Loading...
HomeMy WebLinkAboutNCG120072_Email Approval of Action Plan_20231221 Eplin, Jerry W From: Eplin, Jerry W Sent: Thursday, December 21, 2023 3:47 PM To: Caroline Funderburk Cc: Peterson, Kathryn S;Josh Davis Subject: RE: [External] Re: Action Plan submitted for TSS at outfall SDO-003 Hello Ms. Funderburk: Based on the information you submitted, DEMLR believes that the Action Plan that you have proposed is appropriate for the site. Please implement and keep us informed of its effectiveness. Regards, Jerry W. Eplin, PE Assistant Regional Engineer North Carolina Department of Environmental Quality Division of Energy, Mineral, and Land Resources Office: (704)235-2147 Email:jerry.eplin@deq.nc.gov Physical and Mailing Address: 610 E. Center Ave. Suite 301 Mooresville, NC 28115 D,E QR&7,A- 6pp�r�mmt{of�n�nronmpn inl p�allYy Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties From: Caroline Funderburk<clafave@garrett-moore.com> Sent:Thursday, December 7, 2023 9:06 AM To: Eplin,Jerry W<jerry.eplin@deq.nc.gov> Cc: Peterson, Kathryn S<kathryn.peterson@deq.nc.gov>;Josh Davis<Josh.Davis@clevelandcountync.gov> Subject: [External] Re:Action Plan submitted for TSS at outfall SDO-003 CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Mr. Eplin, Attached are the original and revised design calculations for the storage volume of basin S13-5,the basin associated with Outfall SDO-003 (see Attachment 5 and Figure 2 of the previously submitted action plan).The 1 minimum storage volume required for the drainage area to SB-5 is 15,354 cubic feet.The original volume provided in SB-5 (at the elevation of the primary outlet)was 68,148 cubic feet.The extra foot of rock below the skimmer in SB-5 will effectively reduce the volume of the basin by 8,954.2 cubic feet, resulting in an effective storage volume of 59,193.8 cubic feet.The effective storage volume of SB-5 will still exceed the required minimum storage volume for the drainage area following the proposed modification. Thankyou, Caroline L. Funderburk, P.E. 1029 W. South St. Raleigh, NC 27603 Mobile: 919.738.9583 WWW.garrett-moore.com From: Eplin,Jerry W<jerry.eplin@deq.nc.gov> Sent: Sunday, November 26, 2023 2:59 PM To: Caroline Funderburk<clafave@garrett-moore.com> Cc: Peterson, Kathryn S<kathryn.peterson@deg.nc.gov> Subject:Action Plan submitted for TSS at outfall SDO-003 NC DEQ has reviewed the "Corrective Action Plan for Total Suspended Solids at Outfall SDO-003"for the Cleveland County Landfill Facility. Upon review DEQ needs additional information. The skimmer design calculations were provided; however, the basin design was not provided. DEQ is generally supportive of the proposed plan for adding an extra foot of rock below the skimmer to keep it out of the collected sediment. However, this means that the basin would never fully drain, thus the effective volume of the basin would be reduced. Can you provide information on basin design showing that it will achieve the required design volume with the reduction caused by this modification? Jerry W. Eplin, PE Assistant Regional Engineer 2 North Carolina Department of Environmental Quality Division of Energy, Mineral, and Land Resources Office: (704) 235-2147 Email: jerry.eplin(a�deq.nc.gov Physical and Mailing Address: 610 E. Center Ave. Suite 301 Mooresville, NC 28115 -.,a��D.— E Email correspondence to and from this address is subject to the North Caro/Ina Public Records Law and may be disclosed to third parties Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official. 3