HomeMy WebLinkAboutNCC233799_ESC Approval Submitted_20231222 IIENDERON COUNTY
SOIL EROSION AND SEDIMENT CONTROL OFFICE
December 21, 2023
LETTER OF APPROVAL WITH CONDITIONS
SHJ Development LLC
Attn: Martie Murphy
124 E. Thompson St.
Thomaston, GA 30286
RE: Project Name: TWAS Hendersonville at Chimney Rock Rd
Acres Approved: 1.10 acres
Project ID: SESC 2023-11-04R
County: Henderson
City: City of Hendersonville
Address: 2549 Chimney Rock Rd(35.347970, -82.432250)
PIN: 9579-69-6240
River Basin: French Broad River Basin
Stream Classification: Unnamed tributary of Allen Branch
Submitted By: Tommie L. Little, PE
Date Received by HC: May 09, 2023
Plan Type: New
Date Received by HC: December 18, 2023
Plan Type: Revisions
Dear Mr. Murphy,
This office has reviewed the subject erosion and sedimentation control plan. We find the
plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of
Approval must be posted at the job site. This plan shall expire three (3) years following the
date of approval, if no land disturbing activity has been undertaken, as is required by Title
15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (eNO1) form requesting a Certificate of Coverage (COC) under
the NCG010000 Construction General Permit. After the form is reviewed and found to be
complete, you will receive a link with payment instructions for the applicable annual permit
fee. After the fee is processed, you will receive the COC via email. As the Financially
Responsible Party shown on the FRO form submitted for this project, you MUST obtain the
COC prior to commencement of any land disturbing activity. The eNOI form may be
accessed at deq.nc.gov/NCG01. Please direct questions about
the eNOI form to the Stormwater Program staff in the Raleigh central office. If the
owner/operator of this project changes in the future, the new responsible party must obtain a
240 SECOND AVENUE EAST, SUITE 118
HENDERSONVILLE, NC 28792
TELEPHONE: (828) 694-6521
Letter of Approval
Tidal Wave Auto Spa
December 21,2023
Page 2 of 44
new COC.
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following
documentation be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic
inspection to ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring
protection of existing natural resources and adjoining properties. If, following the
commencement of this project, it is determined that the erosion and sedimentation control
plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of
1973 (North Carolina General Statute 113A-51 through 66),this office may require revisions
to the plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and
State water quality laws, regulations, and rules. In addition, local city or county ordinances
or rules may also apply to this land-disturbing activity. This approval does not supersede
any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in
the Financial Responsibility Form,which you provided.You are requested to file an amended
form if there is any change in the information included on the form. In addition, it would be
helpful if you notify this office of the proposed starting date for this project. Please notify us
if you plan to have a preconstruction conference.
Your cooperation is appreciated.
Sincerely,
1utO Jekv1,SAI-Cv-v
Assistant Engineer
Soil Erosion& Sedimentation Control Office
Enclosures: Certificate of Approval
ec: Parker Evans, EIT, Seamon Whiteside & Associates, LLC
Tyler Morrow, City of Hendersonville
Stan Aiken PE, DEQ—Asheville
240 SECOND AVENUE EAST, SUITE 118
HENDERSONVILLE, NC 28792
TELEPHONE: (828) 694-6521
Letter of Approval
Tidal Wave Auto Spa
December 21,2023
Page 3 of 4
CONDITIONS
• ZONING APPROVAL FROM THE JURISDICTION HAVING AUTHORITY. NO
WORK TO BEGIN PRIOR TO OBTAINING THIS APPROVAL AND SUBMITTING
TO OUR OFFICE FOR THE FILE.
• A DRIVEWAY PERMIT REQUIRED FROM THE JURISDICTION HAVING
AUTHORITY (IF REQUIRED). NO WORK TO BEGIN PRIOR TO OBTAINING
THIS PERMIT AND SUBMITTING TO OUR OFFICE FOR THE FILE.
• AN ENCROACHMENT AGREEMENT FOR WORK PROPOSED IN THE RIGHT OF
WAY, SUCH AS SIDEWALK, UTILITIES, ETC (IF REQUIRED). NO WORK TO
BEGIN PRIOR TO OBTAINING THIS DOCUMENT AND SUBMITTING TO OUR
OFFICE FOR THE FILE.
• THE APPROVED SOIL EROSION AND SEDIMENTATION CONTROL PLAN
TITLED "TIDAL WAVE AUTO SPA"DATED NOVEMBER 20, 2023, IS
REFERENCED HERE AND INCORPORTED INTO THIS LETTER OF APPROVAL.
• OBTAIN NOI FROM NC DEQ AS INSTRUCTED IN THIS LETTER.
• FOLLOW THE SELF-INSPECTION, RECORDKEEPING AND REPORTING
REQUIREMENTS DESCRIBED ON SHEET C4.5 OF THE APPROVED DRAWING
"TIDAL WAVE AUTO SPA"DATED NOVEMBER 20, 2023.
• PRE-CONSTRUCTION MEETING REQUIRED PRIOR TO LAND DISTURBANCE.
CONTACT DEB JOHNSTON AT (828) 694-6521 TO SCHEDULE.
Financial Responsible Ownership Signature:
Print Name and Title:
Date:
240 SECOND AVENUE EAST, SUITE 118
HENDERSONVILLE,NC 28792
TELEPHONE: (828)694-6521