' \ / / IX�I I / 2 / ? \ \ - I 7 `) \�A "11� l\� / �/� /� _ A 1--\ \ �a, ( O6 . 2 \ J sI o ppm \ SCALE:1"=20' I,II \IA o PANDA HOME REV4