Loading...
HomeMy WebLinkAboutNCC233799_ESC Approval Submitted_20231222 IIENDERON COUNTY SOIL EROSION AND SEDIMENT CONTROL OFFICE December 21, 2023 LETTER OF APPROVAL WITH CONDITIONS SHJ Development LLC Attn: Martie Murphy 124 E. Thompson St. Thomaston, GA 30286 RE: Project Name: TWAS Hendersonville at Chimney Rock Rd Acres Approved: 1.10 acres Project ID: SESC 2023-11-04R County: Henderson City: City of Hendersonville Address: 2549 Chimney Rock Rd(35.347970, -82.432250) PIN: 9579-69-6240 River Basin: French Broad River Basin Stream Classification: Unnamed tributary of Allen Branch Submitted By: Tommie L. Little, PE Date Received by HC: May 09, 2023 Plan Type: New Date Received by HC: December 18, 2023 Plan Type: Revisions Dear Mr. Murphy, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan shall expire three (3) years following the date of approval, if no land disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNO1) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the applicable annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a 240 SECOND AVENUE EAST, SUITE 118 HENDERSONVILLE, NC 28792 TELEPHONE: (828) 694-6521 Letter of Approval Tidal Wave Auto Spa December 21,2023 Page 2 of 44 new COC. Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66),this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form,which you provided.You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, 1utO Jekv1,SAI-Cv-v Assistant Engineer Soil Erosion& Sedimentation Control Office Enclosures: Certificate of Approval ec: Parker Evans, EIT, Seamon Whiteside & Associates, LLC Tyler Morrow, City of Hendersonville Stan Aiken PE, DEQ—Asheville 240 SECOND AVENUE EAST, SUITE 118 HENDERSONVILLE, NC 28792 TELEPHONE: (828) 694-6521 Letter of Approval Tidal Wave Auto Spa December 21,2023 Page 3 of 4 CONDITIONS • ZONING APPROVAL FROM THE JURISDICTION HAVING AUTHORITY. NO WORK TO BEGIN PRIOR TO OBTAINING THIS APPROVAL AND SUBMITTING TO OUR OFFICE FOR THE FILE. • A DRIVEWAY PERMIT REQUIRED FROM THE JURISDICTION HAVING AUTHORITY (IF REQUIRED). NO WORK TO BEGIN PRIOR TO OBTAINING THIS PERMIT AND SUBMITTING TO OUR OFFICE FOR THE FILE. • AN ENCROACHMENT AGREEMENT FOR WORK PROPOSED IN THE RIGHT OF WAY, SUCH AS SIDEWALK, UTILITIES, ETC (IF REQUIRED). NO WORK TO BEGIN PRIOR TO OBTAINING THIS DOCUMENT AND SUBMITTING TO OUR OFFICE FOR THE FILE. • THE APPROVED SOIL EROSION AND SEDIMENTATION CONTROL PLAN TITLED "TIDAL WAVE AUTO SPA"DATED NOVEMBER 20, 2023, IS REFERENCED HERE AND INCORPORTED INTO THIS LETTER OF APPROVAL. • OBTAIN NOI FROM NC DEQ AS INSTRUCTED IN THIS LETTER. • FOLLOW THE SELF-INSPECTION, RECORDKEEPING AND REPORTING REQUIREMENTS DESCRIBED ON SHEET C4.5 OF THE APPROVED DRAWING "TIDAL WAVE AUTO SPA"DATED NOVEMBER 20, 2023. • PRE-CONSTRUCTION MEETING REQUIRED PRIOR TO LAND DISTURBANCE. CONTACT DEB JOHNSTON AT (828) 694-6521 TO SCHEDULE. Financial Responsible Ownership Signature: Print Name and Title: Date: 240 SECOND AVENUE EAST, SUITE 118 HENDERSONVILLE,NC 28792 TELEPHONE: (828)694-6521